Renovations · Barcelona

Luxury renovations in Barcelona

Luxury renovations in Barcelona: interior design, high-specification materials, home automation and precision climate control for Eixample flats, homes from the ’60s and ’70s and buildings with specific requirements. With a single site manager, a fixed quote and the utmost discretion.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Luxury renovation

A high-end renovation in Barcelona.

A high-end renovation in Barcelona looks after every detail: interior design, fine materials (natural stone, timber, microcement), made-to-measure joinery, technical lighting, home automation and precision climate control. In Barcelona we work on Eixample flats, homes from the ’60s and ’70s and buildings with specific requirements, where finish and coordination of trades make the difference.

We work with interior designers and with a single site manager, with a fixed quote item by item and utmost confidentiality. We handle permits and technical supervision with chartered professionals and a written guarantee on the work.

Double chrome towel rail on a grey porcelain wall, next to a door, in a high-end flat in La Bonanova
Prices

What a luxury renovation costs.

Per square metre of floor area, VAT excluded. The design fee is separate where we commission it.

What a luxury renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversPer m² (excl. VAT)
High specificationStandard finishes, practical solution1,500 – 2,200 €/m²
Fully bespokePremium materials and high-end interior designFrom 3,000 €/m²
Indicative prices · VAT not included. At this level the cost sits in three places: bespoke joinery and stone, which are made for your rooms and cannot be value-engineered without becoming something else; integrated services, where underfloor systems and lighting control are designed in rather than added; and execution time, because millimetre tolerances take longer than millimetre-ish ones. We itemise all three so you can see the trade-offs instead of guessing at them.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate120,000 – 176,000 €High specification · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of property.

Indicative ranges for a complete high-end renovation, VAT excluded.

Medium apartmentUp to 120 m²From 180,000 €

A fully designed interior, integrated control and good materials in a high-specification flat.

Large apartment120 – 200 m²From 300,000 €

Several en-suites, a designed kitchen, architectural lighting and bespoke joinery throughout.

Large residenceOver 200 m²Bespoke

Wellness, home cinema and the top of the finish range. The figure comes out of the design, and quoting one before that would be fiction.

Interior designDesign serviceOn request

A full interior design scheme taken on as a service in its own right. We coordinate its execution either way.

In a protected or period building, what you are allowed to do constrains the design before the budget does — catalogued façades, original floors that must be retained, lift shafts that cannot move. We establish those limits at the survey, because discovering them after the scheme is drawn is the most expensive sequence there is.

No small print

What is included and what is not.

What a turnkey high-end renovation covers, and what is genuinely separate.

✓ Included in the price

  • Selective demolition and clearance
  • Calculated structural strengthening and openings
  • Full replacement of plumbing and electrical services
  • Underfloor heating and cooling with air-source heat pump
  • Lighting design, scene control and first-fix cabling
  • Audio, security and app-based control, pre-wired
  • Natural stone, large-format surfaces and timber floors
  • Bespoke joinery: wardrobes, panelling, doors and shelving
  • Designed kitchen and principal bathroom
  • Architectural lighting and interior finishes
  • Commissioning of the control system with you
  • Permit filing, snagging and a written warranty
  • Discretion protocol for the whole project

✕ Not included — quoted separately

  • Interior design fee, where commissioned as a separate service
  • Art, loose furniture and soft furnishings, unless itemised
  • Appliances above the grade itemised in your quote
  • Works to the building’s communal areas or façade
  • Swimming pool, wellness plant and home cinema equipment, quoted separately
  • Council taxes and professional fees where they apply

VAT is shown as its own line — 10% or 21% depending on the property and who is invoiced. On a high-end job the materials share often pushes the work past the 40% threshold that the reduced rate depends on, so we assess it explicitly rather than assuming the lower rate and correcting later.

In the same town

Other services in Barcelona

The same team and the same fixed quote, for the rest of the home in Barcelona.

The same work, elsewhere

Luxury renovations in other cities

Each city has its own housing stock, its own buildings and its own permits.

Common questions

Frequently asked questions

Luxury renovations in Barcelona: what you ask us most.

How much does a luxury renovation in Barcelona cost?

A high-specification renovation usually starts from 1,200 €/m² and rises with materials, interior design and equipment (home automation, climate control, made-to-measure joinery). We give you a fixed, detailed quote after the technical visit.

Do you work with interior designers and with my architect?

Yes. We work alongside your interior designer or architect, or suggest ours. We coordinate project, specification and execution with a single site manager so the result is exactly what was designed.

What does your fixed quote include?

Everything, item by item: labour of every trade, materials, waste management, protection of communal areas, site-manager coordination and the final clean. What you sign is what you pay.

Do you work in old and protected buildings in Barcelona?

Yes. In Barcelona we renovate modernista and listed buildings in the Eixample and Ciutat Vella: we restore the elements of value and, when the façade or communal elements have to be touched, we handle the heritage authorisation with the council.

Free quote

Get your luxury renovation quote in Barcelona

A private survey, a discretion protocol and a committed programme. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →