Built-in showers with linear drains in Barberà del Vallès
Avinguda de la Generalitat, Barberà del Vallès · 4 m² · 2026

Project details
- Floor area
- 4 m²
- Property type
- Flat
- Duration
- 2 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 5,500–6,000 €
- What we did
- Flush built-in shower base · Linear drain flush with the paving · Fall formed in the mortar · Continuous tiling between floor and wall
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
Built-in shower bases with a linear drain: the fall is formed in the mortar and the porcelain follows it, with no step and no prefabricated tray.
A linear drain looks like an aesthetic decision and is above all a constructional one. By collecting the water along a line and not at a point, it lets the base be given a fall in a single direction, and that is what makes it possible to use large pieces without cutting them into four slopes.
The fall is formed beforehand, in the mortar layer, and checked with a level and with water before anything is laid on top. Then comes the waterproofing, rising far enough up the wall, and only then the porcelain.
The grate is set flush with the finished paving, not with the mortar: a few millimetres too high and the water stays in the base; a few too low and the channel shows. It is the adjustment that decides whether the shower works.
Built-in showers in Barberà del Vallès, with the fall made by hand and checked with water.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.