Building envelope · Catalonia

Insulation and waterproofing in Catalonia

Keep the water out and keep the heat in: two things that save money and prevent trouble. We waterproof roofs and terraces and insulate façades and ceilings, with the right solution for each building.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Insulation and waterproofing

The two jobs that protect everything else.

A building has two enemies: water and temperature. Water destroys things slowly and expensively; temperature makes a home uncomfortable and costly to run. Both are controlled by the building’s envelope — roof, façade, terraces, floors against the ground — and both are cheaper to deal with than to suffer.

Waterproofing is cheap relative to the damage a leak does. The common failures are at the edges: where a membrane meets a wall, around an outlet, at a threshold. A membrane that is perfect across the middle and badly finished at the edges is a leak waiting for the next storm. Insulation is the opposite kind of investment: it pays back slowly in lower bills and quickly in comfort, and it is the work that grants favour most.

The two are often done together, and it is cheapest that way: scaffolding is the dominant cost of façade work, and an open roof is the cheapest moment to add insulation. For specific jobs, see rooftops, terraces, façade restoration and, for a leak you already have, damp treatment.

Narrow flat hallway with grey impact-insulation membrane laid across the entire floor, a white radiator and red and white tape at the far end
How it runs

Insulating and waterproofing, step by step.

Days to a few weeks, depending on the area. Weather decides the sequence for anything external.

01

Survey and diagnosis

We find where water enters and where heat escapes, using moisture readings and, where useful, thermal imaging.

02

Choosing the solution

Membrane, external insulation, internal insulation or a combination, according to the building and the budget.

03

Preparation

The surface is cleaned, repaired and made sound. A membrane laid on a poor substrate fails.

04

Waterproofing

A continuous membrane, turned up at every edge and sealed at every penetration, and flood-tested where possible.

05

Insulation

External insulation (SATE) on a façade, insulation above the membrane on a roof, or insulation to ceilings and walls from inside.

06

Finishing

Render, paving or cladding to protect and finish the work.

07

Handover

Warranty, and a written record of what was installed.

How we work

How we run an envelope project.

01

Free survey

We find the cause and report in writing. No cost and no obligation.

02

Fixed quote

An itemised quote, with options side by side.

03

Build, with one site manager

One person runs the job and watches the weather.

04

Handover and warranty

A warranty on the waterproofing and on the insulation.

Why us

Why use us for insulation and waterproofing.

We find the cause first

A leak or a cold wall has a source. We diagnose before we quote.

Edges done properly

Where membranes fail is at the details, and that is where we spend the time.

Both in one visit

Insulating while the scaffolding is up or the roof is open is far cheaper.

The right system for the building

We do not apply one product to every building.

Help with grants

Insulation is the work energy-efficiency support most often covers.

Warranty on the work

Waterproofing and insulation each carry a warranty.

Prices

What insulation and waterproofing cost.

Per square metre, VAT excluded.

What insulation and waterproofing cost — Indicative prices · VAT not included
WorkWhat it coversPer m² (excl. VAT)
WaterproofingStandard finishes, practical solution40 – 90 €/m²
Roof insulationPremium materials and high-end interior design60 – 130 €/m²
Indicative prices · VAT not included. The price depends on the area, the access and the solution. Waterproofing is inexpensive compared with the cost of repairing the damage a leak does. Insulation pays for itself in energy savings and is often eligible for support. Everything is itemised.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate3,200 – 7,200 €Waterproofing · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

By work

What it costs by type of work.

Indicative ranges, VAT excluded.

Roof / rooftopWaterproofing40 – 90 €/m²

Renewing the waterproofing of flat roofs and rooftops.

FaçadeInsulation (SATE)90 – 160 €/m²

External thermal insulation, which removes thermal bridges.

Terrace / courtyardWatertightnessFrom 50 €/m²

Waterproofing terraces and courtyards and re-paving.

Basement / retaining wallDampAsk us

Waterproofing and drainage of basements and buried walls.

Insulating from the outside is better physics and costs more; insulating from the inside is cheaper and loses floor area. If you own the whole building, outside is almost always right. If you own one flat in a block, the façade is common property and the decision is the community’s. See works for residents’ associations.

No small print

What is included and what is not.

The scope of an envelope job, and what is separate.

✓ Included in the price

  • Survey, moisture readings and written diagnosis
  • Surface preparation and repair
  • Continuous waterproofing membrane with upstands
  • Flood test where possible
  • Insulation: external, roof or internal as agreed
  • Render, paving or cladding
  • Safe access
  • A written warranty

✕ Not included — quoted separately

  • Scaffolding, where billed as a separate line
  • Replacement windows
  • Structural repair found during the work
  • Municipal fees and licences
  • Works needing the owners’ association’s consent
  • Internal redecoration

VAT can be at the reduced rate on energy-efficiency works in a home, and we confirm which applies in the quote.

Where we work

Where we insulate and waterproof.

Across Barcelona and Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners ask about insulation and waterproofing.

I have a leak. How do you know where it comes from?

By looking at the pattern and testing it. Water enters in one place and often shows in another, so we use moisture readings, a hose or flood test, and where useful thermal imaging to trace it. Only then do we choose the fix. Treating the stain instead of the source is the commonest and most expensive mistake. See damp treatment.

What is SATE and is it worth it?

SATE is external thermal insulation: insulation boards fixed to the outside of the façade and finished with a render. It removes thermal bridges, cuts heating and cooling across the whole building and protects the structure, and it is the work that energy-efficiency grants favour most. For a whole façade that is being renovated anyway, it is almost always the best use of the money. See façade restoration.

Is there support for insulation?

Often, particularly for the façade and roof of a residential building. Schemes change from year to year and are applied for by the community rather than by one owner. We check what is open when you ask and tell you honestly whether the building is likely to qualify.

How much does it cost to waterproof a roof?

Roughly 40 to 90 €/m² excluding VAT, depending on access and the system. Adding insulation above the membrane takes it to about 70 to 130 €/m². A 60 m² roof with waterproofing alone comes to around 2,400 to 5,400 €. Compared with the damage a leak does, it is cheap.

Can you insulate without building work inside?

Yes, from the outside, which is how it is usually done for a whole building. Internal insulation is possible too and costs floor area and some disruption. We recommend one or the other according to who owns what and what the building allows.

How is it paid for?

In stages tied to completed work, with a deposit on signing and a final payment at handover.

Free quote

Get a survey for your building.

Free survey and written diagnosis anywhere in Catalonia.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →