Completed

Bathroom renovation in marble-effect porcelain in Castelldefels

Avinguda de la Constitució, Castelldefels · 9 m² · 2025

Bathroom in marble-effect porcelain with a glazed shower, a wall-hung toilet and a niche

Project video

Project details

Floor area
9 m²
Property type
Flat
Duration
3 weeks
Year
2025
Status
Completed
Budget
6,500–7,800 €
What we did
Bathroom renovation · Flush shower with a linear drain · Wall-hung toilet · Made-to-measure laundry cupboard

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

A bright white bathroom in marble-effect porcelain: flush shower with a linear drain, a niche with shelves and a cupboard that hides the washing machine.

Large-format marble-effect porcelain has a clear advantage in a bathroom: the veining hides the joints and the room looks as if it were made from a single piece. Here it was laid from floor to ceiling, with the flush shower running on in continuity and a linear drain beside the wall.

The hinged screen with a towel-rail bar, the recessed taps and the shelved niche beside the wall-hung toilet leave the bathroom without a loose object. Outside, a white floor-to-ceiling cupboard takes in the washing-machine column.

A bathroom renovation in Castelldefels of the kind that is done in two weeks and enjoyed for many years.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.

✆ Call✦ WhatsAppGet a quote →