In progress

Bathroom with patchwork tile in Gavà

Rambla de Joaquim Vayreda, Gavà · 5 m² · 2026

Patchwork tile panel over the bath, already laid and grouted

Project details

Floor area
5 m²
Property type
Flat
Duration
2 weeks
Year
2026
Status
In progress
Budget
4,200 €
What we did
Patchwork tile panel over the bath · Motifs laid out dry beforehand · Plain tiling on the rest of the room

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

A patchwork panel over the bath, with the motifs laid out dry before sticking so that the same design does not repeat vertically.

Patchwork tile is sold in boxes with the motifs mixed at random, and laid as it comes out of the box it always ends up the same way: two or three identical designs side by side, which is the only thing the eye sees afterwards.

The solution is no mystery, only time. All the pieces are spread out on the floor, arranged so that no motif repeats in the same row or in the same column, and laid following that order. Half a morning of work before the first piece is stuck.

The rest of the room is plain on purpose. A decorated panel needs calm walls around it to work; two panels competing cancel each other out.

Bathroom tiling in Gavà, with the panel laid out by hand.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.