Bathrooms in Calacatta-effect porcelain with gold profiles in Horta, Barcelona
Carrer de Lisboa, Barcelona · 17 m² · 2026

Project details
- Floor area
- 17 m²
- Property type
- Flat
- Duration
- 6 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 18,500–19,500 €
- What we did
- Three complete bathrooms · Large-format Calacatta-effect tile · Built-in showers with bench and linear drain · Framed niches · Screens with gold profiles · Onyx bath
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
Three bathrooms clad in large-format Calacatta-effect porcelain, with built-in showers, benches, framed niches and screens with gold profiles.
Large-format Calacatta-effect tile is demanding: the bigger the piece, the fewer the joints and the less room to hide a mistake. Each wall panel was set out before cutting so that the veining carried on from one piece to the next and the joints fell where they do not get in the way.
The showers are built-in, with a bench clad in the same material, a linear drain and niches framed in a gold profile — the same gold as the screens, which is what makes the whole read as one decision rather than three different bathrooms.
One of the bathrooms went another way: brown onyx around a built-in bath, with a framed mirror. It is the warm counterpoint in a home that is otherwise white.
The photos of the process are here, with the wedges and spacers still in place, because in large-format tiling the process is half the result.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.