Renovations · Osona

Full home renovations in Osona: Vic’s historic centre, stone masías and Ter houses

We renovate in Vic and across the Plana: Manlleu, Torelló, Centelles, Tona. We know Vic’s medieval historic centre, the stone masías and the cold inland climate, which calls for insulation and heating done properly. A fixed written quote and one site manager from start to finish.

Since 2010Free technical visitItemised quoteWarranty on the work

Fixed written quote
Vic
Osona
Fixeda written, itemised quote
1 site managera single point of contact for the whole renovation
Freetechnical visit in Osona
Warrantyon the work
Renovations in Osona

Renovating in Osona,
with no surprises.

Osona is masía country and home to a Vic with one of the best-preserved medieval centres in Catalonia — an arcaded Plaça Major, Gothic and Baroque streets, heavily protected. The industry of the Ter left colonies and flats in Manlleu and Torelló, and the climate of the Plana, with frosts and fog (boira), makes insulation and heating central to any renovation. We know that housing stock and its regulations, with a fixed quote and a single site manager.

  • Fixed quote before we start
  • A dedicated site manager on your renovation
  • Completion date in writing
  • Full handling of licences and permits
Corner of a home at work in progress with a lime green wall and a grey wall already painted, and three small square openings in the upper part
Who it is for

Full renovations built around you.

These are the people we mostly work with in Osona. If you recognise yourself in one of them, we are a good fit:

Owners buying an older home

You have just bought — or are about to — an older building or house and want to make it yours, with new services and no surprises.

Families who want to re-plan their home

You need more light, one more bedroom or an open kitchen: we reorganise the layout so the house fits the way you live.

Investors looking to add value

You buy to renovate and sell or to let: we balance cost and finishes to get the most value out of the property.

Second-home owners

You are preparing a holiday home or a rental: a durable, low-maintenance renovation, with the habitability certificate and the energy certificate in order.

By type of building

Every building in Osona calls for a different renovation.

Restoring in the centre of Vic and renovating an isolated masía are very different jobs. We fit the renovation to your type of home.

01

Vic’s historic centre

Medieval, Gothic and Baroque buildings of the protected old centre: careful restoration of structure, façade and listed features, with heritage paperwork.

02

Stone masías

Farmhouses across the Plana: reinforcement of walls and beams, serious thermal insulation and heating (biomass, aerothermal) for the inland cold.

03

Colonies and flats on the Ter

Manlleu, Torelló, Roda de Ter: industrial and post-war housing where we renew services, layout and energy efficiency.

04

Inland village houses

Centelles, Tona, Taradell: houses between party walls with old structure and damp, very much about gaining comfort and savings on heating.

How we work

How we work with you.

01

A survey wherever you are

We come to your home, measure up and check the real state of the services and the structure. Free and with no obligation.

02

Design and a fixed quote

A fixed quote, broken down item by item and in writing, with the finishes defined. No “from” prices that balloon later.

03

Council paperwork

We prepare the works notification or licence and, where needed, coordinate with the community and the building administrator.

04

Works under a site manager, with a warranty

One site manager coordinates the trades and sends you regular photos and video. Handover with the certificates, the habitability certificate and the warranty.

Why Tu Nuevo Piso

Why renovate with us in Osona.

We know the housing stock here

From the stone masía to the flat of the 1970s: we know what each type of building in Osona hides and what has to be renewed whatever happens.

Planning rules and the council

We file works notifications and licences with the relevant council, and coordinate with the community when common elements or the façade are touched.

A dedicated site manager

A single contact for the whole renovation, with regular photos and video of progress. No chasing five trades.

Fixed quote

A fixed price broken down item by item after the survey. What we sign is what you pay, with no last-minute extras.

Trusted trades in the area

Bricklayers, plumbers, electricians and joiners we already know, under one contract and one programme.

Warranty and technical support

A written warranty on the work, with a registered technical architect when the project needs one.

Prices

What it costs to renovate in Osona.

Indicative ranges in Osona, based on real quotes. The final price is always a fixed quote after the visit.

An 80 m² flat41,300 – 52,100 €3 bedrooms, a bathroom, a WC and a kitchen · 520–650 €/m² · VAT not included
A 120 m² house70,100 – 88,600 €4 bedrooms, 2 bathrooms and a kitchen · 580–740 €/m² · VAT not included
What it costs to renovate in Osona — Indicative prices · VAT not included
Quality levelWhat it coversPrice per m²
Basic / functionalStandard finishes, layout unchanged520 – 650 €/m²
High-end / luxuryPremium materials and exclusive interior design1,060 – 1,340 €/m²
Indicative prices · VAT not included. Not a binding offer: the definitive quote, fixed and broken down item by item, is always given after the free technical visit.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Basic / functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

What changes the price of a renovation in Osona

Restoring a stone masía does not cost the same as renovating a flat in Manlleu. Beyond the €/m², these are the factors that move the price most:

Condition of the services

Old plumbing, wiring and drains usually have to be renewed completely; if they are in good condition, a large part of the work is saved.

Age of the building

In older buildings and houses there are surprises — timber floors, damp, obsolete services or even asbestos — that have to be dealt with.

Changes to the layout

Taking down partitions, moving the kitchen or bathroom or opening up spaces means plumbing, electrics and sometimes structure, and pushes the budget up.

Quality of the materials

The same home can cost half or double depending on the finishes: standard stoneware against large-format porcelain, joinery, sanitaryware and kitchen.

Permits needed

A works notification is cheap; a major works licence needs a project, technical supervision and fees that add to the budget.

Access to the site

Houses with no lift, old town centres with narrow streets, isolated masías or upper floors make carrying, unloading materials and removing rubble dearer.

Councils and regulations

Licences and paperwork, sorted.

In Vic’s historic centre the work is heavily regulated and protected; for masías the rules on non-developable land count. We handle the paperwork for you.

Works notification (minor works)

For renovations that touch neither the structure nor the layout. It is filed with the council and lets you start almost at once. We handle it for you.

Major works licence

If the structure, the façade or the layout is significantly affected. It needs a technical project and site supervision; in listed buildings, a heritage review.

Building inspection (ITE)

The technical inspection is compulsory once a building reaches a certain age. If yours is pending or has deficiencies, we help with the inspection and the repair work.

Habitability and energy certificates

Needed to sell or let. We handle the habitability certificate and the energy-efficiency certificate, before and after the renovation.

Reduced 10% VAT

On homes completed at least two years before the works start, as long as the materials supplied do not exceed 40% of the taxable base. We show it clearly in the quote.

Owners’ community

When common elements — downpipes, façade, courtyards, roof — are touched, we coordinate with the community and its administrator.

Grants

Grants for renovating in Osona.

If your renovation improves energy efficiency, you can recover part of the investment. We help you apply.

Next Generation funds

Grants for energy retrofits (insulation, windows, aerothermal heating), managed in Catalonia by ICAEN. We prepare the certificate and the application.

Agència de l’Habitatge de Catalunya

The Generalitat and the county councils publish calls for the renovation of homes and buildings. We assemble the technical documentation needed.

Income-tax deduction

For works that reduce the energy demand or consumption of the home. They apply according to the call and with the right documentation; we guide you.

What we renovate

Everything we renovate in Osona.

From the full renovation to a single trade. These are our most requested services.

See all services →
Where we work

Osona municipalities where we renovate.

We work across the whole comarca, with crews who know everything from Vic’s medieval centre to the most isolated masía.

We renovate mainly in:

Vic

Protected medieval historic centre, Eixample and neighbourhoods: careful restoration and full renovation.

See renovations in Vic →

Manlleu and Torelló

Industrial and post-war housing on the Ter, where we renew services and efficiency.

Osona masías

Stone houses of the Plana: structure, insulation and heating for the inland climate.

Centelles and Tona

Residential village houses, well connected, looking for comfort and savings on heating.

And also in:

ManlleuTorellóCentellesTonaTaradellRoda de TerSant Hipòlit de VoltregàPrats de LluçanèsSant Quirze de BesoraL'Esquirol
Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

Everything you need to know about renovating in Osona: prices, licences, timescales and grants.

How much does it cost to hire a renovation company in Osona?

As a guide, a full renovation runs between 520 and 1,340 €/m²: 520–650 €/m² at functional standard, 750–940 €/m² at mid-range and 1,060–1,340 €/m² at high-end, VAT extra. These figures come from our own quotes, not market estimates. A flat of 80–100 m² usually lands between 30,000 and 60,000 €; restoring a stone masía goes well above that. We give you a fixed, itemised quote after the free technical visit, with no “from” prices.

How much does it cost to renovate a bathroom or a kitchen in Osona?

As a reference, a complete bathroom usually runs from 9,500 to 19,800 € and a kitchen with units and appliances from 4,800 to 19,500 €, depending on floor area, finishes and the state of the services. The final price is fixed and in writing once we have seen the home.

What does your fixed quote include?

Everything, item by item: the labour of every trade, materials, waste management, protection of communal areas, the site manager’s coordination and the final clean. If your renovation needs a project or a licence, we itemise that too. What you sign is what you pay.

How do you avoid cost overruns?

With a detailed technical visit and a quote fixed item by item before starting, so no surprise “extras” appear. If you decide on a change during the works, we give you its cost in writing and it is only carried out when you approve it.

How long does a full renovation take?

A full renovation of an average home (70–100 m²) usually lasts between 10 and 16 weeks. Made-to-measure furniture and major works licences can add weeks. We give you a written programme before starting and keep you updated on how the work is going.

Do you work with architects and handle the licences?

Yes. We have registered architects and technical architects for the project and the site supervision when it is needed, and we file the works notification or licence with the relevant council, as well as the habitability certificate and the energy certificate.

Do you offer a warranty?

Yes. We give a written warranty on the work, and we stand behind what we do after we have finished too.

Are there grants or subsidies for renovating in Osona?

Yes. If the renovation improves energy efficiency (windows, insulation, aerothermal heating) it can qualify for Next Generation funds managed in Catalonia by ICAEN and for income-tax deductions. The Generalitat and the county council also publish calls for renovation. We help with the paperwork.

It gets very cold on the Plana: how do you improve insulation and heating?

It is a priority in Osona. We work on façade and roof insulation, high-performance windows and efficient systems (aerothermal, biomass, underfloor heating) to gain comfort and cut the bill, which is key with the frosts and the boira.

Can you restore a stone masía?

Yes. We reinforce walls and beams, sort out damp, insulate and renew services respecting the character of the masía, and handle the permits on non-developable land.

Can you renovate in Vic’s historic centre?

Yes, with due care. Vic’s old centre is protected: we coordinate the work on structure, façade and listed features and apply for the heritage authorisation at the Ajuntament.

Free quote

Ask for your quote, no strings attached.

A free technical visit in Osona and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →