New entrance stairs and a stair lift in Badalona
Carrer del Mar, Badalona · 20 m² · 2026

Project details
- Floor area
- 20 m²
- Property type
- Commercial unit
- Duration
- 3 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 7,700–8,500 €
- What we did
- Demolition of the steps · Marble steps · Access ramp · Stair lift · Glass balustrade
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
An entrance hall that was shutting neighbours out halfway up the stairs: new marble steps, a ramp and a stair lift, with the entrance in use throughout the works.
The steps of the entrance hall were worn down to the stone and the building needed to solve accessibility without waiting for a complete restoration. The steps were demolished one by one down to the base and formed again in beige marble, to match the hall’s existing skirting.
On the entrance flight a ramp was added and a folding stair lift installed, which takes up almost no room when folded and, unfolded, covers the whole height difference up to the lift. The balustrade was done in glass so as not to darken an entrance that was already narrow.
Everything was done with the entrance in use: a route protected with tape and boards, work in sections and the neighbours coming and going every day. It is a small job in square metres and a big one in what it changes: there are people who can now leave the house on their own.
Building maintenance in the centre of Badalona includes jobs like this: entrances that shut older neighbours in. If your community has one, it can be fixed without closing the entrance.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.