Renovations · Cornellà

Bathroom renovations in Cornellà

We renovate bathrooms in Cornellà from start to finish — waterproofing, plumbing, tiling, sanitaryware and screen — with particular care for dense, well-connected metropolitan flats. A fixed quote in writing and a dedicated site manager.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Bathroom renovation

Renovating the bathroom in Cornellà.

A well-renovated bathroom starts with what you cannot see: waterproofing, renewing plumbing and drainage and good ventilation to prevent damp. From there we work on tiling, shower trays, sanitaryware, taps and screen, and we optimise the layout even in small bathrooms. In Cornellà, this is key because of dense, well-connected metropolitan flats.

We do it with a single site manager and a fixed quote after the free technical visit. If you are after accessibility, we swap a bath for a shower and adapt the bathroom with minimal work — detailed in accessibility adaptations — and if the bathroom is only part of what you want renovated, see everything we do in Cornellà.

Bathroom at work in progress with newly installed toilet, beige tiling, white shower tray at the far end and a white panel recessed in the wall
The star job

Swapping the bath for a shower, day by day.

A change many people want, told the way you will live it at home.

Day 1 — the bath comes out

We protect the route through the home, remove the bath, its panel and the tiling in the area, and check what is underneath: the waste, the supplies and the state of the base. All the rubble leaves the same day, in sacks.

Days 2 and 3 — the part you never see

The new waste goes in position, the falls are formed and the whole shower area is waterproofed. Then a flush or ceramic tray and the new tiling. This is the stage that decides whether it ever leaks.

Days 4 and 5 — screen and finishing

Taps, a made-to-measure screen, perimeter sealing and a fine check over. You end up with a safer shower and more usable bathroom — and even in a one-bathroom home the disruption is short.

Built to last

Four decisions that separate a ten-year bathroom from a twenty-year one.

None of them shows in the finished photo. All of them show after a few years.

The fall and the waste

A built-in tray with too little fall holds water in the corner from the first day. We give the right fall towards a waste with enough flow, and test it with water before any tiling.

Ventilation

Without air renewal, even the best bathroom grows mould in the joints within a single winter. A window where there is one; an extractor with a timer or a humidistat where there is not. It is a small item that protects all the others.

Grout and sealants

Classic cement grout stains and chips; in wet areas we use technical grout and well-applied quality sealants — the edge of the screen and the junction with the tray are where a bathroom starts to fail.

Access to the valves

Concealed taps and hidden cisterns, yes — but with their access panels reachable. A beautiful bathroom where you cannot get to a stopcock ends up broken open with a hammer the day something drips.

Tight spaces

The small bathroom: site tricks that really work.

Plenty of bathrooms are under five square metres. This is how to get the most out of them.

Get everything off the floor

A wall-hung basin, a wall-mounted unit and a floating WC if the stack allows: an unbroken floor from wall to wall fools the eye and mops in a minute. Few things make a narrow bathroom feel bigger.

A sliding door

A hinged door eats half a square metre of the bathroom and dictates where each fitting can go. Recessed into the partition during the works, a sliding door frees that whole corner — and the works are the perfect moment to fit one.

Tiled niches in the shower

Suction-cup shelves end up on the floor; a tiled niche inside the wall steals not a centimetre and keeps the bottles in order for good. It is decided before tiling, so ask for it in time.

Layered light and a big mirror

A single central light throws a shadow right where you look at yourself. We put in general light, mirror light at face height and, if it fits, a generous mirror: the square metres do not change, the feel does.

Prices

What a bathroom renovation costs.

Indicative ranges by specification, VAT excluded. The final figure comes from the survey.

What a bathroom renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversIndicative range (€)
FunctionalStandard finishes, practical solution9,500 – 13,000 €
Design / high endPremium materials and high-end interior design18,800 – 26,000 €
Indicative prices · VAT not included. Simply swapping a bath for a shower starts at around 1,200 €. A bathroom is small, so the fittings are a big share of the total — the same room can double in price on tile and brassware alone. The other variable is whether the waste positions move: keeping the WC where it is saves opening the floor, and moving it is the most expensive change you can make in a small room. Both appear as their own lines in the quote.
Calculator

What might your new bathroom cost?

Indicative estimate9,500 – 13,000 €Functional · Medium (4–6 m²)
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by bathroom size.

Indicative ranges for a full bathroom renovation, VAT excluded.

Small bathroom or WCUp to 4 m²9,500 – 24,200 €

A cloakroom WC or a compact bathroom. Good storage and a wall-hung basin make a great deal of difference in a small room.

Full bathroom4 – 7 m²9,600 – 25,100 €

The usual city-flat bathroom, with a shower or a bath, a vanity unit and good storage. This is the size where swapping the bath for a walk-in shower pays off most.

Principal bathroom or suiteOver 7 m²From 10,300 €

Large bathrooms with a double basin, a built-in shower and sometimes a freestanding bath. Worth planning the lighting properly at this size.

Swapping a bath for a showerA single changeFrom 1,200 €

Replacing the bath with a shower tray, with new tiling and a screen. Quick, and very well received.

If the strip-out reveals damp from a communal riser or from the flat above, that is a separate item and we will show you what we have found before pricing it. Fixing the bathroom without fixing the source is money spent twice; see damp treatment.

No small print

What is included and what is not.

The scope of a turnkey bathroom renovation, and what normally sits outside it.

✓ Included in the price

  • Strip-out, clearance and removal of the old bathroom
  • New supply and waste runs with the correct falls
  • Full waterproofing of the wet zone
  • Mechanical extraction
  • Lighting and socket circuits to wet-room rating, with electrical certificate
  • Wall and floor tiling
  • Shower tray or formed-in-place shower base
  • WC, basin, vanity unit and shower screen
  • Taps, shower valve and shower head
  • Mirror, lighting and accessories
  • Snagging and a written warranty

✕ Not included — quoted separately

  • Sanitaryware or brassware above the grade itemised in your quote
  • Underfloor heating, unless itemised
  • Towel radiator, unless itemised
  • Repairs to a communal riser, which belong to the building
  • Damp or structural repair found during the strip-out
  • Council taxes and fees where they apply

VAT (10% or 21% depending on your case) is always shown as its own line. If you want to supply your own tiles or sanitaryware, that is fine — tell us before we order, and we will price the fitting only and flag anything that will not work with the layout.

In the same town

Other services in Cornellà

The same team and the same fixed quote, for the rest of the home in Cornellà.

The same work, elsewhere

Bathroom renovations in other cities

Each city has its own housing stock, its own buildings and its own permits.

Common questions

Frequently asked questions

Bathroom renovations in Cornellà: what you ask us most.

How much does it cost to renovate a bathroom in Cornellà?

In Cornellà, a complete bathroom usually runs from 9,500 to 19,800 € depending on floor area, specification and the condition of the services. We give you a fixed, itemised quote after the free technical visit.

Can you swap the bath for a shower?

Yes, it is a very common bathroom renovation. We replace the bath with a flush shower tray, improve the waterproofing and, if you need it, adapt the bathroom for greater accessibility, with minimal work.

What does your fixed quote include?

Everything, item by item: labour of every trade, materials, waste management, protection of communal areas, site-manager coordination and the final clean. What you sign is what you pay.

How much does it cost to renovate a flat in Cornellà?

As a guide, a full renovation runs between 520 and 1,340 €/m² depending on specification. After the free technical visit we give you a fixed, itemised quote, with no “from” prices.

Free quote

Get your bathroom quote in Cornellà

Free survey anywhere in Catalonia and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →