Kitchen renovation with arches in Fort Pienc, Barcelona
Carrer de Ribes, Barcelona · 12 m² · 2026

Project details
- Floor area
- 12 m²
- Property type
- Flat
- Duration
- 8 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 15,500–18,000 €
- What we did
- Arched openings · White kitchen with an overhanging bar · Oak floor · Recessed lighting
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
A long, narrow flat resolved with arched openings and a white kitchen with an overhanging bar, so the hallway stops being just a hallway.
The problem with this flat was the one in so many flats in old buildings: long, narrow and with a hallway that ate up the floor space. Instead of closing more off, arches were opened.
The arches remove the tunnel feeling without losing the separation between zones, and the kitchen opens onto that passage with an overhanging bar that serves as a breakfast bar — the hallway becomes somewhere to be, not just somewhere to pass through.
The kitchen is in white with an induction hob and a sink with a pull-out tap, and the oak floor runs from end to end to reinforce the continuity.
A flat renovation in Fort Pienc that gains spaciousness without knocking down a single load-bearing wall.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.