Guides and advice

Thermal and acoustic insulation in a renovation: materials and where to fit them

By the Tu Nuevo Piso teamPublished 21 July 202612 min read

Picture the scene. You move into a flat after a stunning renovation: a magazine-style open kitchen, warm wooden floors, soft indirect lighting and designer tiles in the bathrooms. Everything looks perfect. Then winter arrives, you switch on the heating, and half an hour after you turn it off the flat is freezing again. Or worse, you go to bed and can hear the neighbour's TV and conversations as if they were in your own bedroom. Not what you had in mind. This happens far too often, because when people plan a renovation they tend to focus on what catches the eye and forget the invisible shell of the home.

Spending money on thermal and acoustic insulation is not a whim. It is the foundation of how comfortable your home will be for years. Good insulation stops condensation damp in one go, cuts your energy bills sharply and gives you real peace and quiet from street and neighbour noise. If you are about to renovate your home, keep reading. We look at the materials that work, the systems professionals use and the key areas to tackle if you want a truly different result.

🔑 Key points to know before you start:

  • Two benefits in one: A good mineral-based insulation material noticeably dampens airborne noise and slows heat loss through the outside walls at the same time.
  • Floor space: If you build new internal lining walls (trasdosados), you will lose a few centimetres of usable floor space. In daily comfort, you will get far more back.
  • Why certification matters: Insulating your outside walls well directly improves the rating on your energy certificate. It also helps you understand what the energy certificate is for in a renovation and how to improve it, which matters when you sell or apply for grants.
  • Watch the weak spots: A perfectly insulated wall counts for little if the window frames and their seal to the façade are poor.

1. Why insulation should be tackled during the renovation

Insulating a home while you are still living in it is a real nightmare of dust, noise and mess. The ideal moment is a full renovation. When the walls are open, the false ceilings are down and the old floors have been lifted, fitting insulation panels or injecting foam is quick, clean and much cheaper for the installers.

Building regulations matter too. Spain's current building rules set strict thermal requirements. To understand these legal obligations and how they affect home renovations, it is worth reading our explanation of what the Technical Building Code (CTE) is, a regulation that protects the sustainability of buildings and strictly limits the maximum energy use allowed.

But beyond fines and paperwork, the real benefit shows up in your bank account and in your daily comfort. A badly insulated building loses heat constantly in winter and takes in a lot of heat in summer, so your heating and air conditioning have to work flat out all day. With a continuous, well-planned insulated shell, your energy demand can fall by amounts that often exceed 40% of usual consumption.

2. The materials used on site: which one to choose?

No single material solves every insulation problem in your home. Each room, each building system and each budget needs its own solution. Modern insulation is usually grouped into three main families, according to where it comes from, its mechanical properties and its ability to absorb sound:

Mineral insulation and thermal wools

The undisputed favourites in most interior renovations are rock wool and glass wool. They are very versatile, light and flexible, and they fit neatly into any gap or metal stud in the structure. Their porous, fibrous texture makes them excellent at stopping heat loss, and they also trap the sound waves trying to pass through the wall, absorbing that energy very effectively. They are also fully non-combustible, an extra safety factor that is always worth considering when you renew a home completely.

Synthetic and cellular plastic materials

This group includes extruded polystyrene (XPS) and expanded polystyrene (EPS). XPS is a dense rigid foam with outstanding resistance to moisture and heavy loads. It is the ideal material for insulating under a floor finish, on roofs where water collects, and for wrapping pillars and beams that face outdoors to prevent thermal bridges. Sprayed polyurethane foam, meanwhile, is easy to apply on irregular surfaces and seals any small air gap, although its acoustic performance is usually lower than that of porous mineral wools.

Ecological and natural insulation

For anyone fully committed to sustainable building materials, the industry now offers some impressive eco-friendly options. Natural cork boards, pressed wood fibre, recycled cotton blankets and cellulose blown into cavities all provide excellent thermal insulation. Their final cost is often higher than that of traditional plastic-based products. But their low environmental impact, breathability and complete lack of toxic volatile compounds make them popular choices for healthy homes and modern eco-builds.

📊 Comparison table of insulation materials:

MaterialOriginThermalAcousticMoisture resistanceTypical use
Rock woolMineral (basalt rock)ExcellentExcellentMediumPlasterboard lining walls, false ceilings and partition walls.
Extruded polystyrene (XPS)Synthetic (plastic)ExcellentVery lowExcellentFloors, terraces, external façades and cold pillars.
Natural corkPlant-based (cork oak bark)ExcellentExcellentExcellentExposed interior walls, under floors or ecological insulation.
Copopren (polyurethane)Recycled syntheticMediumExcellentMediumParty walls with noisy neighbours.
Blown celluloseRecycled (paper and cardboard)ExcellentExcellentLowBlown into empty air cavities, without major building work.

3. Where to fit insulation in your home during the renovation?

To turn a renovation into a proper fortress of thermal comfort and acoustic calm, the key is a continuous protection strategy across the whole home. Find and treat every route through which cold and noise get in. Leave no loose ends and plan your critical areas carefully:

External façade walls

These walls separate you from the street and are your first barrier against outside temperature. In urban apartment blocks there are two main ways to improve them significantly. The first, widely regarded as the most efficient, is to work on the outside of the building. This is done with the system described in our guide to what SATE (External Thermal Insulation Composite System) is. It is ideal because it takes no floor space from inside the home and removes thermal bridges at source. If the owners' community does not approve insulating the whole façade, you will have to work from inside the flat instead: building freestanding plasterboard lining walls filled with dense mineral wool, or blowing insulation into the air cavity.

Partition walls and party walls with neighbours

Noise from next door is the real nightmare: barking dogs, washing machines at night, crying babies, endless footsteps. When you plan the layout of your internal partition walls, the key decision is usually which traditional or modern method to choose. Review the technical and weight differences in our comparison of plasterboard vs brick partition walls. It shows clearly how a plasterboard partition with a high-density rock wool core absorbs airborne sound far better than a solid ceramic brick wall. The brick wall acts as a bridge for vibration and carries the noise through the whole structure.

Interior ceilings and false ceilings

Insulating a ceiling matters whether you live on the top floor and suffer the summer sun through the roof, or your neighbours upstairs are especially noisy with their music or footsteps. A false ceiling hung on mechanical anti-vibration mounts (silentblocks), so that it does not pass vibration to the structure, and filled with glass wool or rock wool will sharply reduce the impact noise coming through the floor slab above. Do not skimp on quality here if you want to protect your sleep.

Floors

Cold rises easily from shops on the ground floor, damp entrance halls or unheated car parks directly below. When you lift the floor finish during a full renovation, it is the right moment to lay elastic sheets of high-density extruded polystyrene or natural cork boards. This does not only stop heat rising from below. It also gives an ideal base for efficient water-based heating, a combination you can learn to design by reading about what underfloor heating is and how it spreads heat evenly across the whole room.

Windows and glazing

Your walls can be perfect against the cold, but if you have old windows with poor frames that let draughts in, much of the money you have spent will be wasted. In a renovation, fitting modern windows with a thermal break and good glazing is essential. High-end PVC or aluminium frames should include profiles that break the metal contact between the street and the home. Find out in detail what a thermal break (RPT) is and pair it with glazing that has a dried air cavity. Our technical guide on what Climalit glass is explains the double and triple glazed options.

4. How to coordinate insulation work on site?

Installing thermal and acoustic insulation properly requires a precise and disciplined sequence. There is no point buying the best material on the market if the bricklayers or the electrical fitters make serious mistakes during installation that leave gaps where the system loses performance.

First of all, if you want to avoid headaches during the works, it is vital to plan the logical order of tasks. Our practical article on how to organise a full renovation step by step: order of work and phases explains exactly when insulation fitters come in, during demolition and partition removal.

Homeowners often also think about replacing the boiler and air conditioning units. There is no sense in oversizing your climate control equipment if your home keeps losing heat through poor walls. In fact, the best thermal combination for a well-insulated home is modern heating and cooling equipment that draws free energy from the ambient air. You can learn about this sustainable technology in our detailed article on what aerothermal heating is, an ideal system for getting the most from your investment in an efficient building envelope.

5. Serious mistakes when insulating a renovation and how to avoid them

Unfortunately, the residential renovation sector is full of bad practice that undermines efforts to make a home thermally comfortable and quiet. To avoid unpleasant surprises when you see the heating bill or hear the neighbours through the wall, read our guide to common renovation mistakes and how to avoid them. Below are some of the most serious technical slip-ups to watch closely while the work is going on:

  • Leaving gaps in the metal profiles of the plasterboard: Some workers in a hurry put rock wool in only between the metal studs and forget to fill the inside of the steel profile of the self-supporting structure. This creates a direct vertical path for sound to travel through.
  • Not overlapping insulation blankets at the joints: If there are gaps between boards of extruded polystyrene or mineral wool, cold air and sound waves will find an easy escape route, cutting a large share of the wall's effectiveness.
  • Forgetting the shutter boxes: This is a very frequent oversight in renovations. You spend thousands of euros on high-end windows with thermal breaks, then completely neglect to insulate the roller shutter box, which turns into a giant sieve for cold outside air and traffic noise.
  • Breaking the acoustic lining with sockets and fittings: Cutting holes in the plasterboard to recess electrical fittings breaks the airtightness and the sealed effect of the acoustic wall. Workers must use specific soundproofed socket boxes that prevent sound leaking through.

The cost of these insulation systems is a key factor when you work out the overall budget for a full renovation. If you want a realistic idea of the approximate cost per square metre of each of these items in real homes, see our guide to how much it costs to renovate a flat in Barcelona: price per m2 and quality levels, which gives average market rates to help you make informed decisions.

6. Summary and final expert recommendations

To conclude this guide, nothing is more comforting than coming home after a stressful day, closing the door and enjoying total silence, with an ideal temperature and a very low electricity bill. Achieving this takes no magic. It takes sensible technical decisions during your renovation. Thermal and acoustic insulation is not a decorative extra you can drop at the first sign of a tight budget. It is one of the most sensible long-term decisions you can make for your health, the value of your property and your everyday wellbeing.

7. Frequently asked questions about insulation in renovations

Is it better to insulate the inside or the outside of the home?

Where the owners' community allows it, insulating from the outside is technically far superior. It removes thermal bridges at floor-slab edges and pillars and avoids losing usable floor space inside the flat. If this is not possible because of aesthetic rules or a lack of agreement between neighbours, a freestanding internal lining wall with rock wool and plasterboard is the most efficient, clean and simple option to fit during the renovation.

What thickness of insulation is recommended for external walls?

To comply comfortably with the requirements of the Technical Building Code (CTE) in temperate or Mediterranean zones, a minimum of 6 to 8 centimetres is recommended for materials such as rock wool or extruded polystyrene. In mountain areas or places with very harsh winters, the ideal thickness rises considerably, to between 10 and 14 centimetres of insulation. That gives optimal thermal performance, avoids unpleasant condensation and keeps your heating and air conditioning energy use to a minimum.

How do I stop the noise from the flat upstairs?

Impact noise from heels or dragged furniture is best stopped at source, by fitting an acoustic impact sheet under the floor of the flat above. If you cannot work in the flat upstairs, the only viable technical solution in your own home is a suspended acoustic false ceiling. Hang it on mechanical silentblocks, fill it with high-density mineral wool and close it with two plasterboard sheets with viscoelastic acoustic membranes sandwiched between them.

How much of a renovation budget goes on insulation?

As a rule, substantially improving the thermal and acoustic insulation of façade walls, partition walls and false ceilings usually accounts for between 8% and 15% of the total cost of a home renovation. It may look like a secondary item or an expendable cost at first sight. But it is one of the most profitable investments in the job, because it can pay for itself fairly quickly through energy savings that exceed 40% of your annual heating and air conditioning bills.

🔍 Articles you may find useful:

Which thermal insulation should you choose for a renovation?

The best thermal insulation for renovations is the one that tackles your real weak point: internal lining walls with mineral wool on external walls, insulation under the roof if you live on the top floor, and window frames with a thermal break. In a renovation that is already open, insulation costs a fraction of what it saves every winter.

Keep reading

✆ Call✦ WhatsAppGet a quote →