Complete bathroom renovation in Cerdanyola block flats: waterproofing under the tray, forced ventilation, downpipes and a bath swapped for an accessible shower.
In the blocks of Serraparera, Fontetes, Banús or Canaletes, put up in the sixties and seventies, the bathroom is usually the smallest room in the flat and the most punished. Many are internal bathrooms, with no window or with a small opening onto the service shaft, and they have gone half a century with the same tile and the same pipes. Renovating the whole bathroom here starts by stripping everything back to the floor slab and seeing what lies underneath, because it is almost never what it looks like from outside.
What matters most is what you cannot see: the waterproofing. Under a shower tray or in the floor of an old bathroom there is rarely a continuous membrane. We put one in properly: membrane over the floor and the walls of the wet area, sealed junctions and drains, and a watertightness test with water before tiling. It is what prevents the stain on the ceiling of the neighbour below, and it is the first thing that is not improvised.
With no window, ventilation is forced or there is none. We fit an extractor with its own duct to the shaft or to the roof, sized for the bathroom, not the cheapest catalogue one. And then there is the shared downpipe: if it is fibre cement or cast iron of the period and has to be cut to connect the new drain, we talk to the administrator beforehand, because it affects the neighbours on the stack. We see it at the visit, not with the job already started.
And there is a case that comes up again and again: owners who have grown old with the flat and should no longer be stepping over the edge of a bath. We swap the bath for a flush shower, with a continuous fall, non-slip floor, a grab bar anchored to a wall that can take it and an easy-to-open screen. Done well, the bathroom is still the same bathroom, but it stops being a risk. We warn the community before starting, cover the landing and take the rubble down the same day. If the bathroom is only one part of what you want to renovate, see everything we do in Cerdanyola del Vallès.

A change many people want, told the way you will live it at home.
We protect the route through the home, remove the bath, its panel and the tiling in the area, and check what is underneath: the waste, the supplies and the state of the base. All the rubble leaves the same day, in sacks.
The new waste goes in position, the falls are formed and the whole shower area is waterproofed. Then a flush or ceramic tray and the new tiling. This is the stage that decides whether it ever leaks.
Taps, a made-to-measure screen, perimeter sealing and a fine check over. You end up with a safer shower and more usable bathroom — and even in a one-bathroom home the disruption is short.
None of them shows in the finished photo. All of them show after a few years.
A built-in tray with too little fall holds water in the corner from the first day. We give the right fall towards a waste with enough flow, and test it with water before any tiling.
Without air renewal, even the best bathroom grows mould in the joints within a single winter. A window where there is one; an extractor with a timer or a humidistat where there is not. It is a small item that protects all the others.
Classic cement grout stains and chips; in wet areas we use technical grout and well-applied quality sealants — the edge of the screen and the junction with the tray are where a bathroom starts to fail.
Concealed taps and hidden cisterns, yes — but with their access panels reachable. A beautiful bathroom where you cannot get to a stopcock ends up broken open with a hammer the day something drips.
Plenty of bathrooms are under five square metres. This is how to get the most out of them.
A wall-hung basin, a wall-mounted unit and a floating WC if the stack allows: an unbroken floor from wall to wall fools the eye and mops in a minute. Few things make a narrow bathroom feel bigger.
A hinged door eats half a square metre of the bathroom and dictates where each fitting can go. Recessed into the partition during the works, a sliding door frees that whole corner — and the works are the perfect moment to fit one.
Suction-cup shelves end up on the floor; a tiled niche inside the wall steals not a centimetre and keeps the bottles in order for good. It is decided before tiling, so ask for it in time.
A single central light throws a shadow right where you look at yourself. We put in general light, mirror light at face height and, if it fits, a generous mirror: the square metres do not change, the feel does.
Indicative ranges by specification, VAT excluded. The final figure comes from the survey.
| Specification | What it covers | Indicative range (€) | |
|---|---|---|---|
| Functional | Standard finishes, practical solution | 9,500 – 13,000 € | |
| Mid-range | Selected materials, best balance | 14,600 – 19,800 € | |
| Design / high end | Premium materials and high-end interior design | 18,800 – 26,000 € |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges for a full bathroom renovation, VAT excluded.
A cloakroom WC or a compact bathroom. Good storage and a wall-hung basin make a great deal of difference in a small room.
The usual city-flat bathroom, with a shower or a bath, a vanity unit and good storage. This is the size where swapping the bath for a walk-in shower pays off most.
Large bathrooms with a double basin, a built-in shower and sometimes a freestanding bath. Worth planning the lighting properly at this size.
Replacing the bath with a shower tray, with new tiling and a screen. Quick, and very well received.
If the strip-out reveals damp from a communal riser or from the flat above, that is a separate item and we will show you what we have found before pricing it. Fixing the bathroom without fixing the source is money spent twice; see damp treatment.
The scope of a turnkey bathroom renovation, and what normally sits outside it.
VAT (10% or 21% depending on your case) is always shown as its own line. If you want to supply your own tiles or sanitaryware, that is fine — tell us before we order, and we will price the fitting only and flag anything that will not work with the layout.
The same team and the same fixed quote, for the rest of the home in Cerdanyola del Vallès.
Each city has its own housing stock, its own buildings and its own permits.
One team for the whole job, in Barcelona and across Catalonia.
Renovating a bathroom in Cerdanyola: the questions we really get.
As a rough guide, a complete bathroom runs between 9,500 and 19,800 € excluding VAT, depending on size, finishes and the state of the services. In a block from the sixties, what moves the figure is what is under the tile: drains, downpipe, the condition of the floor. That is why the price is fixed item by item after the technical visit, not before.
Yes, and it is very common in the blocks of Cerdanyola. The condition is to ventilate with a mechanical extractor with its own duct, properly sized, and to choose materials that will not grow mould with the daily steam. A well-ventilated internal bathroom works better than one with a badly handled window. We check it on the visit, looking at where the duct can go.
If connecting your drain means touching the shared downpipe, it is not done on your own. We see what material it is and what state it is in, tell the administrator or the president, and coordinate the water shut-off with the neighbours on the stack. If the community already plans to replace it, we try to make your job fit with theirs.
A continuous membrane is laid over the floor and runs up the walls of the wet area, with corners and drain sealed. Before tiling it is filled with water to check that it does not leak. It is an item you do not see once the job is finished, and it is what decides whether, in five years, there is a stain on the ceiling of the neighbour below.
Yes. A flush tray or a built shower with a continuous fall, non-slip floor, fold-down bench or seat, grab bars anchored to the wall and an easy-opening screen. The job is short and the bathroom still looks like a normal bathroom, only safe.
For a repair or renovation of a bathroom that needs no technical project and does not touch partitions or the structure, in a building that is not listed, a simplified prior notification to Cerdanyola’s Ajuntament is enough, and we prepare it. If the layout changes or a technical project is needed, the town hall’s urban planning service is consulted first. If the electrics are renewed, they are legalised with their certificate. The community is told the start date and the noise hours.
Yes. If you renovate bathroom and kitchen at the same time, you share the visit, the site manager and the skip, and plumbing, electrics and drains are renewed only once. In a flat from the seventies it usually pays off, because the bathroom and kitchen water stacks are often side by side. You can also start with the bathroom and leave the kitchen for later.
Stripping the bathroom back to the base, renewing plumbing and drains, waterproofing, tiling, fitting sanitaryware, tray or built shower, screen, taps, extractor and electrics with their certificate. Everything goes item by item in a quote fixed after the free visit, with a single site manager coordinating the trades from the first day to the last.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia and a fixed written quote. We reply within 24 hours.