Bathrooms renovated in Eixample buildings, flats of the seventies and penthouses with views: stacks brought up to date, ventilation properly solved and a quote fixed before the first blow.
Many Barcelona buildings were born without a bathroom. In the buildings of the Eixample and Ciutat Vella, the bathroom was added decades later wherever it would fit — in the gallery, in a corner of the corridor, stealing metres from an alcove. That is why there are so many odd bathrooms in this city: long and narrow, windowless, with the shower squeezed under a ceiling that drops. Our job is to turn them into bathrooms that look as if they had always been there.
The first chapter of a Barcelona bathroom is always the stack. In an old building it can be original — sometimes still lead or fibre cement — and shared with the whole building: what can be connected, where and at what fall is decided by it. We check it before drawing anything, and if the community has its replacement pending, we tell you how to fit your job in with theirs.
The second is ventilation. A good share of Barcelona’s bathrooms face a light well or face nowhere: we fit mechanical extraction with a humidity sensor, respect the courtyard’s easements and choose materials that do not breed mould even with daily steam. A well-ventilated internal bathroom works better than an external one badly solved.
In the flats of the sixties and seventies — Nou Barris, Sant Martí, Sants, La Verneda — the bathroom is small and a copy of the neighbour’s: a bath nobody uses, a small window onto the service shaft and tired tiling. Switching to a shower tray with built-in storage transforms it in a week, and the plumbing comes out new, which is what really ages.
And the Barcelona paperwork, sorted: a works notification to the Ajuntament filed by us, coordination with the community over hours and the lift, and rubble brought down in sacks with its street permit. If your building is listed, the heritage procedure is also on us.

Four traits we see almost only here, and how we solve them.
Added in the gallery or biting into an alcove, shaped like a railway carriage. We rearrange the fittings — toilet by the stack, shower where the ceiling allows — and the corridor bathroom becomes a real bathroom.
Buildings settle, and old bathrooms give it away: impossible falls and drains running uphill. We raise and level before anything else; without that base, the best shower tray ponds.
It ventilates, but it also shows your bathroom to the neighbourhood and lets the heat escape. Frosted glass, new joinery and a supporting extractor: light yes, draughts and glances no.
The false ceiling of a Barcelona bathroom hides the neighbour upstairs’ pipes. We leave an accessible hatch and lighting designed for low ceilings — and if one day it drips, nobody has to break your work to get to it.
Three typical commissions with their indicative band, VAT extra. Your exact figure comes from the visit.
Complete renovation in the Eixample or Gràcia: new plumbing and drains, levelling, built-up shower and finishes worthy of the building. It usually runs between 14,600 and 19,800 € at mid-range.
Bath out, non-slip tray, new tiling and a unit with storage. The functional band — 9,500 to 13,000 € — handles most of these bathrooms, in one or two weeks.
Double basin, big shower, sometimes a freestanding bath like the one in the photo above. From the design range — 18,800 to 26,000 € — depending on sanitaryware and taps. This is where a good project pays off most.
Indicative ranges by specification, VAT excluded. The final figure comes from the survey.
| Specification | What it covers | Indicative range (€) | |
|---|---|---|---|
| Functional | Standard finishes, practical solution | 9,500 – 13,000 € | |
| Mid-range | Selected materials, best balance | 14,600 – 19,800 € | |
| Design / high end | Premium materials and high-end interior design | 18,800 – 26,000 € |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
The scope of a turnkey bathroom renovation, and what normally sits outside it.
VAT (10% or 21% depending on your case) is always shown as its own line. If you want to supply your own tiles or sanitaryware, that is fine — tell us before we order, and we will price the fitting only and flag anything that will not work with the layout.
The same team and the same fixed quote, for the rest of the home in Barcelona.
Each city has its own housing stock, its own buildings and its own permits.
One team for the whole job, in Barcelona and across Catalonia.
Finished bathroom jobs, with their project sheet: click a photo and see metres, timescale and budget.
Renovating a bathroom in Barcelona: what everybody asks us.
The same bands you will see in the prices section: 9,500–13,000 € for a functional bathroom, 14,600–19,800 € at mid-range and 18,800–26,000 € at design level, always excluding VAT. In Barcelona what pushes the figure up is not the tile: it is the building — stacks to replace, floors to level, material carried up by hand. The free visit clears it up and the quote is fixed item by item.
Yes, and it is the commonest case in the Eixample: we connect your new bathroom to the existing stack with the right falls and leave your section ready for when the community replaces it. If the stack is on its last legs, we tell you plainly before starting — renovating on top of an exhausted pipe is throwing money away.
Internal bathrooms can turn out very well. An extractor with a humidity sensor that keeps running a few minutes after the shower, layered lighting that stands in for natural light and pore-free materials. The myth of the bathroom with a window comes from when there was no alternative; today it is a preference, not a necessity.
A works notification to the Ajuntament, which we file with its fees itemised in the quote — it does not delay the start. It only changes if structural elements are touched or the building is listed: then a project or the heritage procedure is added, and we handle that too.
Often yes: the key is the distance to the stack and the centimetres of raised floor available to give the drain a fall. The usual places are the gallery, a generous dressing room or the back of an alcove. A macerator pump reaches where gravity does not, although we prefer to exhaust the natural options first.
The Barcelona classic. The priority is that the bathroom does not force them out of their home: a flush shower with a seat, grab rails well anchored to the wall, a floor that grips when wet and shadow-free light. A one-week job, designed so that they stay in their long-time home for many years more.
One to two and a half weeks depending on scope. If it is the only bathroom, we order the phases so that toilet and basin work almost every day — the two or three critical days we warn you about in advance, not the day before. Living alongside the work in an occupied flat is part of the trade, not an extra nuisance.
It is hard water, and it shows: limescale on aerators, screens and heating elements. We fit taps with finishes that tolerate it, screens with an anti-limescale treatment and, if you want, leave the supply ready for a water softener. It is not alarmism — it is choosing materials knowing what water will run over them.
Yes, with the respect they demand: inside, almost anything is possible if it is processed properly, and the protected elements — vaults, hydraulic tile, joinery — are kept or recovered. A modern bathroom inside a building a century and a half old is among the loveliest jobs there are.
From Ciutat Vella to Sarrià and from Horta to La Marina: all ten districts and the metropolitan area. The team works in Barcelona every day, knows its narrow entrances and its community hours, and the technical visit is free across the whole city.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia and a fixed written quote. We reply within 24 hours.