Bathrooms renovated in buildings in the Centre, blocks in Llefià and houses two streets from the beach: a flush shower, ventilation that genuinely works and a quote fixed before a tile is touched.
In Badalona the bathroom gives away the age of each home: that of the Centre building won from half an alcove, that of the casa de cós hidden beside the yard, and that of the block in Llefià or La Salut, identical to that of two hundred neighbours, with its standard bath and its little window. Each one asks for its own job.
Living by the sea shows in the bathroom more than in any other room of the house. The air already arrives damp, and if the extraction is not properly solved, mould finds a home. That is why here we do not negotiate on it — mechanical, with a humidity sensor, well ducted — nor on the materials: surfaces that do not absorb, mirrors with a protected back and metal that does not pit.
In the blocks of the sixties the bathroom is small, internal and has a bath nobody uses any more. Switching to a shower tray transforms it in under a week, and on the way we renew plumbing that in these buildings runs short of everything, taking storage from the walls with built-in niches and a wall-hung unit.
In the casas de cós and the buildings of Dalt de la Vila the challenge is different: fitting a modern bathroom into a house that never expected one. Drains with the fall counted out, walls that do not allow careless chasing and the odd surprise behind the old tiling. It is the kind of job where experience pays for itself.
The local paperwork is included: we file the comunicat d’obres with Badalona’s Ajuntament, agree hours and use of the staircase with your community, and the rubble comes down in sacks with its permit. Your only job is choosing finishes; we take care of the rest.

Within a kilometre of the beach, these three details decide whether your bathroom ages well or badly.
Badalona air arrives laden: without serious extraction it condenses on the coldest wall and blooms in the joints. We fit extractors with a humidistat that start on their own and keep running a few minutes after the shower — the difference between a healthy bathroom and one that smells shut in.
Salt pits cheap metal in two winters: screen hinges, frames, towel rails. We choose treated finishes, stainless steel where it counts and mirrors with a sealed edge, which near the sea is where they start to fail.
Unsealed stone, wide cement joints and units with a bare edge suffer more here than inland. Compact surfaces, technical grout and sealed edges: dull to describe, decisive after five years.
The most requested job in the city is not done the same way everywhere.
Non-slip tray, made-to-measure screen and a well-anchored grab rail: a renovation designed to keep you at home for many years, in buildings where the lift does not always exist and the hills of the neighbourhood already give plenty of exercise.
Old drains force you to rethink falls and, sometimes, to raise the floor. We solve it without an internal step — a genuinely flush shower — and with an accessible hatch in case the building decides to make trouble in a few years.
Here we usually rearrange the whole bathroom: the shower against the yard wall to ventilate directly, the basin where the natural light arrives and a sliding door that frees the corner that was always missing.
Indicative ranges by specification, VAT excluded. The final figure comes from the survey.
| Specification | What it covers | Indicative range (€) | |
|---|---|---|---|
| Functional | Standard finishes, practical solution | 9,500 – 13,000 € | |
| Mid-range | Selected materials, best balance | 14,600 – 19,800 € | |
| Design / high end | Premium materials and high-end interior design | 18,800 – 26,000 € |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
The scope of a turnkey bathroom renovation, and what normally sits outside it.
VAT (10% or 21% depending on your case) is always shown as its own line. If you want to supply your own tiles or sanitaryware, that is fine — tell us before we order, and we will price the fitting only and flag anything that will not work with the layout.
The same team and the same fixed quote, for the rest of the home in Badalona.
Each city has its own housing stock, its own buildings and its own permits.
One team for the whole job, in Barcelona and across Catalonia.
Each card opens its project: real photos, metres and the price band of the job.
The bathroom in Badalona: the questions we hear at every visit.
The ranges you see in the prices section hold for the whole city: 9,500–13,000 € for a functional bathroom, 14,600–19,800 € at mid-range and 18,800 to 26,000 € at design level, always excluding VAT. What tips the balance in Badalona is the building: original plumbing in the blocks, capricious drains in the casas de cós. After the free visit, a figure fixed item by item.
It is the most delicate combination — a windowless bathroom plus damp air — and it has a textbook solution: mechanical extraction with a sensor, pore-free materials and, if the service shaft allows, its own well-ducted outlet. Done properly, it does not breed mould.
It is one of the commonest renovations in the area: a flush tray, new tiling of the wet zone and a made-to-measure screen, in four or five days of work. If there are elderly people at home, we add a seat, grab rails and a floor with more grip — without the result looking clinical.
The comunicat d’obres, which we file with the fees itemised in the quote; the job starts without waiting. Only if load-bearing walls are touched or the building is protected does a technical project come into play — and we handle that too.
One to two weeks depending on scope, with the phases ordered so that the toilet works every night. The two or three critical moments we warn you about days ahead, not the same morning. It can be done while you live at home — the plan is set up for that.
Yes: we connect the new bathroom with the right falls and leave your section ready for the day the community tackles its replacement. And if we see the stack truly exhausted, we tell you before quoting — we would rather lose a job than bury your money on a dead pipe.
Often yes: under the stairs, in a corner of the gallery or biting into a generous laundry room. The key is the drain — distance to the stack and available fall — and ventilating the result well. A well-placed guest WC changes the life of a two-storey house.
Toughened glass with an anti-limescale treatment and a lacquered aluminium or stainless-steel frame — the cheap chrome pits quickly here. Fixed if the opening lets you enter from the side, sliding if the bathroom is tight. And with a top track: floor tracks collect water, limescale and sand brought back from the beach.
Yes, and it usually pays: the team is already in, the protection is up and the haulage is shared across more work. Ask for it with the bathroom quote and we itemise the extra items separately, so you can compare figures and decide without pressure.
From Dalt de la Vila to the Gorg and from Canyadó to Sant Crist — the whole city — and also Montgat, Tiana and Sant Adrià de Besòs. The technical visit is free whichever doorway you come out of, and whoever comes to measure is who then runs your job.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia and a fixed written quote. We reply within 24 hours.