Renovations · Barcelona

Commercial unit renovations in Barcelona

We renovate commercial units in Barcelona and carry out changes of use from shop to home, with services, accessibility and the handling of business-activity or works licences. A fixed quote in writing.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Commercial unit fit-out

Renovating a commercial unit in Barcelona.

Renovating a commercial unit in Barcelona means looking at use, services and regulations: adapting the space, electrics and air conditioning, accessibility, smoke extraction if it applies and the corresponding activity licence. We also convert shops into homes when planning rules and habitability minimums allow.

We work with a single site manager and a fixed quote item by item, and we coordinate the technicians (project, activity, supervision) so you open or move in without surprises. If what you want is to convert the unit into a home, the requirements are in changing a shop into a home; and if the work is in your home, you have everything we do in Barcelona.

Plasterboard partition with two internal windows separating two rooms of a commercial unit, with a wooden counter, a cupboard, a step ladder and tiled floor, in a renovation in Sarrià-Sant Gervasi
Prices

What fitting out a unit costs.

Per square metre of floor area, VAT excluded. The activity project is separate.

What fitting out a unit costs — Indicative prices · VAT not included
SpecificationWhat it coversPer m² (excl. VAT)
Basic fit-outStandard finishes, practical solution300 – 600 €/m²
Turnkey / designerPremium materials and high-end interior design1,000 – 1,800 €/m²
Indicative prices · VAT not included. The biggest driver is the starting condition — a raw shell, or a unit previously used for a different activity, costs more than one already set up for something similar — and what your business requires: smoke extraction, fire protection and accessible toilets can each be significant items. Everything is itemised, with the activity project shown separately.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate24,000 – 48,000 €Basic fit-out · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of unit.

Indicative ranges for the works, VAT and the licence process excluded.

Small unitUp to 60 m²20,000 – 60,000 €

Neighbourhood shops and small offices. Accessibility and services set the minimum.

Medium unit60 – 150 m²45,000 – 130,000 €

The most common size. Depends heavily on the activity and the starting condition.

Large unitOver 150 m²From 100,000 €

Large commercial spaces, with larger services, air conditioning and fire protection.

Activity projectTechnical procedureFrom 1,500 €

The project and technical supervision for the activity licence, quoted separately.

The figure that is hardest to promise is the one you most want: the date the licence arrives. It is set by the council, not by us. We build the programme so that the building work finishes as the licence is due, and we say honestly if the council’s timing looks likely to be the constraint.

No small print

What is included and what is not.

The scope of a turnkey fit-out, and what is separate.

✓ Included in the price

  • Survey and compliance assessment for your activity
  • Strip-out and clearance
  • Electrics and lighting, with certificate
  • Plumbing, drainage and ventilation
  • Air conditioning
  • Accessible toilets and entrance, where required
  • Fire protection, where required
  • Floors, walls, ceilings and joinery
  • Shopfront and signage preparation
  • Final certificates and a written warranty

✕ Not included — quoted separately

  • Activity project, technical supervision and licence fees, which are quoted separately
  • Council taxes and fees, which are paid to the council
  • Specialist equipment for your business
  • Furniture, shelving systems and decoration, unless itemised
  • Signage, unless itemised
  • Landlord’s works or consent, which depend on your lease

VAT is shown as its own line — normally 21% on works for a business. Check your lease before you commit: it often says who pays for what at the end of the term, and what the landlord must approve.

In the same town

Other services in Barcelona

The same team and the same fixed quote, for the rest of the home in Barcelona.

The same work, elsewhere

Commercial unit renovations in other cities

Each city has its own housing stock, its own buildings and its own permits.

Common questions

Frequently asked questions

Commercial unit renovations in Barcelona: what you ask us most.

Can you convert a shop into a home?

In many cases yes. We study whether the unit meets habitability minimums (height, ventilation, floor area) and whether planning allows the change of use; then we process it and carry out the whole renovation.

Do you handle the licence for the business activity?

Yes. With chartered technicians we prepare the activity project and process the licence or notification with the council, as well as carrying out the work (services, accessibility, finishes) so that you can open.

What does your fixed quote include?

Everything, item by item: labour of every trade, materials, waste management, protection of communal areas, site-manager coordination and the final clean. What you sign is what you pay.

Do you work in old and protected buildings in Barcelona?

Yes. In Barcelona we renovate modernista and listed buildings in the Eixample and Ciutat Vella: we restore the elements of value and, when the façade or communal elements have to be touched, we handle the heritage authorisation with the council.

Free quote

Get your commercial unit renovation quote in Barcelona

Free survey, including before you sign the lease. A fixed quote and a written handover date.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →