Bathroom renovation with aqua-green tile in Santa Coloma de Gramenet
Carrer de Sant Carles, Santa Coloma de Gramenet · 7 m² · 2026

Project details
- Floor area
- 7 m²
- Property type
- Flat
- Duration
- 3 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 7,000–8,500 €
- What we did
- Bathroom renovation · Aqua-green tile laid vertically · Made-to-measure wooden unit · Built-in shower · Wall-hung sanitaryware
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
A bathroom with aqua-green tile laid vertically, a made-to-measure wooden unit, a built-in shower and wall-hung sanitaryware.
Aqua-green tile laid vertically is the only colour decision in the bathroom, and it is enough: it visually lengthens the wall, reflects the light and gives the room a character that white does not.
Underneath goes the usual, done properly: a waterproofed built-in shower, water points set out before tiling and wall-hung sanitaryware with a concealed frame to leave the floor free. The wooden unit was made to measure for the space.
This bathroom renovation in Santa Coloma shows that colour does not make a job more expensive: it is chosen at the start and laid just as well as white.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.






