Bathroom renovation in marble-effect porcelain in Sant Joan Despí
Carrer Major, Sant Joan Despí · 13 m² · 2026

Project details
- Floor area
- 13 m²
- Property type
- Flat
- Duration
- 7 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 10,800–11,500 €
- What we did
- Two complete bathrooms · Marble-effect porcelain · Built-in shower bases with a linear drain · Sliding screens · Wall-hung units · Grey marble border
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
Two bathrooms in marble-effect porcelain with built-in shower bases, linear drains, sliding screens and wall-hung units.
These two bathrooms share a recipe and change tone: marble-effect porcelain on walls and floor, a built-in shower base continuous with the flooring and a linear drain against the wall, which is what lets the floor run into the shower without a step.
The units are wall-hung to leave the floor clear — it cleans in half the time and the bathroom looks bigger — and the screens are sliding, because in a narrow bathroom a hinged door eats up the way through.
The second bathroom has a grey marble border at mid-height that breaks up the pale wall and marks the wet zone without changing material.
A no-frills bathroom renovation in Sant Joan Despí: well set out, well waterproofed and easy to maintain.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.
























