In progress

Bathroom with a botanical hexagon meeting a wood-effect floor in Vall d’Hebron, Barcelona

Passeig de la Vall d'Hebron, Barcelona · 5 m² · 2026

Hexagon tile panel with a botanical motif, already laid above the bath

Project details

Floor area
5 m²
Property type
Flat
Duration
3 weeks
Year
2026
Status
In progress
Budget
6,600 €
What we did
Wall panel of decorated hexagon tile with a botanical motif · Wood-effect porcelain flooring · Junction between hexagon and plank with no profile · Laying with spacers and a leveller

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

A bathroom under way where the decorated hexagon meets the wood-effect plank with no finishing profile: a visible cut, piece against piece.

Mixing two ceramics in the same room is easy to draw and hard to finish. The delicate point is neither the hexagon nor the plank: it is the line where they touch.

Here it is solved without an aluminium profile. Each hexagon is cut following the edge of the plank, piece by piece, so that the junction is left as a visible cut and the two ceramics sit at the same level. It is slower than screwing down a threshold strip, and it is the difference between a finish and a patch.

The botanical motif also means the pieces have to be sorted before they are stuck: the pattern repeats every few tiles, and laid at random the wall reads as a factory error instead of as a pattern.

Work under way in Vall d’Hebron; the photos are from the laying stage, so this project does not carry a guide budget.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.