Luxury renovations in Castelldefels: interior design, high-specification materials, home automation and precision climate control for seafront homes and detached houses with gardens. With a single site manager, a fixed quote and the utmost discretion.
A high-end renovation in Castelldefels looks after every detail: interior design, fine materials (natural stone, timber, microcement), made-to-measure joinery, technical lighting, home automation and precision climate control. In Castelldefels we work on seafront homes and detached houses with gardens, where finish and coordination of trades make the difference.
We work with interior designers and with a single site manager, with a fixed quote item by item and utmost confidentiality. We handle permits and technical supervision with chartered professionals and a written guarantee on the work.

Per square metre of floor area, VAT excluded. The design fee is separate where we commission it.
| Specification | What it covers | Per m² (excl. VAT) | |
|---|---|---|---|
| High specification | Standard finishes, practical solution | 1,500 – 2,200 €/m² | |
| Designer scheme | Selected materials, best balance | 2,200 – 3,000 €/m² | |
| Fully bespoke | Premium materials and high-end interior design | From 3,000 €/m² |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges for a complete high-end renovation, VAT excluded.
A fully designed interior, integrated control and good materials in a high-specification flat.
Several en-suites, a designed kitchen, architectural lighting and bespoke joinery throughout.
Wellness, home cinema and the top of the finish range. The figure comes out of the design, and quoting one before that would be fiction.
A full interior design scheme taken on as a service in its own right. We coordinate its execution either way.
In a protected or period building, what you are allowed to do constrains the design before the budget does — catalogued façades, original floors that must be retained, lift shafts that cannot move. We establish those limits at the survey, because discovering them after the scheme is drawn is the most expensive sequence there is.
What a turnkey high-end renovation covers, and what is genuinely separate.
VAT is shown as its own line — 10% or 21% depending on the property and who is invoiced. On a high-end job the materials share often pushes the work past the 40% threshold that the reduced rate depends on, so we assess it explicitly rather than assuming the lower rate and correcting later.
The same team and the same fixed quote, for the rest of the home in Castelldefels.
Each city has its own housing stock, its own buildings and its own permits.
One team for the whole job, in Barcelona and across Catalonia.
Luxury renovations in Castelldefels: what you ask us most.
A high-specification renovation usually starts from 1,200 €/m² and rises with materials, interior design and equipment (home automation, climate control, made-to-measure joinery). We give you a fixed, detailed quote after the technical visit.
Yes. We work alongside your interior designer or architect, or suggest ours. We coordinate project, specification and execution with a single site manager so the result is exactly what was designed.
Everything, item by item: labour of every trade, materials, waste management, protection of communal areas, site-manager coordination and the final clean. What you sign is what you pay.
Yes. We connect the living room or kitchen with the garden or terrace, use salt-resistant finishes and, if you wish, renew the exterior (paving, lighting, swimming pool).
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →A private survey, a discretion protocol and a committed programme. We reply within 24 hours.