Renovating shops and offices in Cerdanyola del Vallès: fit-out, services, accessibility and the activity procedure with the Ajuntament. And when a change of use to housing does not work.
Opening a business in Cerdanyola starts with a question that tends to be asked late: what activity fits that unit. A unit in the Centre or on the ground floors of Serraparera and Fontetes is not equally good for everything, and what you want to set up (shop, clinic, office, bar) decides the works, not the other way round. That is why the first visit is for checking the unit’s use, floor area, clear height and the services it already has, before a single partition is drawn.
The activity is processed with the Ajuntament. Depending on what you set up, it will be an activity notification (comunicat d’activitat) or an activity licence with a technical project signed by a registered professional. We prepare it with our technicians and file it, but the Ajuntament is the one that decides, and we do not control its timescales. What we do is not start spending on finishes until we know which procedure applies to you, because works carried out for an activity that is later not authorised are money lost.
The works themselves are always the same list, and it pays to close it item by item: consumer unit and electrical certificate sized for the power the business will draw, air conditioning with its condensate drain, ventilation, lighting, flooring and a suspended ceiling. If the unit faces the street, the entrance has to be usable by everyone, with a ramp or the level difference resolved. Near the UAB, many units are renovated quickly and for a specific use; there the calendar presses harder than the budget.
If yours is hospitality, smoke extraction rules. A kitchen with burners needs a duct that rises above the roof, and in a block of flats that depends on the community and on the building itself. If there is no shaft and the outlet is not authorised, the honest conversation is a different one: a kitchen without fumes, a plancha under a filtering hood or finding another unit. We would rather tell you at the visit than after you have signed the lease.

Per square metre of floor area, VAT excluded. The activity project is separate.
| Specification | What it covers | Per m² (excl. VAT) | |
|---|---|---|---|
| Basic fit-out | Standard finishes, practical solution | 300 – 600 €/m² | |
| Mid-range | Selected materials, best balance | 600 – 1,000 €/m² | |
| Turnkey / designer | Premium materials and high-end interior design | 1,000 – 1,800 €/m² |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges for the works, VAT and the licence process excluded.
Neighbourhood shops and small offices. Accessibility and services set the minimum.
The most common size. Depends heavily on the activity and the starting condition.
Large commercial spaces, with larger services, air conditioning and fire protection.
The project and technical supervision for the activity licence, quoted separately.
The figure that is hardest to promise is the one you most want: the date the licence arrives. It is set by the council, not by us. We build the programme so that the building work finishes as the licence is due, and we say honestly if the council’s timing looks likely to be the constraint.
The scope of a turnkey fit-out, and what is separate.
VAT is shown as its own line — normally 21% on works for a business. Check your lease before you commit: it often says who pays for what at the end of the term, and what the landlord must approve.
The same team and the same fixed quote, for the rest of the home in Cerdanyola del Vallès.
Each city has its own housing stock, its own buildings and its own permits.
One team for the whole job, in Barcelona and across Catalonia.
Shop and office renovations in Cerdanyola del Vallès: what you really ask us.
We do not give a catalogue figure, because two units of the same size can differ greatly: it depends on the electrical installation already there, on whether the façade has to be opened or accessibility resolved, on the air conditioning and on whether it is hospitality with smoke extraction. After the technical visit we give you a quote fixed and itemised, so you see which part is services and which is finishes.
Yes. An office calls for less paperwork than a bar, but the works have their catch: network and electrical cabling per workstation, air conditioning that does not roar over the desks, lighting without glare, raised floor or trunking and, if there are clients, an accessible toilet. We fit it to the use you will give it and to the activity regulations, which the Ajuntament reviews just as it does for a shop.
It depends on the activity. The lower-impact ones usually go by activity notification and the higher-risk ones, or those with significant capacity and noise, by licence with a technical project. We do not decide that classification: the Ajuntament sets it according to what you are going to do. At the visit we tell you what is most likely and prepare the documentation; the resolution and its timescales do not depend on us.
It depends on the works and on the activity. An interior fit-out that does not touch the structure can go by prior works notification; the activity has its own procedure, and opening to the public without it resolved is what can cost you a fine. That is why we put things in order at the start: what can begin now, what waits for the procedure and what is not worth spending on until the Ajuntament replies.
Sometimes, and we do not promise it without looking. It depends on the municipal planning (which sometimes does not allow housing on the ground floor in certain areas) and on the unit meeting the minimum habitability standards: height, ventilation, natural light, floor area and access. Before buying or renovating, it is worth consulting the Ajuntament. At the visit we review the physical side and tell you frankly whether it has a chance.
There are units where no fix is possible: no window onto the street or a courtyard, little clear height, or on a floor the planning does not accept as housing. Then the option is to keep it as a unit and make the most of it: an office, studio, clinic or storeroom. We say so plainly before you pay for a project, because a change of use that is not granted cannot be fixed with more works.
In a unit open to the public, normally yes: a wide enough door, no steps at the entrance or a ramp, and a usable toilet where the activity requires it. In units with a step at the entrance it is one of the first things we look at, because it is better solved at the start than with the works finished. The specifics are set by the activity project.
Yes, in the Centre, Serraparera, Fontetes, Banús and the areas near the UAB, and in Bellaterra too. Each area has its own rhythm: on narrow streets in the Centre, the skip may need a permit to occupy the public highway, which we handle. The technical visit is there to confirm it unit by unit.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey, including before you sign the lease. A fixed quote and a written handover date.