Renovations · Terrassa

Old house restoration in Terrassa

Renovating old houses and flats in Terrassa: first the inspection and trial holes in beams, vaults and roof, then the quote. So you do not buy or sign blind.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Full home renovation

An old house is priced after it is opened up, not before.

Anyone looking to renovate a village house in Terrassa usually has the house in hand already, or is about to sign. Our advice is always the same: before you put down a euro, a technical visit with the house opened up at the points that matter. Terrassa has a stock of houses inherited from its textile era, with party-wall houses in the Sant Pere core and early-twentieth-century buildings in the ensanche, the city’s expansion district. No two are alike inside, and the price depends on what the walls are hiding.

The first thing we look at is the timber beams of the floor and of the roof. With an awl and a hammer you can tell sound timber from timber attacked by woodworm or by damp from an old leak. Then the bearings: a beam rotten at the end, where it enters the wall, can be mended; a roof that has been letting water in for decades may force you to rebuild the whole pitch. That difference moves the budget more than any finish.

Cracks are read by their shape. A fine vertical hairline next to a wall junction is usually an old settlement that has long since stabilised. A diagonal crack that widens, or that follows the width of a lintel, calls for a look at the foundations and for crack gauges before you decide anything. If the house has a Catalan vault or thin-brick ceilings, their condition is checked and they are kept wherever possible: it is structure that already works and is expensive to replace.

The rest of the inspection is less showy and just as costly: the original electrical installation with no earth, lead pipework or fibre cement, and fibre-cement downpipes in old buildings. With all that on the table, the quote comes out fixed item by item and you know what is mandatory, what is recommended and what can wait. Without trial holes, any figure per square metre is a bet, yours or ours.

Living room of an old flat under renovation, with timber beam and exposed brick ceiling, a balcony door at the back, a step ladder and paint tins on the floor
Prices

What a full renovation costs.

Indicative market ranges per square metre of floor area, VAT excluded. The final price is a fixed quote after the survey.

What a full renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversPer m² (excl. VAT)
FunctionalStandard finishes, practical solution520 – 650 €/m²
High specification / luxuryPremium materials and high-end interior design1,060 – 1,340 €/m²
Indicative prices · VAT not included. A full renovation of an 80–100 m² home typically lands between 41,300 and 103,000 € depending on specification. What moves the number is not the paint. It is how many wet rooms you have, whether the layout changes, and whether the building can take it. A flat where the kitchen and bathroom stay put sits at the bottom of each band; moving both, plus opening a load-bearing wall with a calculated steel, sits at the top. VAT is 10% on a renovation of a home that has been built and occupied for at least two years, and 21% otherwise — we show it as its own line so you can check which applies to you.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by floor area.

Full renovation of the whole property, from functional to mid-range specification, VAT excluded.

Studio or one-bedUp to 60 m²31,400 – 63,000 €

One bathroom, one kitchen. The price per square metre is higher in a small home, because the kitchen and bathroom cost almost the same whether the flat is 45 or 90 m².

Two-bed flat60 – 90 m²34,400 – 78,600 €

The most usual size, with a kitchen, one or two bathrooms and a new layout. This is the size where opening the kitchen into the living room pays off most.

Three-bed flat90 – 120 m²43,300 – 111,800 €

More floor and wall surface to finish and, often, two full bathrooms. Worth checking the riser capacity before planning a second wet room away from the first.

Large flat or houseOver 120 m²From 61,100 €

Large flats and houses. The budget depends heavily on specification and layout, and heating and cooling become a real design decision.

These figures assume the structure is sound. If the survey finds damp, aluminosis-affected concrete or a roof at the end of its life, that is a separate priced item and we will tell you before you commit, not halfway through. Damp treatment and façade work are quoted on their own.

No small print

What is included and what is not.

The scope of a turnkey full renovation, and the things that genuinely sit outside it.

✓ Included in the price

  • Strip-out, clearance, skips and skip permits
  • New water supply and waste runs throughout
  • New consumer unit, circuits and earthing, with electrical certificate
  • Extraction and ventilation to kitchen and bathrooms
  • New partitions and the agreed layout
  • Levelling, plastering and making good
  • Flooring throughout
  • Bathrooms: waterproofing, tiling, sanitaryware and brassware
  • Kitchen: units, worktop, sink, tap and extractor
  • Internal doors, skirting and fitted wardrobe carcasses
  • Two coats of paint throughout
  • Sockets, switches and light fittings
  • Permit filing and the submission to the residents’ association
  • Snagging and a written warranty

✕ Not included — quoted separately

  • Appliances, unless listed in your quote
  • Loose furniture, blinds and decoration
  • Structural work — steels, slabs, underpinning — priced separately once calculated
  • Façade, roof and communal areas, which belong to the building, not the flat
  • Damp or concrete repair found during the strip-out
  • Air conditioning, unless listed in your quote
  • Council taxes and fees where they apply
  • Architect’s fees where a full project is legally required

VAT is shown as its own line: 10% where the property is a home at least two years old, 21% where it is not, or on work billed to a company. If you are buying the flat and renovating it before you move in, the dates matter — tell us the completion date and we will tell you which rate applies.

In the same town

Other services in Terrassa

The same team and the same fixed quote, for the rest of the home in Terrassa.

The same work, elsewhere

Old house restoration in other areas

What you find inside an old house changes with the area and with the period it was built.

Common questions

Frequently asked questions

Renovating an old house or flat in Terrassa: what you ask before signing.

What is the price per m² of a full renovation of an old house in Terrassa?

We do not give a price per square metre without seeing the house, because in an old home the range is enormous. A house with sound beams and a roof in good condition and another with an attacked floor and a roof to rebuild can differ by many tens of thousands of euros, with the same floor area. After the visit and the trial holes, the quote is fixed item by item and stated excluding VAT, with the structural work separated from the finishes.

What should be checked before buying an old house in Terrassa?

Timber beams and their bearings, the state of the roof, damp from the ground or from leaks, cracks and how they evolve, and the electrics and plumbing. It is also worth checking the planning situation and whether there are any charges on the property. A technical visit before signing costs far less than discovering a roof or a floor to rebuild once the house is yours. We can come along to that visit and tell you what we find before you sign anything.

How is a village house in Terrassa renovated without anything falling down?

It starts with the diagnosis, and the work goes from the inside out: temporary props, reinforcing or replacing damaged beams and bearings, the roof, and only then partitions, services and finishes. In party-wall houses like those in the Sant Pere core, we also take care over whatever shares a wall with the neighbour. If the structure is touched, you need a project from a competent technician and a licence or prior notification from Terrassa’s Ajuntament.

Does restoring old houses in Terrassa need a licence?

It depends on the scope. A renovation that touches neither structure nor façade usually goes by prior notification. If the work involves floors, roof, load-bearing walls or the façade, you need a technical project and a works licence. If the building has protected elements, the corresponding authorisation is needed as well. We handle it, and we look at it on the visit so the timescale does not catch you by surprise.

Can an old flat in Terrassa be renovated, for example in a building in the ensanche?

Yes, and it is common. Flats from the early twentieth century have high ceilings, mouldings and sometimes joinery or tiles worth keeping. Before anything is knocked down, we check the floor, the services and whether there is ventilation onto the courtyard. The main work is usually electrics and plumbing, plus the common sense of deciding what is restored and what is modernised. If the flat is in a community building, we agree working hours with the neighbours.

How long does a full renovation of an old home in Terrassa take?

For a complete old house, allow several months, and the exact timescale is set by the diagnosis: a roof or a floor to rebuild lengthens the job more than any finish. The licence or notification also conditions the start date. Once the trial holes are open and the quote approved, we give you a phased programme, and we tell you if anything changes on site.

What gets most expensive in the renovation of an old house?

What you cannot see on a viewing: attacked beams, damp from the roof, a floor that cannot carry what you want to put on top, or services that have to be redone from scratch. That is why we prefer to open trial holes before quoting. With the structural items identified from the start, little changes during the work, and it is always discussed with you.

Do you renovate old houses in every neighbourhood of Terrassa?

Yes: Centre, Sant Pere, Ca n’Aurell, Can Palet, Les Fonts, Vallparadís and the rest of the city. The visit to diagnose the house is the first step in any of them, and it decides the scope: in Sant Pere, timber floors and party walls weigh most; in the ensanche, original services and protected elements worth keeping.

Free quote

Get your old house restoration quote in Terrassa

Free survey anywhere in Catalonia, in English, and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →