Renovations · Terrassa

Kitchen renovations in Terrassa

Kitchens renovated in the real Terrassa: houses in the old town, working-class vila homes and flats in Ca n’Aurell or Can Palet. Design to the measure of each home and a quote fixed item by item.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Kitchen renovation

Renovating the kitchen in Terrassa, house by house.

Terrassa grew around its factories, and it shows in the kitchens we renovate: the city mixes century-old houses in the casc antic, working-class homes of narrow plan and whole blocks put up in the sixties and seventies, when the city filled with people who came to work in textiles. Each one calls for a different solution.

In the houses of the Centre and the working-class quarter the kitchen is usually at the back, next to the yard behind — we renovate it by opening it to the dining room and using that rear façade to ventilate and light it. In block flats, the fine work is in squeezing out few metres: parallel runs, units up to the ceiling and appliances built into towers.

One detail we do not overlook in Terrassa: limescale. Hard water punishes taps, kettles and dishwashers, so we fit taps that tolerate it well and leave the supply ready for a water softener if you want one — it is cheaper to do it with the kitchen open than to regret it afterwards.

The formalities are on us: comunicació prèvia to the Ajuntament de Terrassa for the kitchen renovation and a technical project if a load-bearing partition is touched. With the community, agreed hours and protected common areas — so that you notice the work in your new kitchen, not your neighbours on the staircase.

A newly bought house with the previous owners’ kitchen intact is the best possible starting point: with no units to save, the job is designed cleanly from the first drawing and every euro of the budget goes further.

Floor-to-ceiling units and a black-framed glass cabinet above the cement-effect worktop
Made to measure

Every Terrassa home calls for a different kitchen.

We do not design a building in the Centre the same as a flat in Can Palet. Here is what we usually do in each type of home.

House in the casc antic

High ceilings, thick walls and the odd surprise when you open up. We recover what is worth keeping — vaults, exposed brick — and hide the new services without giving anything up.

Working-class vila home

A narrow, elongated plan with a back yard. The kitchen opens to the dining room and the yard façade becomes its source of light and natural ventilation.

Flat of the ’60s–’70s

Ca n’Aurell, Can Palet, Sant Pere Nord: small, closed kitchens. Parallel or L layout, tall units up to the ceiling and the electrics brought up to date, with their certificate.

More recent building

Here the renovation is skin-deep: fronts, worktop and well-thought-out lighting. The face of the kitchen changes without touching services, in two weeks and with little dust.

No small print

The part of the budget you cannot see but which pays for itself.

Three invisible items we never cut, and why.

Electrics with a certificate

Induction, oven and dishwasher call for dedicated circuits and a consumer unit up to the job. We leave it legalised with its certificate — the paper that the utility, the insurer and the next buyer will ask for.

New plumbing and drains

Reusing old pipework in a new kitchen is saving nothing twice over: we replace it as far as the stopcock, with well-ventilated drains that do not run slow or smell in summer.

Extraction that extracts

A well-ducted hood when the building allows and good recirculation when it does not, with the make-up air thought through. A kitchen open to the living room without serious extraction is paid for every day in smells.

Prices

What a kitchen renovation costs.

Indicative ranges by specification and appliances, VAT excluded. The final figure comes from the survey.

What a kitchen renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversIndicative range (€)
FunctionalStandard finishes, practical solution4,800 – 7,500 €
Design / high endPremium materials and high-end interior design13,300 – 19,500 €
Indicative prices · VAT not included. The kitchen is the room where the range is widest, because appliances, the worktop and the units can multiply the cost on an identical layout. Opening the kitchen into the living room typically adds 1,500 to 4,000 € depending on the wall and whether it carries load. We itemise all of it so you can choose where the money goes.
Calculator

What might your new kitchen cost?

Indicative estimate4,800 – 7,500 €Functional · Medium (8–12 m²)
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by kitchen size.

Indicative ranges for a full kitchen renovation, VAT excluded.

Small kitchenUp to 8 m²4,800 – 17,400 €

The galley kitchen of a city flat. Made-to-measure storage is what makes these work, and it is where the budget should go.

Medium kitchen8 – 14 m²5,000 – 18,600 €

The most common size. Enough room for a breakfast bar or a peninsula and a proper run of worktop.

Large kitchenOver 14 m²5,900 – 19,500 €

Island and dining space. At this size the design and the appliances set the price, not the square metres.

Opened into the living roomOpen-planFrom 15,000 €

The single change that transforms a flat most. Add the partition and structural item on top of the kitchen itself.

In a kitchen the floor area matters less than the material grades, the worktop and the appliances. That is why we price a specific design rather than a rate per square metre — and why the quote names what is in it.

No small print

What is included and what is not.

The scope of a turnkey kitchen renovation, and what normally sits outside it.

✓ Included in the price

  • Strip-out, clearance and removal of the old kitchen
  • New water supply, waste runs and extraction duct
  • Dedicated appliance circuits with electrical certificate
  • Splashback tiling or cladding, and the floor
  • Base and wall units and the worktop
  • Sink, tap and extractor hood
  • Task lighting and general lighting
  • Fitting and integration of appliances you supply
  • Snagging and a written warranty

✕ Not included — quoted separately

  • Appliances, other than those itemised in your quote
  • Pans, crockery and small accessories
  • Opening the kitchen into the living room, unless itemised
  • Relocating the boiler or the gas installation, unless planned
  • Council taxes and fees where they apply
  • Loose furniture and decoration

VAT (10% or 21% depending on your case) is always shown as its own line. If you are supplying the appliances we will fit and integrate them — just tell us the models before we design the units, because a freestanding fridge and an integrated one need different openings.

In the same town

Other services in Terrassa

The same team and the same fixed quote, for the rest of the home in Terrassa.

The same work, elsewhere

Kitchen renovations in other cities

Each city has its own housing stock, its own buildings and its own permits.

Common questions

Frequently asked questions

Kitchen renovations in Terrassa: what people ask before starting.

How much does it cost to renovate a kitchen in Terrassa?

At functional specification, between 4,800 and 7,500 € excluding VAT; at mid-range, 6,600 to 10,300 €. In Terrassa the figure is moved above all by the condition of the services: in old buildings and flats of the seventies it almost always pays to renew plumbing and electrics while the kitchen is open. The quote is fixed, item by item, after the free visit.

My home is a working-class vila house: which kitchen fits?

The one that makes use of the long plan instead of fighting it: a kitchen open to the dining room, a single run towards the back yard and the wet zone against the rear façade to ventilate without gimmicks. It is the renovation that gains most light in this type of Terrassa house.

What do you do about limescale in the water?

We take it seriously: taps with finishes that resist hard water, appliances with anti-scale programmes and, if you want, pre-installing a water softener while the plumbing is open. It costs little during the job and extends by years the life of everything the water touches.

Can the kitchen be opened to the living room in a block flat?

In most flats in Ca n’Aurell, Can Palet or Sant Pere, yes: the partitions are usually dividing walls, not load-bearing. We check before designing and, if it turns out to be structural, it is opened all the same with a calculated lintel and a technical project. The kitchen-living room is the renovation that changes these flats most.

What permit is needed in Terrassa?

To renew the kitchen without touching the structure, a comunicació prèvia to the Ajuntament de Terrassa, which we file — it does not delay the start. If a load-bearing partition is knocked down or the building is protected, it is processed with a project. We leave everything sorted before the first blow of the hammer.

How long does a kitchen job take?

Two to four weeks: replacing fronts is at the low end, and a kitchen opened to the living room with new services at the high end. We give you a written programme with the quote, agree hours with the community and the rubble leaves in sacks with its permit.

Do you fit the appliances or do I?

Whichever suits you better. The quote is itemised, so you can order them from us with the job, bring them yourself or combine. We only need models and sizes before making the units: every opening is made exact, with no cover strips of regret.

Which areas of Terrassa do you work in?

The whole city — Centre, Ca n’Aurell, Can Palet, Sant Pere, Sant Pere Nord, La Maurina, Les Arenes — and the towns around: Matadepera, Viladecavalls, Vacarisses and Sant Quirze del Vallès. The technical visit is free across the whole area.

Do you do changes of fronts and worktop without a full renovation?

Yes, and they are very worthwhile in flats where the layout is already right: fronts, worktop, sink and taps in one or two weeks, without touching sound tiling. It is the perfect bridge renovation when the budget does not stretch to everything.

What happens if a surprise turns up when you open up?

It is documented with photos, priced separately and not carried out without your written yes. Our quote closes what is foreseeable; what is not — a rotten stack, a hollow wall — is decided with you and with the figure in front of you, never with the job held hostage.

I have never had a dishwasher: does it cost much to add one?

Less than you imagine if it is done within the renovation: a drain, a water supply and its socket, all allowed for in the design of the unit. Adding it to a kitchen already fitted is joinery and plumbing out of sequence; adding it now is almost free. Tell us your habits and we size the machine that suits.

Can you give me a price without coming to see the kitchen?

An indicative one, yes — with your measurements and four photos we can narrow it down quite a lot, and this page’s calculator gives you an honest first range. A fixed one, no: without checking services, walls and access we would be guessing, and what we sign is not guessed. The visit is free and commits you to nothing.

Free quote

Get your kitchen quote in Terrassa

Free survey anywhere in Catalonia and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →