Reduced 10% VAT on renovations: when it applies and how to benefit
Indicative prices · VAT not included. Not a binding offer.
When does the reduced 10% VAT rate apply to a renovation?
VAT drops from 21% to 10% if the customer is a private individual using the home for private purposes, or an owners' community; the building was completed at least two years earlier; and the materials supplied by the contractor are not more than 40% of the taxable base. If any of these is missing, 21% applies. From 1 December 2026 payment through a bank will be required (Royal Decree-law 29/2026, awaiting validation).
Key points to remember today
- Real savings: Moving from 21% to 10% VAT can cut thousands of euros off the final cost of your project, legally.
- Residential use only: The person paying for the work must be a private individual or an owners' community.
- Minimum age of the building: The construction or rehabilitation of the home must have been completed at least two years before the works start to qualify for this tax relief on a full home renovation.
- The 40% rule: The value of the materials supplied by the installer cannot be more than 40% of the taxable base of the operation.
- You can combine tax benefits: You can also claim a renovation deduction on your income tax (IRPF) if you meet the energy efficiency requirements in 2026.
Change planned from 1 December 2026. Royal Decree-law 29/2026 of 6 October (published in the BOE on 7 October) has been in force since 8 October 2026 and amends article 91.Uno.2.10 of the VAT Act with effect from 1 December 2026: the reduced rate will depend on the work being paid by credit or debit card, bank transfer, nominative cheque or deposit into an account at a credit institution, and it will extend to homes let as a main residence, whoever the landlord is. The decree is awaiting validation by the Congress of Deputies; if it is not validated, it would stop applying. Until 30 November 2026 the conditions explained below apply.
Planning a home renovation is exciting, but let's be honest: the shock you get when you add up the quotes is usually huge. Part of the blame lies with VAT, whose general rate is 21%. The good news is that the law allows you to reduce that rate to 10% for renovation and repair work on buildings used as homes, if certain requirements are met. The tax authority is not being generous for no reason. The reduced rate is meant to encourage home renovation, support jobs in construction and reduce the black economy in this sector.
Of course, this is Spain in 2026, and the paperwork is never simple. For your invoice to carry the 10% rate, three national conditions must be met strictly and without exception. If your renovation fails just one of them, the builder must charge you 21%. Be careful, too: falsifying these details or skipping the checks can lead to an inspection, with penalties for both parties. Below, we explain how this tax relief works, so you can use it without problems.
The three requirements the tax authority checks
Before you start, you need to know exactly what the tax authority (Agencia Tributaria) looks for when it reviews an invoice under this special rate. This is not a matter of interpretation or a grey area you can negotiate with the builder. There are three clear conditions, and your project must meet all of them.
1. Who the invoice is addressed to
The first condition depends on who the client is. The reduced 10% rate for renovations is meant for end users who use the property as their own home. The work must be ordered by a private individual or by an owners' community in the building. What if the invoice is made out to a company, a limited company or a self-employed professional who plans to deduct the VAT? In that case, the 21% general rate applies: the law requires the client to be a private individual who is not acting as a business or professional, or an owners' community.
2. Use of the home and the age of the building
Not every property qualifies, and not every place you call home does. The law requires that the construction or rehabilitation of the home was completed at least two years before the works begin: what counts is the date the construction or rehabilitation finished, not the date you bought the property. The renovated property must also be used as a private residence, whether it is your main home or a second home for holidays. The tax authority specifies that if the home is let or used for a business or professional activity, even partly, the reduced rate does not apply; Royal Decree-law 29/2026 changes the rule on letting as a main residence from 1 December 2026 (see the notice at the start of the article).
3. The key rule: materials cannot exceed 40%
This is the trap that catches most invoices trying to use the 10% rate. The cost of the materials supplied by whoever does the work cannot be more than 40% of the taxable base of the operation; if it is higher, the whole job is taxed at the 21% general rate. This is the point that causes the most disagreement between clients and independent builders, so let's look at it in detail.
How the 40% materials rule is calculated
Get this clear before you sign any quote. If you hire someone to paint your flat or fix a few damaged tiles, you will probably stay under the threshold. For bigger works, the picture changes quickly. Using a renovation budget calculator to model the items in your project will show you that the balance between labour and materials can tip the result either way.
Here is a simple example with round numbers. Say you decide to renovate your bathroom. The company quotes 5,000 € (before tax) for the full installation. Now let's split those 5,000 €:
- Option A (expensive materials, little labour): You choose premium wall tiles and an exclusive wall-hung vanity unit. Their purchase price for the installer is 2,500 €. The contractor charges 2,500 € net to strip out the old bathroom and fit the new fittings. Materials come to 50% of the base cost. Because that is above the 40% limit, the whole bathroom invoice is taxed at the 21% general rate. That is a costly surprise.
- Option B (standard materials, balanced with the installation): This time you buy standard tiles and functional sanitaryware for a total of 1,800 €. The full installation and the bricklayer's labour stay at 3,200 €. Materials make up 36% of the total cost, which is below the critical 40% limit. The conditions are met, so the 10% rate applies to the whole invoice, which saves you a lot of money legally.
The law does not spell out in more detail what counts as supplied material. That is why the quote should separate materials from labour clearly, so you can check that the materials do not exceed 40% of the taxable base.
Which works qualify for the reduced rate and which do not?
Residential projects vary a great deal, and it is often unclear which work can get the 10% rate. To make this easier, we have listed the work the tax authority accepts and the work it rejects, based on what we see in practice.
For example, if you are considering a full renovation or a partial one for your home, you need to check carefully which individual items meet the conditions. A common mistake is to mix different types of work into one overall invoice, and then get the material percentages wrong.
Also, if you are wondering how much it costs to renovate a flat in Barcelona, by m2 and quality level, you will have noticed that most of the cost goes on joinery or the kitchen. These items often need a lot of materials. That is why how each item is invoiced becomes a real skill in tax planning.
Comparison table: tax treatment by type of work in a home
| Type of work | Applicable VAT rate | Conditions on materials or structure | Typical example |
|---|---|---|---|
| Bathroom or kitchen renovation | 10% | Materials supplied below 40% of the cost of the item. | Replacing pipes, tiling the walls and basic plumbing. |
| Boiler or aerothermal heat pump replacement | 10% or 21% | Often exceeds 40% in materials, because the equipment is expensive to buy. | Installing a condensing boiler with underfloor heating wiring. |
| Painting walls and ceilings | 10% | Usually qualifies. Paint is cheap compared with the labour time. | Painting a 3-bedroom flat, including smoothing walls with a textured finish (gotelé) first. |
| Bespoke furniture and interior design | 21% | Treated as consumer goods or non-structural furniture. | Making and fitting sofas or movable plywood shelving. |
| Installing security systems | 21% | The tax authority usually does not treat these as a standard building renovation. | Fitting wireless CCTV cameras and a connected alarm panel. |
How to request it: step by step for the informed client
To avoid misunderstandings with your accountant or with the inspectors, you need to be careful and keep records at every administrative stage of the job. For tax purposes, there are a few simple steps that protect you and prevent unpleasant surprises later. The first decision is who to hire. Compare the pros and cons of giving the project to a large renovation company or a self-employed builder, as both options are common in today's market.
A professional company usually knows the tax rules well and will give you a standard form to sign. With self-employed workers, you may have to remind them of the current rules yourself, or provide the paperwork needed to authorise the invoice.
The correct process has three main steps:
- Document the details of the home: The company usually asks you to confirm in writing that you are a private individual, that you use the home privately and that its construction or rehabilitation was completed at least two years before the works start. Keep a copy of what you sign and of the documents that prove those dates.
- Check the written quote carefully: The contract should clearly separate the labour items from the materials. Ask the builder to state the estimated share of materials for each item, so you know the total stays below 40% before you accept the final quote.
- Payment and other aid: Once the invoices at 10% have been paid, keep them together with the payment receipts. The Generalitat's Next Generation grants no longer accept applications (we explain this in the Next Generation renovation aid in Catalonia guide), but the IRPF deduction for energy efficiency is still available for works up to 31 December 2026, or 2027 for predominantly residential buildings. And always pay through the bank: from 1 December 2026 it will be a condition of the reduced rate if Royal Decree-law 29/2026 is validated.
Practical ways to stay within the legal 10% rate
But suppose that when you check the quote, you find the materials come to 45% and the overall invoice is at risk with the tax authority. Is everything lost, and are you forced to pay the 21% general rate? Not necessarily. There are valid ways to structure your contracts without breaking the tax rules.
A simple way to stay within the limit is to choose material qualities that keep their cost below 40% of the taxable base of the job, and to ask the contractor to calculate it in writing in the quote. Before splitting one job between several contractors (for example, the floor joinery on one side and the sanitaryware and taps on the other) to stay under the limit, check with a tax adviser: the law measures the 40% on the taxable base of the operation.
Of course, all of this requires some administrative skill and careful records of site permits and declarations to the local council. For more detail and answers to your legal questions, read our guide on certificates and legal documents for renovations in Barcelona, which covers all these planning requirements in detail.
So, to sum up: there are some fixed conditions to reducing VAT on your renovation, but if you follow the rules, the saving is worth it. Plan carefully, do not try to mislead the tax authority with false costs, and ask your builder for full transparency on invoice figures from the first conversation. If you would like us to assess the feasibility of your renovation or to discuss a budget for your project, contact our team. We will be happy to advise you on how to renovate your home and keep every euro the law allows.
Comparison table: VAT treatment by scenario
| Type of work | Applicable VAT | Key condition or detail |
|---|---|---|
| Full kitchen and bathroom renovation | 10% or 21% | It is 10% if the cost of the furniture, tiles and sanitaryware supplied by the builder does not exceed 40% of the total. |
| Replacing appliances | 21% | Appliances always carry the general rate, even if the same fitter installs them. |
| Boiler or climate control installation | 10% or 21% | Subject to the 40% rule. If the equipment is very expensive and the labour is quick, it usually falls under 21%. |
| Repairing leaks through home insurance | 21% | When the invoice is made out to the insurance company (a legal entity), the right to the reduced rate is lost by law. |
| General painting and replacing parquet | 10% | Usually meets the requirement easily, because labour costs are far higher than the raw materials. |
Combining it with other aid in 2026
As well as paying less VAT on your home renovation, there are good options in 2026 that combine well with energy or structural work. For example, if you are planning a full renovation that includes better climate control in the flat, you can also look at the IRPF energy-efficiency deduction (the Generalitat's Next Generation grants no longer accept applications).
Likewise, if these works reduce your home's non-renewable primary energy use, you will need an energy certificate showing the improvement in your energy rating. This document is essential for the IRPF deductions for energy-efficiency works, which according to the tax authority apply to works carried out up to 31 December 2026 (up to 31 December 2027 in predominantly residential buildings).
Frequently asked questions about reduced VAT on renovations
Can an owners' community apply the 10% VAT rate to renovating the entrance or the façade?
Yes. The law expressly includes work whose client is an owners' community, as long as the building is mainly residential and the other conditions are met: the construction or rehabilitation was completed at least two years before the works start and the materials supplied do not exceed 40% of the taxable base. In that case the reduced 10% rate applies.
What happens if I buy the materials myself from a builders' merchant?
If you buy the materials directly (tiles, sanitaryware, taps), the shop must charge you 21% VAT, because that is a straightforward supply of goods. To benefit from the 10% rate, the installing contractor must buy the materials and invoice them together with the labour, within the 40% limit.
Does replacing windows to improve energy efficiency qualify for reduced VAT?
Yes, replacing windows is a very common renovation. The 10% VAT rate applies as long as the cost of the windows themselves (PVC, aluminium or wood) does not exceed 40% of the total cost of the installation. If the job is very simple, with expensive materials and a quick fitting, it could go over that limit and be taxed at 21%.
What is the penalty if the tax authority finds that 10% was applied incorrectly?
The builder is mainly responsible for issuing the invoice at the correct VAT rate. They face possible inspection reports, a demand for the 11% difference that was not charged, and late-payment interest. The client may also be affected if they signed false statements about the use or age of the property.
Sources
Keep reading
Renovation guarantees and insurance: liability and ten-year cover
Planning a renovation? Learn the difference between civil liability insurance, ten-year structural cover and LOE guarantees, and what to ask for in 2026.
Regulations and licencesCost of a renovation project (architect and technical architect)
What an architect's and technical architect's renovation project really costs in 2026: fee breakdown, PEM, endorsement fees and tips to save money.
Regulations and licencesHow much does a building licence cost in Barcelona?
What a building licence costs in Barcelona: the fee breakdown, the 3.35% ICIO works tax, the technical suitability report (IIT) and how to keep costs down.

