Guides and advice

When is the best time of year to renovate your flat?

By the Tu Nuevo Piso teamPublished 27 July 20268 min read

Key points to know

  • Plan ahead: Do not improvise. Ask for quotes at least three months in advance.
  • Spring and autumn: They offer the best balance of weather for drying heavy materials.
  • Watch out for August: Spain's construction sector almost completely stops for the summer holidays.
  • Winter savings: Winter brings better availability of the best crews and more competitive offers.
  • Paperwork does not take a holiday: Getting the right licences takes time at the town hall.

Deciding to transform your home is an exciting step, one that can make a real difference to your wellbeing and your quality of life. But let's be realistic: starting building work at home also raises a lot of questions. Where do I begin? Who do I sign with? And the one that is often overlooked until it is too late: when is the best time of year to start a full renovation or a partial one?

Choosing the right weeks is not a matter of whim or the occupant's convenience. The date you pick directly affects the final cost of your renovation, whether the timings agreed with the builder are met, and how long materials need to dry or set properly without cracking from sudden frost or harsh summer heat.

Spring: the golden season for renovations

For most architects, interior designers and site managers, spring is the top season for building work. And not for romantic reasons. It is simply practical. From March to June, outdoor temperatures are mild, which is ideal for speeding up the drying of fillers, plasters and paint without drying them out too fast, as happens under the scorching July sun.

There is more. In these months you have more usable daylight each day, so the crews can make the most of the working day without relying so much on temporary lights. Moderate humidity also makes it easy to throw the windows wide open, airing the flat and clearing the smell of lacquers and solvents quickly.

The one real snag is that almost everyone has the same idea at the same time. As a result, demand for reliable professionals shoots up. If you want to start a large job in April, you had better have signed the contract and settled the project details in January or February. If you leave it too late, you will have to make do with the few firms still free, which do not always offer the same guarantees.

Summer: the holiday favourite with a catch

Summer is the traditional favourite, for purely practical and family reasons. With holidays, it is much easier to pack up your belongings and move out for a while, so you avoid the daily stress of dust and noise. Many people wonder whether you can live at home during a renovation, and what to consider, and the expert advice is almost unanimous: if you can leave for a few days, your physical and mental health will thank you.

But beware, summer has a huge trap called August. In Spain, the construction sector and the logistics warehouses take an almost nationwide holiday break. A minor supply delay at the end of July can leave your job stalled for three weeks, with the cost and headaches that brings.

And let's not forget extreme temperatures. Stifling summer heat dries out mortar and concrete too quickly. When the water in the mix evaporates too early, the material loses its structural strength and unwanted cracks appear. If you are going to upgrade the building envelope to keep the heat out, choosing good windows for your renovation: PVC or aluminium, and double or triple glazing is a priority this season.

Autumn: the perfect balance of weather and pace

Often unfairly overlooked, autumn is the best-kept secret for interior renovations across Spain. Suppliers are back with their stock fully restocked after the holidays, factories are running at full capacity, and distributors are delivering orders again without administrative bottlenecks.

In terms of weather, temperatures are still very pleasant. Painters can work with the windows fully open without frost or extreme heat. Damp materials still dry quickly, which matters if you are considering thermal and acoustic insulation in your renovation: materials and where to fit them to protect your home from noise and from temperature extremes in the months ahead.

Another advantage is that autumn lets you finish the home completely before the Christmas holidays. Imagine starting work in September and having Christmas Eve dinner in your newly renovated living room. But remember: to start knocking walls down in September, you need to apply for permits at the town hall before the council's summer slowdown in July.

Winter: the smart option for saving money

Many people rule out winter straight away because they associate cold with problems. That is a rookie mistake. Winter is the best season if you want your savings to go as far as possible and want to secure the best workers for your home.

The reason is pure market logic: demand for renovations drops after Christmas. Builders need work to keep their permanent staff busy, so they often trim their profit margins to the bone. This is a good moment to calmly compare whether to hire a renovation company or a self-employed renovator: differences, advantages and risks for your project, because everyone will have time to listen to you and fine-tune the budget without rushing.

Interior work is done under cover, completely sheltered from rain and snow. Putting up plasterboard partitions, renewing plumbing or wiring the fuse board can all be done perfectly well indoors. If you are painting, damp will slow the drying, but with dehumidifiers and controlled ventilation this is easy to manage.

Public holidays and seasonal working patterns

But we cannot ignore the seasonal patterns of the labour market or the collective agreements in Spain's construction sector. Each autonomous community sets its own rules on summer working hours. In Catalonia and Madrid, for example, workers often do continuous morning shifts during the hottest months. This changes the usual hours when noise is allowed in owners' communities, so the works schedule has to be adjusted for breaks and tasks. Agreeing this with your architect in advance will save you unnecessary complaints from neighbours.

How the type of renovation affects your choice

Renovating the whole home is not the same as giving the kitchen or bathroom a quick refresh. Depending on the type of work, the balance between the seasons shifts:

  • External works: If you are renovating terraces or courtyards, aim for spring or autumn. Extreme winter and summer heat will seriously affect how cement sets and will reduce its durability.
  • Services and climate control: For new electrical wiring or internal pipes, the outside weather matters very little. Winter is ideal for booking technical visits in advance and avoiding summer shutdowns.
  • Full renovations: Because these jobs last for months, it is worth looking closely at how long a renovation takes: realistic timescales by type and size. The ideal plan is to design in autumn, get the permits in winter and start demolition in spring.

Seasonal comparison table

This summary table shows the main pros and cons of each season for renovating your home:

SeasonMain advantagesMain drawbacksProfessional recommendation
SpringFast drying and plenty of usable daylight.Builders' diaries are crowded.The best season for full renovations and painting.
SummerEasy to be away during the noisiest work.Supplies and factories stop in August.Ideal for very quick interior jobs.
AutumnSuppliers fully restocked and good weather.Little room if you want to finish before Christmas.Perfect for changing windows and fitting insulation.
WinterLower prices and excellent labour.Paint and plaster take longer to dry.Ideal for renewing electrics and bathrooms.

Paperwork and licences: the clock nobody sees

Many owners optimistically assume they can start knocking down walls the day after they approve the builder's final quote. However, any intervention has to work within the council's administrative timescales.

Whether you need a simple prior notification, or your project affects load-bearing walls and you have to pay the works licence fee in Barcelona, the clock is always ticking against you. These procedures can take weeks. So if you want to renovate in spring, apply for your works licence in Barcelona in midwinter, to avoid your project being held up before it even starts.

Financial and negotiation points for your renovation

Right now, with material and supply prices moving up and down constantly, the budget is vital. Understanding how renovation firms charge will give you more confidence when you negotiate a firm agreement.

First, insist on a contract that puts everything in writing. Make sure you understand the difference between a fixed quote and an open quote in renovations: what each is and why it matters, so you avoid nasty surprises when the job is finished.

Also plan for tax. You can legally benefit from the reduced 10% VAT rate on renovations: when it applies and how to claim it if the cost of the materials you buy does not exceed forty per cent of the total job price. A useful saving for your home.

Frequently asked questions about when to renovate your flat

What is the cheapest season to renovate a flat?

Winter is usually the cheapest season across Spain, because demand drops sharply after the holidays. Many small family builders trim their profit margins so they can keep their teams busy, so it is often easier to agree very competitive costs.

How long does it take to get a works licence before you can start?

This depends on each town hall. A prior notification for minor works can be granted almost straight away, but a major works licence that needs the architect's college endorsement (visado) usually takes two to four months on average. That is why you need to act well in advance in your planning.

Is it always a good idea to renovate in the middle of summer?

It has the advantage that you can move out while you are on holiday. The drawback is August, when warehouses and national transport close, which can freeze the renovation completely.

How do winter cold and damp affect how materials dry?

Winter slows the drying of plaster, paint and cement mortar. However, it does not hold up the installation of plasterboard partitions, interior plumbing, electrics or air conditioning.

Recommended articles to keep planning your renovation

Before you decide your final timetable, read these useful guides from our technical team:

Keep reading

✆ Call✦ WhatsAppGet a quote →