We renovate bathrooms in Manresa from start to finish — waterproofing, plumbing, tiling, sanitaryware and screen — with particular care for buildings in the Barri Antic and residential flats. A fixed quote in writing and a dedicated site manager.
A well-renovated bathroom starts with what you cannot see: waterproofing, renewing plumbing and drainage and good ventilation to prevent damp. From there we work on tiling, shower trays, sanitaryware, taps and screen, and we optimise the layout even in small bathrooms. In Manresa, this is key because of buildings in the Barri Antic and residential flats.
We do it with a single site manager and a fixed quote after the free technical visit. If you are after accessibility, we swap a bath for a shower and adapt the bathroom with minimal work — detailed in accessibility adaptations — and if the bathroom is only part of what you want renovated, see everything we do in Manresa.

A change many people want, told the way you will live it at home.
We protect the route through the home, remove the bath, its panel and the tiling in the area, and check what is underneath: the waste, the supplies and the state of the base. All the rubble leaves the same day, in sacks.
The new waste goes in position, the falls are formed and the whole shower area is waterproofed. Then a flush or ceramic tray and the new tiling. This is the stage that decides whether it ever leaks.
Taps, a made-to-measure screen, perimeter sealing and a fine check over. You end up with a safer shower and more usable bathroom — and even in a one-bathroom home the disruption is short.
None of them shows in the finished photo. All of them show after a few years.
A built-in tray with too little fall holds water in the corner from the first day. We give the right fall towards a waste with enough flow, and test it with water before any tiling.
Without air renewal, even the best bathroom grows mould in the joints within a single winter. A window where there is one; an extractor with a timer or a humidistat where there is not. It is a small item that protects all the others.
Classic cement grout stains and chips; in wet areas we use technical grout and well-applied quality sealants — the edge of the screen and the junction with the tray are where a bathroom starts to fail.
Concealed taps and hidden cisterns, yes — but with their access panels reachable. A beautiful bathroom where you cannot get to a stopcock ends up broken open with a hammer the day something drips.
Plenty of bathrooms are under five square metres. This is how to get the most out of them.
A wall-hung basin, a wall-mounted unit and a floating WC if the stack allows: an unbroken floor from wall to wall fools the eye and mops in a minute. Few things make a narrow bathroom feel bigger.
A hinged door eats half a square metre of the bathroom and dictates where each fitting can go. Recessed into the partition during the works, a sliding door frees that whole corner — and the works are the perfect moment to fit one.
Suction-cup shelves end up on the floor; a tiled niche inside the wall steals not a centimetre and keeps the bottles in order for good. It is decided before tiling, so ask for it in time.
A single central light throws a shadow right where you look at yourself. We put in general light, mirror light at face height and, if it fits, a generous mirror: the square metres do not change, the feel does.
Indicative ranges by specification, VAT excluded. The final figure comes from the survey.
| Specification | What it covers | Indicative range (€) | |
|---|---|---|---|
| Functional | Standard finishes, practical solution | 9,500 – 13,000 € | |
| Mid-range | Selected materials, best balance | 14,600 – 19,800 € | |
| Design / high end | Premium materials and high-end interior design | 18,800 – 26,000 € |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges for a full bathroom renovation, VAT excluded.
A cloakroom WC or a compact bathroom. Good storage and a wall-hung basin make a great deal of difference in a small room.
The usual city-flat bathroom, with a shower or a bath, a vanity unit and good storage. This is the size where swapping the bath for a walk-in shower pays off most.
Large bathrooms with a double basin, a built-in shower and sometimes a freestanding bath. Worth planning the lighting properly at this size.
Replacing the bath with a shower tray, with new tiling and a screen. Quick, and very well received.
If the strip-out reveals damp from a communal riser or from the flat above, that is a separate item and we will show you what we have found before pricing it. Fixing the bathroom without fixing the source is money spent twice; see damp treatment.
The scope of a turnkey bathroom renovation, and what normally sits outside it.
VAT (10% or 21% depending on your case) is always shown as its own line. If you want to supply your own tiles or sanitaryware, that is fine — tell us before we order, and we will price the fitting only and flag anything that will not work with the layout.
The same team and the same fixed quote, for the rest of the home in Manresa.
Each city has its own housing stock, its own buildings and its own permits.
One team for the whole job, in Barcelona and across Catalonia.
Bathroom renovations in Manresa: what you ask us most.
In Manresa, a complete bathroom usually runs from 9,500 to 19,800 € depending on floor area, specification and the condition of the services. We give you a fixed, itemised quote after the free technical visit.
Yes, it is a very common bathroom renovation. We replace the bath with a flush shower tray, improve the waterproofing and, if you need it, adapt the bathroom for greater accessibility, with minimal work.
Everything, item by item: labour of every trade, materials, waste management, protection of communal areas, site-manager coordination and the final clean. What you sign is what you pay.
Yes. We rehabilitate long-standing buildings in the old town, looking after structure and damp and modernising services, with a fixed quote and a dedicated site manager.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia and a fixed written quote. We reply within 24 hours.