A warm home without spending more than you need to. We install and renew heating — radiators, underfloor heating, boilers and heat pumps — sized for your home, with support available for efficiency.
Winters in Catalonia are short but cold indoors, because many homes have little insulation and heating that was an afterthought. A heating system is judged by whether the home is comfortable and what it costs to run, and both depend on how well the system is matched to the building rather than on the brand of the boiler.
There are four common answers. Radiators with a condensing gas boiler are the classic and the cheapest to install. Underfloor heating gives an even, gentle warmth and works best when a floor is being relaid anyway. An air-source heat pump (aerotermia) does heating, cooling and hot water efficiently and is increasingly the choice in new and renovated homes. And electric radiators need no plumbing and suit small, well-insulated flats.
Whatever you choose, the sizing matters. An oversized system wastes money and an undersized one disappoints. We calculate the heat loss of the home before we recommend anything. See air conditioning and heat pumps and energy efficiency.

A few days for radiators; one to three weeks for underfloor heating or a heat pump, depending on the floor work.
We measure the home, assess the insulation and calculate the heating load.
Radiators, underfloor heating, heat pump or electric, matched to your home and budget.
Pipework, and the floor preparation for underfloor heating.
The boiler, heat pump or radiators installed and connected.
Thermostats and zoning.
The system balanced and tested.
Certificates, a demonstration and warranty.
We visit, measure and calculate. No cost and no obligation.
The systems that suit your home, priced side by side with running costs.
One site manager coordinates the plumber, the electrician and the floor trades.
Tested, certified and guaranteed.
Not by rule of thumb.
We show the cheap option and the efficient option, with the running cost of each.
Done properly when the floor is being laid anyway.
A heat pump is only as good as the insulation and the emitters it feeds.
Gas and electrical work by authorised installers with certificates.
Efficiency support where it exists.
Indicative ranges for a typical flat or house, VAT excluded.
| System | What it covers | Indicative range | |
|---|---|---|---|
| Radiators + boiler | Standard finishes, practical solution | 3,500 – 7,000 € | |
| Underfloor heating | Selected materials, best balance | 60 – 100 €/m² | |
| Heat pump | Premium materials and high-end interior design | 9,000 – 20,000 € |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT excluded.
The classic and economical option, with a condensing boiler.
The most pleasant and even warmth, ideal when changing the floor.
Efficient heating, cooling and hot water.
Low-consumption electric radiators, without water installation.
Whether a heat pump is the right choice depends on insulation first. In a poorly insulated home it works harder and the running cost disappoints. We say so honestly and show you the cost of the insulation that makes it worthwhile.
The scope of a heating installation, and what is separate.
VAT is shown as its own line, and efficiency installations may attract a reduced rate. We tell you what applies.
Heating connects insulation, plumbing, gas and electrics.
Across Barcelona and Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners ask about heating.
It depends on the home and the budget. Radiators with a boiler are cheapest to install. Underfloor heating is the most comfortable and best when the floor is coming up anyway. A heat pump is the most efficient and also cools, but depends on good insulation. We show the three side by side with the cost of each and the running cost.
Yes, evenly and gently, and it works well with a heat pump because it runs at low temperature. It reacts slowly, so it suits homes used most of the day better than ones heated for an hour in the evening. It needs floor build-up height, which matters in a renovation.
Often, especially if the boiler is near the end of its life and you are renovating anyway. A heat pump heats, cools and provides hot water at a lower running cost than gas, and avoids burning fuel indoors. It depends on insulation and the emitters. We tell you honestly if your home is a good candidate.
Roughly 3,500 to 7,000 € for radiators with a boiler, 60 to 100 €/m² for underfloor heating, and 9,000 to 20,000 € for a heat pump, excluding VAT.
Yes. Electric radiators need no plumbing and no breaking into walls, and suit small flats. For hydraulic systems, surface-mounted pipework is possible but less neat. We show the options.
In stages tied to completed work, with a deposit on signing and a final payment at commissioning.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey and heat-loss calculation anywhere in Catalonia.