Bathrooms renovated in grey and wood in Camp de l’Arpa, Barcelona

Carrer del Freser, Barcelona · 4 m² · 2026

Bathroom in grey and wood, with a black-framed screen and a wall-hung basin

Project details

Floor area
4 m²
Property type
Flat
Duration
3 weeks
Year
2026
Status
Completed
Budget
8,500–9,500 €
What we did
Grey porcelain tile combined with wood-effect · Screens with black frames · Niches lined in the same material · Wall-hung toilets and basins on vanity units

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

Bathrooms done with the same pair of materials — grey porcelain tile and wood-effect — with the wood used where it is touched: niches, fronts and units.

Grey and wood is the most requested combination in a bathroom, and also the easiest to spoil: as soon as the wood covers too much wall, the bathroom looks like a sauna, and if it covers too little, it looks like a mistake.

The rule applied here is simple: the wood goes where it is touched or looked at closely — the front of the bath, the back of a niche, the vanity unit — and the grey does the rest. That way the warm material shows up front without overheating the whole.

The niches are set out using the whole piece so that no offcuts are left visible, and the toilets are wall-hung: they cost more to install, but the floor stays continuous and the bathroom is cleaned in a single sweep.

Several different bathroom renovations with the same choice of materials, in Camp de l’Arpa and nearby.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.