Renovations · Barcelona

Top-floor flat renovations in Barcelona

We renovate top-floor flats and penthouses in Barcelona: interior, terrace and roof, with waterproofing, insulation and finishes designed to make the most of the views and the light. A fixed quote in writing.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Top-floor flat renovation

Renovating a top-floor flat in Barcelona.

A top-floor flat has enormous potential and its own challenges: waterproofing and insulating the roof, terrace access, controlling sun and heat. We renovate the interior and work on the terrace to integrate it with the living room. In Barcelona, this is especially enjoyed because of Eixample flats, homes from the ’60s and ’70s and buildings with specific requirements.

We coordinate interior and exterior with a single site manager and a fixed quote. We check roof and structure before starting and, when a licence is needed because the roof or volume is touched, we handle it with chartered professionals.

Living room of an Eixample flat at work in progress, with plasterboard false ceiling and recessed spotlights, a stepladder and the window leading outside
Prices

What a top-floor flat renovation costs.

Per square metre of interior floor area, VAT excluded. The terrace and roof are quoted separately.

What a top-floor flat renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversPer m² (excl. VAT)
FunctionalStandard finishes, practical solution600 – 850 €/m²
High specificationPremium materials and high-end interior design1,300 – 2,100 €/m²
Indicative prices · VAT not included. The terrace and roof are the line to look at. Waterproofing, paving, a pergola and the terrace services are quoted separately from the interior, because they vary enormously with the size of the terrace and the condition of the roof. Everything is itemised, so you can see what the outdoor space costs.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate48,000 – 68,000 €Functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of flat.

Indicative ranges for a full interior renovation, VAT excluded.

Small top-floor flatUp to 70 m²42,000 – 85,000 €

Compact flats with a terrace. Ceiling insulation and waterproofing weigh heavily in the total.

Medium top-floor flat70 – 110 m²65,000 – 130,000 €

The most common size. A living room opening onto the terrace, a kitchen, one or two bathrooms and a new layout.

Large top-floor flatOver 110 m²From 90,000 €

A lot of interior floor area and often a wraparound terrace. The outdoor finish makes the difference.

Terrace and roofWaterproofing + pavingFrom 8,000 €

Waterproofing, outdoor paving, a pergola and the terrace services, quoted separately.

Two things can change these figures. Who owns the roof: a top-floor flat’s terrace is often common property for the owner’s private use, in which case the building may be responsible for the waterproofing and you pay for the finish. And access: materials for a terrace go up in a lift or by hand, which on a big terrace is real money.

No small print

What is included and what is not.

The scope of a turnkey top-floor flat renovation, and what normally sits outside it.

✓ Included in the price

  • Roof and terrace diagnosis
  • Ceiling insulation
  • Strip-out and clearance
  • New plumbing and drainage
  • Electrics with certificate
  • Air conditioning sized for the flat
  • New layout, flooring, kitchen and bathrooms
  • Joinery, painting and finishes
  • A written warranty, including on the waterproofing

✕ Not included — quoted separately

  • Terrace waterproofing, paving and pergola, quoted separately unless itemised
  • Appliances, except those itemised in your quote
  • Loose furniture and decoration
  • Roof repairs that belong to the building
  • Council taxes and fees
  • Hot tubs, large planters and other heavy loads, which need the structure checked

VAT is shown as its own line — 10% or 21% depending on your case. Check with your administrator whether the roof and terrace are the building’s responsibility before you commission any waterproofing, because it can save you the cost.

In the same town

Other services in Barcelona

The same team and the same fixed quote, for the rest of the home in Barcelona.

Common questions

Frequently asked questions

Top-floor flat renovations in Barcelona: what you ask us most.

Can you renovate the terrace and roof of a top-floor flat?

Yes. We waterproof and insulate the roof, renew the terrace paving, improve drainage and, if you want, integrate the terrace with the living room. We check the structure before starting and it is fixed in the quote.

Do I need a licence to renovate a top-floor flat?

It depends on the work. Interior work usually goes by notification; touching the roof, volume or façade may need a major-works licence. We check it on the technical visit and handle whatever applies.

What does your fixed quote include?

Everything, item by item: labour of every trade, materials, waste management, protection of communal areas, site-manager coordination and the final clean. What you sign is what you pay.

Do you work in old and protected buildings in Barcelona?

Yes. In Barcelona we renovate modernista and listed buildings in the Eixample and Ciutat Vella: we restore the elements of value and, when the façade or communal elements have to be touched, we handle the heritage authorisation with the council.

Free quote

Get your top-floor flat renovation quote in Barcelona

Free survey of the flat, the terrace and the roof anywhere in Catalonia. Terrace and roof quoted separately.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →