Renovation of three bathrooms with a black marble floor in the Eixample, Barcelona
Carrer d'Enric Granados, Barcelona · 21 m² · 2026

Project video
Project details
- Floor area
- 21 m²
- Property type
- Flat
- Duration
- 8 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 18,500–22,500 €
- What we did
- Three complete bathrooms · Black marble floor · Backlit mirrors · Made-to-measure slatted units · Herringbone wooden wall
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
Three bathrooms of a flat in the Eixample with one shared black marble floor and three characters: a dark cloakroom with gold gresite, a bathroom with a double basin and a white bathroom with a slatted unit.
In a flat in the Eixample with several bathrooms, the easy thing is to repeat the same one three times. Here it was done the other way round: a common floor of polished black marble gives them unity, and each bathroom was solved with a character of its own.
The guest cloakroom is the boldest: dark walls, gold gresite framing a capsule-shaped backlit mirror, a countertop basin and, behind the wall-hung toilet, a herringbone wooden wall with a lit niche.
The main bathroom has a double undermount basin on a unit of white slats, a full-width mirror and a glazed shower with fluted glass; the third, in white, repeats the slatted unit with a wood-framed mirror.
A bathroom renovation in the Eixample where the black marble is the common thread and the details — the light, the wood, the gresite — do the rest.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.











