Buildings · Catalonia

Building maintenance in Catalonia

A well-maintained building is worth more, lasts longer and avoids expensive surprises. We handle preventive maintenance and repairs, with a responsive service for residents’ associations and their administrators.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Building maintenance

The cheapest repair is the one you catch early.

Most expensive building problems started as cheap ones. A slipped roof tile becomes a leak; a blocked gutter becomes damp in the top-floor flats; a neglected riser becomes a flooded stairwell. Preventive maintenance exists to catch the cheap version.

There are two ways to buy it. One-off services: you call when something needs doing and pay for what you need. Or a maintenance contract: scheduled inspections of the key elements — roof, façade, common services, gutters — with agreed prices and a faster response when something goes wrong. A contract gives peace of mind and is usually better value for a building of any size.

We work with administrators every day, and the service is designed around what they need: one point of contact, clear quotes, and reports they can put in front of the owners. For larger works that grow out of maintenance, see works for residents’ associations, roof repairs and ITE.

Exterior paving of stone-effect stoneware between railings, with vegetation to one side
How it runs

Maintaining a building, step by step.

An initial inspection, then a schedule that matches the building.

01

Initial inspection

We examine the roof, façade, common services and gutters, and record their condition.

02

Priorities

A list of what needs doing now, what can wait and what to monitor.

03

Schedule

Routine inspections set for the key elements, at the right intervals.

04

Routine work

Gutters cleaned, minor repairs made, and small problems fixed before they grow.

05

Response

A fast route for faults when they occur.

06

Reporting

Reports to the administrator and the association.

How we work

How we run building maintenance.

01

Free inspection

We look at the building. No cost and no obligation.

02

Proposal

A one-off list or a contract, priced.

03

Routine work

Scheduled visits and minor repairs.

04

Reports

Plain-language reports for the association.

Why us

Why use us for maintenance.

One point of contact

One telephone for everything.

Prevention that pays

A cleaned gutter or an early repair avoids damage that costs many times more.

Built around administrators

Clear quotes and reports that can go straight to the owners.

Agreed prices

A contract fixes the rates for routine work.

Small jobs included

Not too small to be worth doing.

Bigger jobs when needed

If maintenance reveals something larger, we can quote and carry it out.

Prices

What maintenance costs.

Indicative figures, VAT excluded.

What maintenance costs — Indicative prices · VAT not included
ServiceWhat it coversIndicative cost
One-off servicesStandard finishes, practical solutionBy the job
Comprehensive contractPremium materials and high-end interior designDepends on building
Indicative prices · VAT not included. You can buy one-off services (pay for what you need) or a maintenance contract with scheduled inspections and agreed prices, which gives peace of mind and is usually better value. The cost depends on the size and the services covered.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Full renovation · functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

By service

What it costs by type of service.

Indicative figures, VAT excluded.

One-off serviceWhen neededBy the job

Specific repairs and work, without a contract.

Basic contractPreventiveFrom 60 €/month

Periodic inspection of the essentials and priority for repairs.

Comprehensive contractEverything coveredDepends on building

Complete preventive and corrective maintenance and availability, with reports.

Large buildingsAnd developmentsAsk us

Maintenance of large buildings or several buildings.

A contract is worth more in an older building, where the roof, gutters and risers are closer to the end of their life. We tell you honestly whether a contract suits yours, or whether one-off services would do.

No small print

What is included and what is not.

The scope of a maintenance service, and what is separate.

✓ Included in the price

  • Initial inspection and condition record
  • Periodic inspection of key elements
  • Gutter and outlet cleaning
  • Minor repairs
  • Prioritised response to faults
  • Reports to the administrator
  • Agreed prices for routine work

✕ Not included — quoted separately

  • Major repairs and renovation works, quoted separately
  • Lift, fire and gas maintenance, which have their own regulated contracts
  • Scaffolding or access equipment, where needed
  • Insurance claims handling
  • The administrator’s fees
  • Cleaning of the building

VAT is shown as its own line — 10% or 21% depending on the work.

Where we work

Where we maintain buildings.

Across Barcelona and Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What administrators and owners ask about maintenance.

What does a maintenance contract include?

Periodic inspection of the key elements — roof, façade, common services, gutters — a fast response to faults, reports to the community and agreed prices. We tailor it to what your building needs, from the basics to a comprehensive service.

Why is preventive maintenance worth it?

Because preventing is far cheaper than repairing. A leak caught early, a gutter cleared or a service checked avoids damage that costs many times more, and a well-maintained building keeps its value and gives its neighbours fewer problems.

Do you work with building administrators?

Yes, every day. We give administrators a responsive single contact, clear quotes and reports, so that managing the maintenance of their buildings is straightforward.

How much does a maintenance contract cost?

A basic contract starts at about 60 € a month, excluding VAT, and the cost rises with the size of the building and the services covered. One-off services are priced by the job.

Does it cover the lift and the fire systems?

No. Lifts, fire protection and gas have their own regulated maintenance regimes with approved companies. We cover the fabric of the building and its ordinary services.

Free quote

Get a building inspection.

Free inspection anywhere in Catalonia. A one-off list or a maintenance contract, priced.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →