Industrial · Catalonia

Industrial unit and warehouse renovations in Catalonia

An industrial unit is renovated for operations: a safe structure and roof, a proper industrial floor, powerful services, fire protection and often offices inside — everything needed to work and to pass the activity licence.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Industrial unit renovation

Built for what happens inside it.

A nave is judged by whether the operation runs well in it. That means a sound structure and a roof that does not leak, a floor that can take forklifts and racking, enough electrical power, fire protection that satisfies the regulations, and loading access that keeps goods moving. The cost per square metre of the open space is much lower than a home, and the cost of the services, the fire protection and the offices is not.

One issue comes up on a great many older units: fibre-cement roofing. Much of it contains asbestos. It is not dangerous while undisturbed and intact, but it cannot be cut, drilled or demolished by an ordinary builder: removal has to be done by an authorised company under an approved plan, with the waste properly handled. We separate it as its own line in the quote and use an authorised firm.

Many units also need offices, changing rooms and a canteen built inside, and those raise the average cost per square metre. We plan the activity licence alongside the works, because an industrial activity needs a project and an inspection before it can start. For a commercial unit that is not industrial, see commercial units; for the permit process, permits and drawings.

Industrial unit under construction, with a site arch, green pipes visible across the ceiling and wall, external windows and building materials on the floor
How it runs

Renovating an industrial unit, step by step.

Typically six to sixteen weeks, depending on size and on the roof. The activity licence runs in parallel.

01

Survey and structural check

We assess the structure, the roof (including whether it contains asbestos), the floor, the services and the fire protection.

02

Activity project and licence

A registered technician drafts the industrial activity project and we file it with the council.

03

Asbestos removal, if present

Removal by an authorised company under an approved plan, with the waste properly managed, before other work begins.

04

Roof and structure

Repair or replacement of the roof, with insulation, and any structural repair.

05

Floor and services

Industrial floor, electrics sized for the load, lighting, and water and drainage.

06

Fire protection

Fire protection to the standard the activity requires.

07

Offices, changing rooms and handover

Internal offices and staff areas, then certificates and handover.

How we work

How we run an industrial project.

01

Free survey

We visit and talk through the operation. No cost and no obligation.

02

Fixed quote, separate project

A fixed itemised quote, with asbestos removal and the activity project shown separately.

03

Build to a written date

One site manager coordinates every trade and the authorised asbestos contractor.

04

Handover with the paperwork

Certificates and the documents for the activity licence.

Why us

Why use us for an industrial unit.

Operations first

We design the building around how the operation runs, not around how it looks.

Asbestos handled lawfully

An authorised company, an approved plan and managed waste, priced as a separate line.

Power and services sized for the load

Electrical capacity and distribution that fit the equipment, with room to grow.

Fire protection to regulation

Designed in the activity project and built to it.

Offices and staff areas

Built inside the unit to a good standard without compromising the operation.

One site manager

Every trade coordinated by one person.

Prices

What an industrial unit renovation costs.

Per square metre of floor area, VAT excluded. Equipment and asbestos removal are separate.

What an industrial unit renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversPer m² (excl. VAT)
BasicStandard finishes, practical solution150 – 350 €/m²
High specification / officesPremium materials and high-end interior design600 – 1,000 €/m²
Indicative prices · VAT not included. The open floor costs far less per square metre than a home, but the services, fire protection, industrial floor and asbestos removal are significant items, and internal offices raise the average. Everything is itemised, with the activity project shown separately.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate12,000 – 28,000 €Basic · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of unit.

Indicative ranges, VAT and equipment excluded.

Small unitUp to 300 m²From 60,000 €

Workshops and small logistics. The floor, services and fire protection set the minimum.

Medium unit300 – 1,000 m²From 150,000 €

The most common size, with offices, changing rooms and a loading bay.

Large unitOver 1,000 m²Bespoke

Large logistics or production space, with larger installations.

Asbestos removalFibre-cement roofFrom 25 €/m²

Removal by an authorised company under an approved plan, with waste management. Quoted separately.

If the roof contains asbestos, do not let anyone disturb it before it is surveyed — no drilling, cutting, or high-pressure cleaning. The first step is a survey and an approved removal plan, and it comes before the rest of the programme.

No small print

What is included and what is not.

The scope of an industrial unit renovation, and what is separate.

✓ Included in the price

  • Survey and structural check
  • Roof repair or replacement with insulation
  • Industrial floor
  • Electrics and lighting, with certificate
  • Water and drainage
  • Fire protection
  • Internal offices and staff areas, where itemised
  • Loading bay works, where itemised
  • Final certificates and a written warranty

✕ Not included — quoted separately

  • Asbestos removal, priced separately and done by an authorised company
  • Activity project, supervision and licence fees
  • Production equipment, racking and machinery
  • Council taxes and fees
  • Landlord’s works and approvals
  • Environmental permits for the operation itself

VAT is shown as its own line — normally 21% on works for a business.

Where we work

Where we renovate industrial units.

Industrial units in Barcelona and across Catalonia. Find your area.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners and tenants of industrial units ask.

My unit has a fibre-cement roof. What does that mean?

It very probably contains asbestos, if it was installed before the material was banned. Intact and left alone it is not an immediate hazard, but it cannot be cut, drilled, walked on carelessly or pressure-washed, and removal must be done by an authorised company working to an approved plan with the waste handled lawfully. We survey it, quote the removal as its own line and coordinate the authorised contractor, so the rest of the work is not held up.

Can you build offices inside the unit?

Yes. Internal offices, meeting rooms, changing rooms and a canteen, built as a lightweight structure inside the shell, with their own air conditioning and services, and fire separation where the regulations require it. They raise the average cost per square metre, because offices cost several times what an open floor does.

What do I need for an industrial activity licence?

An activity project drafted by a registered technician and a building that matches it, plus an inspection. Industrial activities are subject to stricter requirements than commercial ones, covering fire protection, ventilation, noise and sometimes environmental permits, and the details depend on what you do there. We coordinate the technician and build to the project.

How much does an industrial unit renovation cost?

Roughly 150 to 350 €/m² for a basic renovation, 350 to 600 €/m² for mid-range, and 600 to 1,000 €/m² where there are significant offices or a high specification, excluding VAT and equipment. A 500 m² unit at mid-range comes to around 175,000 to 300,000 € for the works.

How long does it take?

Six to sixteen weeks of building depending on size and on the roof, with the activity licence in parallel. If there is asbestos, its removal comes first and has to be planned in.

How is it paid for?

In stages tied to completed work: a deposit on signing, payments at the end of each phase, and a final payment at handover. Never the full amount in advance.

Free quote

Get a quote for your unit.

Free survey anywhere in Catalonia, including a roof survey. Asbestos removal quoted separately.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →