Hospitality · Barcelona + Catalonia

Restaurant renovations in Catalonia

A restaurant is one of the most technical renovations there is: a commercial kitchen, fume extraction, fire protection, soundproofing and hygiene rules, plus a dining room people want to come back to. We build it to the regulations, and for the way it will actually run.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Restaurant renovation

The kitchen and the extraction decide everything.

Customers see the dining room. The business lives or dies on what they do not see: the commercial kitchen, the extraction, the fire protection, the grease trap, the soundproofing to your neighbours and the layout that lets staff work without colliding. Get those right and the dining room can be modest. Get them wrong and no dining room will save the place.

The first question for any unit is fume extraction. A restaurant needs a way of getting cooking fumes up to the roof, and in an existing building that can be the hardest and most expensive single item — sometimes a duct has to run up the face of the building, which needs the residents’ association’s consent. A unit that has been a restaurant before usually has the route; a shell or a former shop often does not. Check before you sign a lease.

The second is noise. A restaurant below flats generates complaints at every stage: the extraction fan, the kitchen, the music, the people leaving. Acoustic insulation to ceilings and party walls and a quiet extraction system are not extras, they are what keeps the licence. We design the layout around the kitchen workflow, not just the look, and build to the activity project. For a smaller venue see bars or cafés; for the general fit-out process, commercial units.

Restaurant corridor under construction with an arch, a carved relief panel, gold lamps wrapped in plastic and walls not yet painted
How it runs

Renovating a restaurant, step by step.

Eight to twenty weeks of building, depending on size, and a licence process that runs alongside and often determines the opening date.

01

Survey and feasibility

Before you sign a lease: can the unit take an extraction route, does it have the electrical and gas capacity, and are the neighbours a noise problem? We tell you honestly.

02

Activity project and licence

A registered technician drafts the activity project for the restaurant licence and we file it. This runs in parallel with the design.

03

Strip-out and structure

Previous fit-out out, services located, and any structural work for extraction or openings done.

04

Extraction, fire protection and services

Fume extraction to the roof, fire protection, electrics with certificate, gas, plumbing and a grease trap.

05

Soundproofing

Acoustic insulation to ceilings and party walls, plus quiet extraction, to protect the licence.

06

Kitchen and dining room

The kitchen laid out around workflow, and a dining room with the finishes, lighting and furniture of your concept.

07

Inspection and handover

Final certificates, technician’s sign-off and handover on the agreed date.

How we work

How we run a restaurant project.

01

Pre-lease survey

We visit the unit before you commit and tell you what it needs. Free, and often the most valuable thing we do.

02

Fixed quote, separate project

A fixed itemised quote, with the activity project and the kitchen equipment shown separately.

03

Build to a written date

One site manager coordinates every trade against a written programme.

04

Handover with the paperwork

Certificates and the documents you need to open lawfully.

Why us

Why use us for your restaurant.

Extraction checked before you sign

The question that can sink a restaurant, answered while you can still walk away from the lease.

Kitchen laid out for workflow

Prep, cooking, plating and washing arranged so staff do not collide at service.

Soundproofed to keep the licence

Acoustic work designed in, not added after the first neighbour complaint.

Fire protection and hygiene to regulation

Built to the activity project and signed off by registered technicians.

One site manager

Every trade, including the specialist kitchen and extraction contractors, coordinated by one person.

Honest about timing

We tell you when the licence, not the building, is likely to be the constraint.

Prices

What a restaurant renovation costs.

Per square metre of floor area, VAT excluded. Kitchen equipment is separate.

What a restaurant renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversPer m² (excl. VAT)
Basic fit-outStandard finishes, practical solution700 – 1,100 €/m²
Designer / high-endPremium materials and high-end interior design1,600 – 2,500 €/m²
Indicative prices · VAT not included. Hospitality is among the most expensive fit-outs per square metre because of the commercial kitchen, fume extraction and fire protection. A unit that was already a restaurant starts ahead; a shell or a former shop costs more. Kitchen equipment is normally separate. Everything is itemised.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate56,000 – 88,000 €Basic fit-out · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of restaurant.

Indicative ranges for the building works, VAT and equipment excluded.

Small venueUp to 80 m²55,000 – 130,000 €

Tapas bars and small restaurants. Extraction and accessible toilets set the minimum.

Medium restaurant80 – 200 m²110,000 – 300,000 €

The most common size, with a full kitchen, a dining room and a bar.

Large restaurantOver 200 m²From 260,000 €

Large dining rooms, production kitchens and major air conditioning.

Activity projectTechnical procedureFrom 2,000 €

The project and supervision for the restaurant licence, quoted separately.

Three things sit outside these figures and belong in your plan: the kitchen equipment (which can be a large sum in its own right), the licence fees, and your opening stock and staffing. Kitchen equipment is normally supplied separately, and we can advise on realistic budgets for it.

No small print

What is included and what is not.

The scope of a turnkey restaurant fit-out, and what is separate.

✓ Included in the price

  • Survey and feasibility assessment
  • Strip-out and clearance
  • Fume extraction to the roof
  • Fire protection
  • Electrics, gas and plumbing, with certificates
  • Grease trap and drainage
  • Acoustic insulation to ceilings and party walls
  • Air conditioning and ventilation
  • Accessible toilets
  • Kitchen layout, finishes and dining room fit-out
  • Final certificates and a written warranty

✕ Not included — quoted separately

  • Commercial kitchen equipment, unless itemised
  • Activity project, supervision and licence fees, quoted separately
  • Furniture, crockery and decoration
  • Council taxes and fees
  • Residents’ association consent for external ducting, which you or your landlord obtain
  • Landlord’s works and approvals

VAT is shown as its own line — normally 21% on works for a business.

Where we work

Where we renovate restaurants.

Restaurants in Barcelona and across Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What restaurateurs ask before taking a unit.

Does my unit have a route for fume extraction?

That is the first thing to find out, ideally before you sign the lease. A restaurant needs to extract cooking fumes to the roof. A unit that has been a restaurant before usually has a flue; a shell or a former shop often does not, and creating one may mean running a duct up the façade, which needs the consent of the residents’ association and can be refused. We check at the survey and tell you honestly if the answer is a problem.

How do I avoid noise problems with the neighbours?

By designing it in. That means acoustic insulation to the ceiling and party walls, a quiet extraction system with vibration isolation, careful placement of the kitchen and the music, and keeping the activity within its licence. Noise complaints are the most common reason a restaurant is fined or closed, so it is not the place to economise. See bars, where the same issue is sharper.

How much does a restaurant renovation cost?

Roughly 700 to 1,100 €/m² for a basic fit-out, 1,100 to 1,600 €/m² for mid-range and 1,600 to 2,500 €/m² for designer, excluding VAT and kitchen equipment. A 150 m² restaurant at mid-range comes to around 165,000 to 240,000 € for the works. A unit that was already a restaurant is at the lower end; a shell is at the upper.

Do you supply the kitchen equipment?

Kitchen equipment is normally supplied separately. We prepare the kitchen — extraction, gas, power, water, drainage, floors and walls — to the equipment’s specification, and we coordinate the installation of what you buy.

How long does it take?

The building works run from eight to twenty weeks depending on size, with the activity licence in parallel. What usually sets the opening date is the licence rather than the building, and we plan accordingly and tell you when that is the case.

How is it paid for?

In stages tied to completed work: a deposit on signing, payments at the end of each phase, and a final payment at handover. Never the full amount in advance. The activity project and licence fees are invoiced separately.

Can you check a unit before I sign the lease?

Yes — and for a restaurant it is the best money you will not spend. The extraction route, the electrical and gas capacity, the neighbours and the unit’s previous use decide whether the project is viable, and they are all invisible in a listing. Ask for a survey.

Free quote

Get a survey of your unit.

Free survey, including before you sign the lease. Extraction and noise assessed first.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →