Renovations · Rubí

Full home renovations in Rubí: old centre, blocks and houses on residential estates

We renovate in the Centre, Ca n’Oriol and the surrounding residential estates. From the block flat to the house with a garden. A fixed written quote and one site manager from start to finish.

Since 2010Free technical visitItemised quoteWarranty on the work

Fixed written quote
Rubí
Rubí
Fixeda written, itemised quote
1 site managera single point of contact for the whole renovation
Freetechnical visit in Rubí
Warrantyon the work
Renovations in Rubí

Renovating in Rubí,
with no surprises.

Rubí combines an old centre and a fabric of blocks from the expansion with numerous residential estates of detached houses around it. The block flat calls for renewed services; the estate house, interior design and outdoor space. The city also lives alongside its riera, the seasonal stream. We know that housing stock, with a fixed quote and a single site manager.

  • Fixed quote before we start
  • A dedicated site manager on your renovation
  • Completion date in writing
  • Full handling of licences and permits
Old block parquet lifted next to a door during the works
Who it is for

Full renovations built around you.

These are the people we mostly work with in Rubí. If you recognise yourself in one of them, we are a good fit:

Owners buying an older home

You have just bought — or are about to — an older building or house and want to make it yours, with new services and no surprises.

Families who want to re-plan their home

You need more light, one more bedroom or an open kitchen: we reorganise the layout so the house fits the way you live.

Investors looking to add value

You buy to renovate and sell or to let: we balance cost and finishes to get the most value out of the property.

Second-home owners

You are preparing a holiday home or a rental: a durable, low-maintenance renovation, with the habitability certificate and the energy certificate in order.

By type of building

Every building in Rubí calls for a different renovation.

Every type of home asks for a different renovation. We fit the job to what your building really needs, not to a generic script.

01

Blocks and flats in the old centre

Centre and consolidated neighbourhoods: services to renew, damp and a layout to optimise.

02

Estate houses

Detached homes with a garden in the surroundings: full renovation with interior design, climate control and outdoor space.

03

Buildings and houses between party walls

The old core with houses of old structure that we restore inside.

04

Flats to let or sell

A quick, profitable renovation of kitchen, bathroom and efficiency, with the certificates up to date.

How we work

How we work with you.

01

A survey wherever you are

We come to your home, measure up and check the real state of the services and the structure. Free and with no obligation.

02

Design and a fixed quote

A fixed quote, broken down item by item and in writing, with the finishes defined. No “from” prices that balloon later.

03

Council paperwork

We prepare the works notification or licence and, where needed, coordinate with the community and the building administrator.

04

Works under a site manager, with a warranty

One site manager coordinates the trades and sends you regular photos and video. Handover with the certificates, the habitability certificate and the warranty.

Why Tu Nuevo Piso

Why renovate with us in Rubí.

We know the housing stock here

From the stone masía to the flat of the 1970s: we know what each type of building in Rubí hides and what has to be renewed whatever happens.

Planning rules and the council

We file works notifications and licences with the relevant council, and coordinate with the community when common elements or the façade are touched.

A dedicated site manager

A single contact for the whole renovation, with regular photos and video of progress. No chasing five trades.

Fixed quote

A fixed price broken down item by item after the survey. What we sign is what you pay, with no last-minute extras.

Trusted trades in the area

Bricklayers, plumbers, electricians and joiners we already know, under one contract and one programme.

Warranty and technical support

A written warranty on the work, with a registered technical architect when the project needs one.

Projects

Renovations completed in Rubí.

A selection of renovations in Rubí. Each project with its type, location and the work carried out.

Prices

What it costs to renovate in Rubí.

Indicative ranges in Rubí, based on real quotes. The final price is always a fixed quote after the visit.

An 80 m² flat41,300 – 52,100 €3 bedrooms, a bathroom, a WC and a kitchen · 520–650 €/m² · VAT not included
A 120 m² house70,100 – 88,600 €4 bedrooms, 2 bathrooms and a kitchen · 580–740 €/m² · VAT not included
What it costs to renovate in Rubí — Indicative prices · VAT not included
Quality levelWhat it coversPrice per m²
Basic / functionalStandard finishes, layout unchanged520 – 650 €/m²
High-end / luxuryPremium materials and exclusive interior design1,060 – 1,340 €/m²
Indicative prices · VAT not included. Not a binding offer: the definitive quote, fixed and broken down item by item, is always given after the free technical visit.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Basic / functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

What changes the price of a renovation in Rubí

Two homes of the same size can cost very different amounts. Beyond the €/m², these are the factors that move the price most:

Condition of the services

Old plumbing, wiring and drains usually have to be renewed completely; if they are in good condition, a large part of the work is saved.

Age of the building

In older buildings and houses there are surprises — timber floors, damp, obsolete services or even asbestos — that have to be dealt with.

Changes to the layout

Taking down partitions, moving the kitchen or bathroom or opening up spaces means plumbing, electrics and sometimes structure, and pushes the budget up.

Quality of the materials

The same home can cost half or double depending on the finishes: standard stoneware against large-format porcelain, joinery, sanitaryware and kitchen.

Permits needed

A works notification is cheap; a major works licence needs a project, technical supervision and fees that add to the budget.

Access to the site

Houses with no lift, old town centres with narrow streets, isolated masías or upper floors make carrying, unloading materials and removing rubble dearer.

Councils and regulations

Licences and paperwork, sorted.

Every job has its own procedure: minor works notification, major licence, building inspection, habitability certificate… We deal with it all with the relevant council.

Works notification (minor works)

For renovations that touch neither the structure nor the layout. It is filed with the council and lets you start almost at once. We handle it for you.

Major works licence

If the structure, the façade or the layout is significantly affected. It needs a technical project and site supervision; in listed buildings, a heritage review.

Building inspection (ITE)

The technical inspection is compulsory once a building reaches a certain age. If yours is pending or has deficiencies, we help with the inspection and the repair work.

Habitability and energy certificates

Needed to sell or let. We handle the habitability certificate and the energy-efficiency certificate, before and after the renovation.

Reduced 10% VAT

On homes completed at least two years before the works start, as long as the materials supplied do not exceed 40% of the taxable base. We show it clearly in the quote.

Owners’ community

When common elements — downpipes, façade, courtyards, roof — are touched, we coordinate with the community and its administrator.

Grants

Grants for renovating in Rubí.

If your renovation improves energy efficiency, you can recover part of the investment. We help you apply.

Next Generation funds

Grants for energy retrofits (insulation, windows, aerothermal heating), managed in Catalonia by ICAEN. We prepare the certificate and the application.

Agència de l’Habitatge de Catalunya

The Generalitat and the county councils publish calls for the renovation of homes and buildings. We assemble the technical documentation needed.

Income-tax deduction

For works that reduce the energy demand or consumption of the home. They apply according to the call and with the right documentation; we guide you.

What we renovate

Everything we renovate in Rubí.

From the full renovation to a single trade. These are our most requested services.

See all services →
Pages for this city

Services with a page of their own in Rubí.

How we handle each of these services in Rubí, with prices and examples from the area.

Where we work

Rubí neighbourhoods and estates where we renovate.

We work across the whole area, with crews who know each type of home in Rubí.

We renovate mainly in:

Centre

Old centre and main streets with varied buildings, houses and units to restore and renovate.

See renovations in Centre →

Ca n’Oriol and El Pinar

Residential fabric with blocks where we renew services and efficiency.

Les Torres and estates

Detached houses with a garden: full renovation with outdoor space and climate control.

Sant Jordi and Can Fatjó

Residential housing with a renovation from start to finish.

And also in:

Neighbourhoods of Rubí with a page of their own:

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

Everything you need to know about renovating in Rubí: prices, licences, timescales and grants.

How much does it cost to hire a renovation company in Rubí?

As a guide, a full renovation runs between 520 and 1,340 €/m²: 520–650 €/m² at functional standard, 750–940 €/m² at mid-range and 1,060–1,340 €/m² at high-end, VAT extra. These figures come from our own quotes, not market estimates. A flat of 75–95 m² usually lands between 30,000 and 58,000 €; an estate house goes higher. We give you a fixed, itemised quote after the free technical visit, with no “from” prices.

How much does it cost to renovate a bathroom or a kitchen in Rubí?

As a reference, a complete bathroom usually runs from 9,500 to 19,800 € and a kitchen with units and appliances from 4,800 to 19,500 €, depending on floor area, finishes and the state of the services. The final price is fixed and in writing once we have seen the home.

What does your fixed quote include?

Everything, item by item: the labour of every trade, materials, waste management, protection of communal areas, the site manager’s coordination and the final clean. If your renovation needs a project or a licence, we itemise that too. What you sign is what you pay.

How do you avoid cost overruns?

With a detailed technical visit and a quote fixed item by item before starting, so no surprise “extras” appear. If you decide on a change during the works, we give you its cost in writing and it is only carried out when you approve it.

How long does a full renovation take?

A full renovation of an average home (70–100 m²) usually lasts between 10 and 16 weeks. Made-to-measure furniture and major works licences can add weeks. We give you a written programme before starting and keep you updated on how the work is going.

Do you work with architects and handle the licences?

Yes. We have registered architects and technical architects for the project and the site supervision when it is needed, and we file the works notification or licence with the relevant council, as well as the habitability certificate and the energy certificate.

Do you offer a warranty?

Yes. We give a written warranty on the work, and we stand behind what we do after we have finished too.

Are there grants or subsidies for renovating in Rubí?

Yes. If the renovation improves energy efficiency (windows, insulation, aerothermal heating) it can qualify for Next Generation funds managed in Catalonia by ICAEN and for income-tax deductions. The Generalitat and the county council also publish calls for renovation. We help with the paperwork.

Do you renovate estate houses with a garden?

Yes. In Rubí’s detached houses we work on interior design, climate control, outdoor space (garden, porch, pool) and efficiency, coordinating every trade under a single site manager.

What kinds of renovation do you do in Rubí?

The whole range: the full renovation of a flat in Rubí and home renovations in Rubí, followed by renovating a village house in Rubí and restoring old houses in Rubí. What a complete flat costs to renovate in Rubí is in the price section above, excluding VAT; the renovation of an old house in Rubí depends on structure and services. Every full renovation in Rubí comes with a project when one is needed — we also handle the renovation project in Rubí ourselves — and a quote fixed item by item.

However it is searched for, is it the same service?

Yes: “price to renovate a whole flat in Rubí”, “renovation project in Rubí”, “full flat renovation in Rubí”, “renovate a village house in Rubí”, “home renovations in Rubí” and “restoring old houses in Rubí” are different ways of writing the same need, and all of them get the same quote fixed item by item. The same goes for “renovating an old flat in Rubí”, “home restoration in Rubí”, “full-renovation quote in Rubí” and “shop renovation in Rubí”.

What should be checked when renovating an old flat in Rubí?

First comes the real condition of the services and the structure, which is why we start with a free, no-obligation technical visit. In Rubí’s block flats it is usually necessary to renew the services, treat damp and optimise the layout. Then we give you a fixed quote itemised by chapter, with the timescale set in writing.

Do you carry out partial renovations of units in Rubí?

Yes, the whole unit does not have to be renovated: changing the flooring, renewing the toilet, adapting the lighting or separating a space with plasterboard are common partial renovations. The price depends on those items and on whether the change needs an activity licence, and we give it to you fixed after the free visit. It is what people search for as the price of partial renovations of units in Rubí.

Free quote

Ask for your quote, no strings attached.

A free technical visit in Rubí and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →