How to choose materials for your renovation: a room-by-room guide
Walking into a building materials showroom feels a bit like getting lost in a maze without a map. Endless rows of tiles that look identical at first glance, catalogues of timber with names you never knew existed, and a range of paints that goes far beyond traditional whites. With so much choice, it is natural to feel unsure and to worry that a wrong decision will spoil the look of your home or your budget. But there is no need to panic.
The key to a successful flat renovation is not simply choosing whatever catches your eye on social media or under the spotlights of a big design store. What a good specialist does is work out what each room technically needs, based on how it is used every day and how much wear it will take. A material that works well in a living room can be a real disaster in a wet area, or in a hallway that takes a constant stream of footfall from the street.
This is a room-by-room guide. It skips the impossible technical jargon and gives you practical criteria you can use. By the end, you will know which questions to ask your renovation company, what to check before signing any quote, and how to balance design against the durability of each surface. Make a coffee, grab a pen and paper, and let's start planning your new home.
Key points to get right:
- Looks versus durability: Never choose a material on appearance alone. Always check its porosity, hardness and long-term upkeep.
- Technical sequencing: To make sure each material goes in at the right stage of the works, it is worth reading our guide to how to organise a full renovation step by step first.
- Budget wisely: Put more of your budget into materials that are hard to replace later, such as pipework, the general floor or the shower tray of a built-in shower.
Living and dining room: thermal, acoustic and visual comfort
The living-dining room is the real heart of family life, a multi-purpose space where you unwind after a long day, play with the children or share memorable dinners with friends. For this reason, material choices here should focus first on thermal comfort, a warm feel underfoot and surfaces that are easy to clean where they are touched most.
Homeowners often ask which type of flooring to install. Natural wood adds an organic warmth and a very comfortable feel underfoot, but it is delicate and can scratch easily under pets' claws or children's games. Porcelain tile, by contrast, is almost indestructible, although it can feel cold and unwelcoming in winter. To help you decide, read our detailed comparison of which floor to choose: porcelain, parquet, microcement and vinyl, since the result will strongly shape the visual character of the room. If you are planning a living and dining room renovation in Barcelona, note that wood-effect porcelain floors combined with radiant heating are one of the solutions people choose most often today.
But the living room is more than its floor. Walls matter a great deal for how a room feels and sounds. Avoid finishes that reflect too much light in rooms with large windows, as they can cause uncomfortable glare during the day. Instead, choose matt emulsion paints with excellent washability, or plaster finishes with very subtle textures that absorb some of the ambient noise. And if you have noisy neighbours, consider fitting an acoustic plasterboard lining wall filled with rock wool on the shared wall, for peace of mind.
The kitchen: coping with grease, heat and constant knocks
Going into the kitchen means stepping into the most demanding workshop in the house. Here materials face relentless daily use. Hot oil splashes, acidic ingredients such as lemon or tomato stain porous surfaces, and pans come straight off the hob and get put down at very high temperatures. For that reason, the top criterion in the kitchen should not be fashion, but pure, hard-wearing technical performance.
Let's talk about the star of the show: the worktop. Granite traditionally dominated Spanish kitchens, but chemical innovation now offers spectacular alternatives. Compact quartz surfaces such as Silestone come in a huge range of colours, but remember that their resin content makes them vulnerable to extreme heat, for example a hot pan put down directly from the hob. By contrast, the latest ultra-compact porcelain surfaces such as Dekton resist stains, scratches and thermal shock without any trouble. It is worth comparing the options in this reference article on which kitchen worktop to choose: Silestone, Dekton, granite or porcelain so you can decide with confidence.
When it comes to furniture and floors, water resistance is vital against any accidental leak from the dishwasher. Interior cabinet panels should have properly sealed edges so that condensation damp does not swell them over time. For floors and splashbacks, large-format ceramic tiles reduce the number of grout lines, which makes cleaning quick and daily upkeep easy without scrubbing too hard. For a clear breakdown of cost and quality, see kitchen renovation materials: worktops, wall tiles and floors compared, with prices to fine-tune your choices without overshooting your original budget.
The bathroom: a watertight box designed against damp and leaks
If the kitchen is demanding, the bathroom is quite literally the battleground of condensation damp and direct water. One small oversight, or a poorly installed underground waterproofing membrane, can lead to serious leaks into the flats below, or to mould growing on your own walls within a few months.
So the first technical priority in any high-quality bathroom is what you cannot see. This means preparing the surfaces properly and applying a correct waterproofing system for a bathroom renovation that prevents any leak at the critical points of the shower or bath. Once the invisible watertightness of the floor and walls is secured, it is time to choose the finishing materials. Here, white-body stoneware and porcelain tiles are again the undisputed winners, thanks to their almost zero porosity. When you select them, make sure the shower floor has a suitable slip-resistance rating of class 2 or class 3, to avoid dangerous slips when wet.
To work out every line of the budget with precision, see this useful guide to a complete guide to bathroom renovation prices, materials and timescales in Barcelona, which shows which taps and toilets offer the best value for money. As for taps, chrome-plated brass is still the most durable option against limescale, although new brushed finishes with a PVD coating are gaining ground fast in 2026 because of their extreme resistance to household cleaning products.
Bedrooms: your place for rest and peace of mind
The bedroom is the sacred space where your body recovers every night, a place where quiet and a warm atmosphere are essential. Unlike the busy areas of the house, here soft-to-the-touch materials with low thermal conductivity take centre stage in supporting restful, healthy sleep.
On bedroom walls, avoid at all costs low-quality paints that can release harmful volatile organic compounds over time. Mineral-based or ecological paints are a better choice, as they keep the air free from toxins while you sleep. You can explore the options further in this article on types of paint for your home, to choose the one that best protects your family's health.
Insulation against outside noise is also crucial if the bedroom is to be a real place of relaxation. If you live on a busy street, the best mattress on the market will not help if traffic noise keeps interrupting your deep sleep. Do not hesitate to put part of your budget into thermal and acoustic insulation in renovations: materials and where to fit them, with well-designed plasterboard lining walls and high-quality external window frames.
Hallways, passageways and outdoor areas: durability against daily wear
Hallways, entrance halls and balconies are often overlooked when planning, treated as secondary spaces of lower decorative value. Yet hallways and entrance halls are the heavy-traffic routes of your home. Suitcases roll through them, heavy wheeled toys get dragged along them, and wet coats and muddy shoes come in straight from the street.
In these high-traffic areas you need materials that are easy to maintain and very hard-wearing. Satin paints with high washability, or wall coverings to half height (such as vinyl wallpaper or lacquered wood panels), will protect corners from everyday knocks. Outdoor terraces and balconies, on the other hand, need exterior flooring that can withstand frost and direct sun without fading, with a rough, anti-slip finish to prevent unnecessary falls when it suddenly starts to rain.
Comparison table: performance and costs of materials
Below is a detailed comparison table that summarises the best materials for each room, along with the priorities to insist on and what to rule out entirely.
| Room | Recommended material | Critical priority | Material to avoid | Maintenance | Cost range |
|---|---|---|---|---|---|
| Living room | Natural or laminate AC5 floating parquet, high quality. | Thermal warmth and a comfortable feel underfoot. | Low-quality large-format porcelain without underfloor heating. | Medium to low (regular cleaning and care with knocks). | Medium / High |
| Kitchen | Ultra-compact porcelain worktop and large-format wall tile. | No porosity against acid stains and thermal shock. | Untreated woods or very porous marbles. | Very low (easy cleaning with a damp cloth). | High |
| Bathroom | Anti-slip porcelain stoneware and brass taps. | Resistance to direct water and steam, and total watertightness. | Standard plastic paints in exposed shower areas. | Low (resistance to mould and chemical agents). | Medium |
| Bedroom | Natural wood parquet and ecological mineral paint. | Acoustic insulation, softness to the touch and low VOC emissions. | Cold, highly conductive ceramic floors without rugs. | Medium (avoid excess moisture in wood). | Low / Medium |
| Outdoors | Thick anti-slip R11 porcelain for exterior use. | Resistance to frost and UV rays, with a firm anti-slip grip. | Untreated interior parquet and thin resin floors. | Very low (withstands the weather without losing its tone). | Medium |
Frequently asked questions about renovation materials
Can microcement be used throughout the home, including bathrooms and kitchens?
Yes, absolutely. It is extremely versatile. Find out the key points in what microcement is and where it is used. With no awkward physical joints, it is very easy to clean. But be careful: a shower needs a waterproof seal, and it must always be carried out by a highly qualified fitter.
Which type of windows give the best insulation and cut energy use?
PVC frames with Climalit glazing are the most effective option. You will find the technical details in windows for your renovation. The frame stops cold air very effectively, which noticeably cuts the energy your heat pump uses, in every season, in a sustainable way.
How does the choice of materials affect the final budget?
Materials account for forty per cent of the total cost of the renovation. Premium finishes push that figure up. It is worth combining high-quality porcelain in the central, high-traffic areas with standard washable melamine for cupboards or the larder in your home.
When is it possible to change a floor without lifting the existing one?
It is entirely possible if the existing floor is perfectly solid, flat and dry. When these essential technical conditions are met, you can save budget by using click-fit vinyl flooring or ceramic tiles laid over the existing floor. Find all the details in replacing a floor without building work in Barcelona, for a clean, fast renovation without the noise of rubble removal.
The choice of renovation materials is where most of the result, and the budget, is decided. This guide takes it room by room, so you choose with judgement rather than from a catalogue.
Keep reading
Architect fees for a renovation: how much the project costs
What an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Full renovationsUrgent damp and leak repair in your home: what to do first
Urgent guide to fixing leaks, damp and water stains at home for good. Diagnosis, what to do first, typical costs and solutions for 2026.
Full renovationsITE and 60s-70s buildings: aluminosis and structural reinforcement
How the building inspection (ITE) spots aluminosis and other defects in 60s and 70s buildings, and the modern structural reinforcement options.

