Renovating communal areas is as much management as building work: façade, entrance, staircase, roof or lift, with clear quotes for the owners’ meeting, programmes that are kept, and help with rehabilitation grants.
In Spain, the parts of a residential block that everybody shares — the façade, the roof, the staircase, the entrance, the lift — belong to the comunidad de propietarios, the owners’ association. Decisions about them are taken by vote at the owners’ meeting (the junta), paid for by every owner in proportion to their share, and carried out by whichever contractor the meeting appoints. That makes this a different kind of job from renovating a flat.
It is also a different kind of selling. The people you have to convince are a dozen or a hundred neighbours with different budgets and priorities, many of whom will not read a technical report. So the thing that matters most is a clear, itemised and comparable quote that the administrator can put in front of the meeting, a programme the residents can plan around, and an honest account of what is mandatory and what is a choice.
The financing angle matters too. Many communal works, especially energy efficiency and accessibility, are eligible for grants that can reduce each owner’s share substantially. We prepare the quote and the documentation with the grant in mind, and tell you honestly whether the building is likely to qualify. For the biggest single job most buildings face, see façade restoration; for the paperwork, permits and drawings.

The decision takes longer than the building. The meeting has to vote, and the grants have to be applied for.
We inspect the building and give the administrator a clear written report of what needs doing, what is urgent and what is optional.
A fixed itemised quote, with alternatives priced side by side, so owners can compare and vote on facts.
We identify the grants available and prepare the documentation. The owners’ meeting votes.
Whatever the council requires, filed by us.
The work begins, with a written programme and regular notices to residents about access and disruption.
The work is certified by stage and paid for against it.
Final certificate, final account, and warranty handed to the administrator.
We inspect and report to the administrator. No cost and no obligation.
Itemised and comparable, with the available grants identified.
One person runs the job and keeps the administrator and residents informed.
A completion certificate, a transparent final account and a warranty.
Itemised, with alternatives side by side, so a meeting can decide without needing a technical background.
We distinguish what an inspection requires from what the building would merely benefit from.
We identify the grants available and prepare the documents, which can reduce the levy for every owner.
Written notices and a named contact, so neighbours know what is happening and when.
Payment against certified progress, never large advances.
Every trade coordinated by one person.
Indicative ranges for the whole building, VAT excluded. The levy per owner depends on the building’s share structure.
| Works | What it covers | Indicative range (€) | |
|---|---|---|---|
| Entrance and staircase | Standard finishes, practical solution | 8,000 – 40,000 € | |
| Façade restoration | Selected materials, best balance | 30,000 – 150,000 € | |
| Lift installation | Premium materials and high-end interior design | 40,000 – 90,000 € |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT excluded.
Buildings of a few storeys. Entrance, staircase and small façade works.
The most common case: façade, roof or accessibility.
Large rehabilitations of façade, roof and several services.
We check which grants apply, which can reduce each owner’s levy significantly.
What owners care about is not the total but their share and when it falls due. We structure the programme and the stage payments so the administrator can set a payment schedule that matches, and so no owner is asked for a large sum before work has been done.
The scope of communal works, and what is separate.
VAT can be at the reduced rate on rehabilitation and energy-efficiency works in a residential building, and we confirm which applies in the quote. Grants, where granted, reduce each owner’s share.
Communal works draw on façade, roof, lift and entrance work, coordinated as one job.
Residential buildings in Barcelona and across Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What administrators and owners ask.
Often, particularly for energy-efficiency works such as façade insulation and for accessibility such as installing a lift. The schemes change from year to year, are applied for by the community rather than the individual owner, and have eligibility conditions. We check what is open when you ask, tell you honestly whether the building is likely to qualify, and prepare the documentation. We will not budget on a grant that is not available.
Yes — it is the most useful thing we do. The quote is itemised and, where there are options, compares them side by side with the cost and the benefit of each, so the meeting can decide on facts. We will also attend to answer questions if the administrator wants us to.
The deficiencies an ITE report lists have to be put right within the period it sets. We survey, confirm the diagnosis, quote the repairs, and carry them out with technical direction, leaving the building compliant and with a completion certificate. See façade restoration for the most common case.
By stage certification against a written programme, agreed with the administrator. Owners usually pay their share as a levy (a derrama) on a schedule set at the meeting, which can be spread across the duration of the work. We do not ask for disproportionate advances.
Often, though it is a larger job than people expect. It needs space — a shaft, an external structure or a stairwell core — the consent of the owners, a technical project, a licence, and in most cases a grant to be affordable. We survey the building and tell you honestly whether it is feasible and what it would cost. See lift installation.
Some, and we plan to keep it small. We agree access with the administrator, give residents written notice of what is happening and when, protect entrances and shared areas, and keep noisy tasks to working hours. Anything affecting an individual flat is arranged with that owner directly.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey and written report anywhere in Catalonia. A quote the owners’ meeting can vote on.