Black-and-white bathroom with three-dimensional tile in Hostafrancs, Barcelona

Carrer de la Creu Coberta, Barcelona · 5 m² · 2026

Finished black bathroom with a panel of three-dimensional tile in black and white

Project details

Floor area
5 m²
Property type
Flat
Duration
3 weeks
Year
2026
Status
Completed
Budget
6,500–7,000 €
What we did
Panel of three-dimensional relief tile · Matching matt black tiling · Built-in shower with a flush base · Laying with a wedge levelling system

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

A black bathroom with a single panel of three-dimensional tile in black and white, laid with a levelling system so the relief does not wobble from piece to piece.

A tile with relief does not forgive a single millimetre. On a flat piece a small ridge between tiles is disguised; on one with volume it shows from the door, because the raking light draws it.

Hence the levelling wedges that appear in the site photo: the whole surface is laid with levellers and they are not removed until the adhesive has cured. The geometric pattern also means setting out the entire panel before starting, so that the pattern closes at both ends and there is not half a cube left cut against the ceiling.

The rest of the bathroom is in matt black, deliberately flat: if every wall had relief, none would stand out. A single panel does the work.

Bathroom tiling in Hostafrancs, with the material placed where people look.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.