Finishes · Barcelona + Catalonia

Microcement in Barcelona and Catalonia

The seamless finish of the moment: floors, walls and bathrooms with no joints, in a warm contemporary look. And often without demolition, because it can be applied over what you already have.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Microcement

A continuous surface with a hand-made character.

Microcement is a thin, cement-based coating, applied by trowel in several layers and sealed, that gives a seamless surface on floors, walls, shower trays, worktops and furniture. There are no tile joints to collect dirt and the colour varies subtly, which is the hand-made look people want from it.

Its great practical advantage is that it can go on over the existing tiles or floor, provided that is sound and flat. That avoids demolition, rubble and a lot of cost, and it turns a bathroom or kitchen refit into a matter of days rather than weeks. The limit is the base: a poorly prepared base will crack through the finish, so preparation is where the job is won.

It is an applied craft rather than a product you buy, and the skill of the applicator decides the result. The sealing is as important as the application: a bathroom in microcement has to be sealed properly to be waterproof in the shower, and re-sealed over the years. For tiled alternatives and the waterproofing below any finish, see bathroom renovation and flooring.

Corner of a bathroom with small-format cream wall tiles, a decorative vertical band of brown flowers and unfinished skirting on a dark floor
How it runs

Applying microcement, step by step.

Three to seven days for a room, plus time for the layers to cure.

01

Survey

We check the existing base for soundness, flatness, movement and damp, and decide whether microcement can go straight on.

02

Preparation

Cleaning, repairing and priming. This is where most failures are decided.

03

Reinforcing mesh

A fibreglass mesh over joints and cracks, to stop them showing through.

04

Base coats

Two or three thin coats, sanded between each.

05

Colour coat

The finish layer, in the colour and texture agreed on a sample.

06

Sealing

Sealed with a protective coat, which makes it water- and stain-resistant.

07

Curing and handover

Cured before use, and an explanation of how to care for it.

How we work

How we run a microcement job.

01

Free survey and samples

We test the base and show you samples. No cost and no obligation.

02

Fixed quote

A price per square metre.

03

Application

Done by experienced applicators.

04

Handover and care

Warranty and a note on how to maintain it.

Why us

Why use us for microcement.

Preparation done properly

The failure point of most microcement jobs.

Experienced applicators

It is a craft, and the hand shows in the result.

Over existing surfaces

No demolition where the base is sound.

Sealed for wet areas

Showers and bathrooms sealed to last.

Samples first

You see the colour and texture before it goes on.

Honest about limits

We tell you when the base is not suitable.

Prices

What microcement costs.

Per square metre, VAT excluded.

What microcement costs — Indicative prices · VAT not included
SurfaceWhat it coversPer m² (excl. VAT)
WallsStandard finishes, practical solution60 – 100 €/m²
Complete bathroomsPremium materials and high-end interior design90 – 140 €/m²
Indicative prices · VAT not included. Microcement is priced per square metre, and the preparation of the base and the total area both affect the rate. The larger the area, the better the unit price. It is a hand-applied finish, so the applicator’s experience is the key. Everything is itemised.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate4,800 – 8,000 €Walls · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

By surface

What it costs by surface.

Indicative ranges, VAT excluded.

WallsLiving room, bathroom60 – 100 €/m²

A continuous wall finish with a contemporary look.

FloorsWhole home70 – 120 €/m²

A seamless floor, over the existing surface where it is sound.

Complete bathroomIncluding the shower90 – 140 €/m²

Floor, walls and even the shower tray, waterproof and seamless.

Worktops and furnitureDetailsAsk us

Worktops, furniture and details in microcement.

Microcement is not indestructible. It can mark under a dropped heavy object and a sealed surface wears over years. Re-sealing every few years in wet areas is part of owning it, and we say so before you choose it.

No small print

What is included and what is not.

The scope of a microcement job, and what is separate.

✓ Included in the price

  • Survey and base test
  • Preparation, repair and priming
  • Reinforcing mesh
  • Base coats with sanding
  • Colour coat
  • Sealing
  • A care guide
  • A written warranty

✕ Not included — quoted separately

  • Waterproofing membranes beneath a shower, unless itemised
  • Demolition of a base that is not sound
  • Underfloor heating, unless itemised
  • Council taxes and fees
  • Works needing the owners’ association’s consent
  • Moving furniture out of the rooms

VAT is shown as its own line — 10% or 21% depending on your case.

Where we work

Where we apply microcement.

Across Barcelona and Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners ask about microcement.

Can microcement go over existing tiles?

Yes, if the tiles are sound, flat and well stuck. The joints are filled and meshed so they do not show through, and the surface is primed. That saves demolition, rubble and days of work. If the tiles are loose or the base moves, they have to come up first, and we tell you at the survey.

Is it suitable for a bathroom and shower?

Yes, if it is applied and sealed properly and the waterproofing beneath is sound. A microcement shower is seamless and easy to keep clean, but the sealing has to be done well and renewed every few years. The shower tray area needs the most care.

Does it scratch or get damaged?

It is hard-wearing but not indestructible. A heavy object dropped on a floor can chip or mark it, and a sealed surface wears over years. Good sealing and sensible care keep it looking good, and small marks can be repaired locally.

How much does microcement cost?

Roughly 60 to 100 €/m² for walls, 70 to 120 €/m² for floors and 90 to 140 €/m² for a complete bathroom, excluding VAT.

How long does it take?

Three to seven days for a room, plus curing time before heavy use. Because it avoids demolition, a bathroom can be done in under a week.

Free quote

Get a quote for microcement.

Free survey, base test and samples anywhere in Catalonia.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →