Completed

Booster pump set and plumbing installation in a house in Rubí

Carrer de Sant Pere, Rubí · 16 m² · 2026

Pump room with an expansion vessel, pumps and polypropylene pipework

Project details

Floor area
16 m²
Property type
House
Duration
1 weeks
Year
2026
Status
Completed
Budget
17,000 €
What we did
Booster pump set with two pumps · Expansion vessel · Polypropylene pipework · Distribution manifold

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

A pump room: two pumps on a base, an expansion vessel, polypropylene pipework and a manifold with one valve per circuit.

When the mains pressure does not reach, a house needs its own booster pump set. In this one in Rubí it was fitted in a technical room: two pumps in parallel on a base, an expansion vessel and a brass manifold with one valve per circuit.

The whole installation is in heat-welded polypropylene pipe, with the branches in view and at a height that allows working without dismantling anything. The meter and the mains connection are in the same room.

It is not the most photogenic part of a house, but it is the one that decides whether the shower on the upper floor comes out with force. Plumbing work completed and in service.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.