Completed

Bathrooms tiled in marble-effect porcelain in La Barceloneta, Barcelona

Carrer de Balboa, Barcelona · 4 m² · 2026

Bathroom tiled in strongly veined marble-effect porcelain, with the bath already fitted

Project details

Floor area
4 m²
Property type
Flat
Duration
3 weeks
Year
2026
Status
Completed
Budget
5,500–5,700 €
What we did
Marble-effect porcelain tiling up to the ceiling · Built-in shower with a recessed cistern · Bath panels in ceramic · Mitred junctions at corners and openings

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

Several bathrooms tiled in marble-effect porcelain: strong veining, Calacatta and travertine, with the junctions mitred and no border strips.

Porcelain that imitates marble has become the default material for bathrooms, and for that very reason it is often laid badly. The difference is not in the piece you buy: it is in how it is cut and where it meets.

In these bathrooms the veining is set out before anything is stuck down, so that the pattern carries on from one piece to the next instead of breaking at every joint — with strongly veined slabs that means arranging the pieces on the floor first. The corners are mitred, with no edge profile, and the tiling goes up to the ceiling: stopping halfway up the wall is what gives away a cheap bathroom.

The details you see up close are the ones that take time: the opening for the recessed cistern centred on the piece, the built-in shower base flush with the floor, the bath panel done in a single piece of onyx laid against the vein.

Tiling work in Barcelona, with every piece measured and cut on site.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.

✆ Call✦ WhatsAppGet a quote →