Cost of a renovation project (architect and technical architect)

By the Tu Nuevo Piso teamPublished 23 July 202613 min read

Indicative prices · VAT not included. Not a binding offer.

Taking on a full renovation in 2026 is one of the most exciting decisions you can make, and also one that can feel daunting financially. In construction and residential architecture, one question always comes up and holds many owners back: how much do the technical professionals cost? You hear terms such as the material execution budget (PEM), endorsement fees (visado) and rates per square metre all the time, but almost nobody puts clear figures on the table.

It is commonly assumed that hiring an architect or a technical architect is a luxury reserved for high-end homes. The reality is very different. Their involvement is not just a guarantee of design and good use of space. Where the renovation alters the architectural configuration of the building, the LOE requires a technical project, and the works cannot go ahead without it. So we want to look in depth at what determines the cost of these projects and how professionals set their fees in Spain today.

Key points to remember

  • Professional fees are set freely: since fees were deregulated, each professional sets their prices according to the complexity of the renovation project.
  • PEM as the reference: costs are generally estimated as a percentage (8% to 15%) of the works' material execution budget (PEM).
  • Distinct but coordinated roles: it is essential to understand the differences in what each professional does. Read our analysis of architect vs technical architect before making any decision.
  • Planning is essential: understanding how to organise a full renovation step by step will help you see exactly when each professional comes in and how that affects your cash flow.

What determines the cost of a renovation project?

To understand the fees that architecture studios quote, we first need to dispel the idea that there is one standard price per square metre. The cost of drawing up a technical project to renovate a home varies with many factors, which professionals analyse carefully before making a firm commercial offer. Among these factors, the total floor area and the extent of demolition and rebuilding are the main ones.

But the factor with the greatest weight is the architectural complexity of the work. Redesigning an open-plan flat from the 80s does not take the same design, technical or calculation effort as working on the load-bearing walls of a century-old building. In that second case, the precision of the structural calculations becomes critical, which noticeably increases the time the professional spends and, in turn, the price of their services.

Another key element, which you will hear about constantly, is the well-known PEM, or material execution budget. This is the pure cost of the materials and labour needed to carry out the work in the project, excluding VAT, the builder's industrial profit and the contractor's overheads. Historically, and still in 2026, architects' fees are calculated as a share of between 8% and 15% of the PEM, depending on the total size of the work and the reputation of the studio itself.

Location also puts a subtle but real pressure on professionals' quotes. In high-demand property markets such as Madrid or Barcelona, average fees for designers and engineers are slightly higher than in areas with less activity in the building market. To put these prices in perspective within your overall budget, it is very useful to know how much it costs to renovate a flat in Barcelona, by m2 and quality level.

Breakdown of architect's fees (design and site supervision)

An architect's work is not just drawing attractive plans on a design computer. A full renovation project is made up of several consecutive stages, and each one accounts for a share of the agreed fees. Understanding this sequence helps you manage payment schedules and ask for the right deliverables throughout the build.

At the start comes the preliminary design and prior studies stage, which usually takes 15% to 20% of the total fee. In this period the architect surveys the current state of the home, researches the applicable municipal regulations and proposes different layout options. It is the most creative and collaborative stage, where you define the look, the storage needs and the overall architectural style.

Next comes the basic project, which takes roughly another 30% of the fee. This document sets out the chosen architectural solutions precisely, and it is the legal document used to formally apply for the works licence at the town hall. Although it does not go into the internal detail of pipework or structural spans, it confirms compliance with the habitability and safety rules in force.

The third critical stage is the execution project, which represents another 30% of the architect's total fee. This is where technical detail reaches its peak: plumbing, electrical, heating and climate control systems are specified in full, along with precise structural calculations for any wall propping needed. For you as the client, the most valuable part of this file is the detailed measurements, which describe every item of work so that you can ask different builders for firm quotes and compare them on equal terms.

Finally, the last 20% to 25% of the architect's fees goes on site supervision. During this period the professional visits the site regularly to check that the build follows the drawings exactly. The architect confirms that the builder is not making unjustified deviations and approves the monthly progress payments you will pay out of your own pocket. To manage this final part well, it is highly advisable to understand what site supervision is and when it is legally required in Spain.

How much does a technical architect cost?

If the architect is the thinker who designs the work on paper, the technical architect (arquitecto técnico) is the front line on the ground, making that design a built reality with full quality control. The role is strictly regulated by the Building Act (LOE), which gives it the vital task of execution management (Dirección de Ejecución de la Obra, DEO).

Beyond this supervisory role over how materials are fitted and over the daily schedule, the technical architect usually takes on a key role that requires proper training: health and safety coordination. In this dual role, they are legally responsible for making sure workers have the necessary protective measures on site, preventing any work accident for which the homeowner could be jointly liable if there were no qualified technical professionals in place.

To get a clear idea of their fees, it is worth knowing what a technical architect is and what they do in their everyday work of checking materials and modern building systems.

In the 2026 flat renovation market, a technical architect's fee for a full renovation usually ranges from 3% to 5% of the PEM of the works. For a project with a PEM of around 50,000 €, their fees for management and safety duties will generally fall in the range of 1,500 to 2,500 € net. Although this may look like an unnecessary cost to inexperienced eyes, a good technical architect can save you a lot of money by spotting construction defects in time, which you would otherwise have to repair at a very high cost months after moving in.

When are the architect and technical architect compulsory?

Many owners wonder whether they can save these thousands of euros on professionals by managing the renovation directly with the builder. The short answer is a firm "it depends". Spanish law, through the Building Act (LOE) and each town hall's rules for processing works, sets clear criteria on whether these registered professionals must be involved.

The LOE requires a technical project when the work alters the architectural configuration of the building, and college endorsement (visado) is mandatory only for the execution project and the final works certificate of those works (Royal Decree 1000/2010). That is what usually happens in these common residential cases:

  • When the renovation essentially changes the structural system of the building as a whole (for example, replacing floor structures or extensive structural reinforcement); if the effect is only local, ask your technician and the town hall which procedure applies.
  • Whenever the use of the building's space is substantially changed (for example, converting a commercial premises into a home or splitting a large flat into two apartments).
  • When the renovation substantially affects the building's exterior envelope (changing the size of façade windows, permanently enclosing shared terraces, or technical rehabilitation of walkable roofs).
  • If the building has some level of historical or monumental protection from the heritage authorities of the local town hall.

If your renovation involves any of these points, the town hall may process it as what counts as major works, or as minor works by notification, depending on its ordinance; in both cases the project must be signed by a competent technician. In Barcelona, for example, the major works licence is reserved for interventions such as a global one on foundations or structure, a volume increase or a change of use, while renovations that affect the structure only locally or partially are handled by notification. By contrast, for renovations that do not affect beams or the layout of wet areas, you are dealing with what counts as minor works. The paperwork is lighter there. In Barcelona, the simple "for your information" notice (interior works that do not change the layout, structure or façade) needs no documents, but a type I or II minor works notification does require a project signed by a competent technician.

If you want to clear up any doubts for your specific area, read carefully our article on when you need an architect or technical architect for a renovation in Barcelona, which covers the local ordinances that require technical sign-off.

Cost comparison table by type of renovation (2026 prices)

To help you plan your total renovation budget, we have set out approximate fee ranges for architects and technical architects. They are typical levels, not quotes. The figures in the table below reflect the 2026 market for homes of between 80 and 110 square metres.

Type of workLegally required roleArchitect fee rangeTechnical architect fee rangeEndorsement and fee costs
Interior renovation (no load-bearing walls touched)Optional (an interior designer is recommended)1,800 € - 3,500 € (basic design)Not compulsorySimple minor works fees (2%-4% PEM)
Full renovation (with changes to the layout)Architect (compulsory in some town halls)3,500 € - 6,000 € (layout project)1,800 € - 3,200 € (optional coordination)300 € - 500 €
Renovation affecting the structure (wall or beam propping)Architect + technical architect (the LOE requires a project if the structural system is essentially changed)5,500 € - 9,500 € (structural calculation)1,800 € - 3,500 € (health and safety and site management)600 € - 1,200 € (official endorsements)
Full renovation of a single-family house (masía, a traditional stone farmhouse, or detached house)Architect + technical architect (the LOE requires a project if the work alters the architectural configuration)8,000 € - 15,000 € (overall building project)3,000 € - 5,500 € (continuous supervision)1,200 € - 2,500 € (endorsements and college fees)

What other costs come with the technical project?

People tackling a renovation for the first time often make the serious mistake of lumping all the administrative and bureaucratic costs in with the technical fees. This causes cash-flow pressure halfway through the work. So as well as the fee agreed with your architect and technical architect, you need to set aside an additional sum to cover several external charges that the authorities require.

The first of these payments is the endorsement (visado) by the professional colleges, which is mandatory only for the execution project and the final works certificate of works that require a project (Royal Decree 1000/2010). This legal step is a formal check carried out by the official colleges of architects and technical architects on the documents submitted. It confirms that the signing professional is legally qualified and that the project formally meets all the required rules. If you want to understand this administrative process and its direct cost, it is very useful to learn what the architects' college (collegi d'arquitectes) and visado are, explained clearly.

Second are the municipal fees that you must pay to the town hall. These are usually split into two completely separate items: the charge for municipal planning services (a fixed fee that pays for the municipal architect who reviews your file) and the Tax on Construction, Installations and Works, better known by its abbreviation, ICIO.

The ICIO usually accounts for 3% to 4% of the PEM of your renovation. So for a renovation with an officially assessed PEM of 60,000 €, the combined town hall fees and taxes will cost you between 2,000 and 2,800 €, and they are unavoidable. If your main or second home is in the Barcelona area, it is worth reading the figures carefully in our post on the cost of a works licence in Barcelona before making any formal payment.

Tips for getting the most out of your investment

Saving money on your technical professionals does not mean hiring the cheapest person you find on general advertising sites. Those decisions often lead to projects drawn up in a rush, with no proper measurements and big errors that the builder will use to inflate the budget midway through and charge you thousands of euros more. Smart savings on professionals come from being as rigorous as possible when defining the scope of the work.

The golden rule for keeping your investment under tight control is to avoid variable fees at all costs and to opt firmly for fixed-price packages that cover the full service. Always ask your architect to set out their fees in a service contract with a fixed price that cannot change over the course of the project, even if the PEM later moves because of the price of the tiles you choose or other finishes you decide to install.

Another trend in the 2026 residential construction market is centralised contracting. Many owners who prefer to avoid coordinating several separate professionals choose a turnkey flat renovation in Barcelona. It is a popular option because one company handles every part of the process, from the initial plans to the technical architect's reports and the physical work on site.

Finally, do not just compare quotes on the number of site visits the builder promises to make. Quality control on site needs real commitment. Make sure the quotes describe exactly what "site supervision" (dirección de obra) includes: how many on-site visits per week are included? Are the final drawings of the actual layout of the installations after the walls are closed included (as-built drawings)? Putting all these details in writing, and formalising them with a notary if needed, will help you avoid problems, pointless friction and unexpected price increases.

Frequently asked questions (FAQ)

Is it compulsory to hire a technical architect if I already have an architect for my renovation?

Yes. In the vast majority of cases where the renovation requires a full building project, the law (LOE) requires an architect as site manager and a technical architect as execution manager. Both roles are legally complementary and needed to guarantee structural safety and the final quality.

What share of the total cost of the renovation do the technical fees make up?

In general, the combined fees of the architect and technical architect usually come to between 10% and 15% of the PEM of the works. This percentage can vary with the size of the renovation, the complexity of the design and the reputation of the architecture studio you hire.

Can I skip the technical project to save money on a full renovation?

It depends on the works and on the town hall. In Barcelona, only interior works that do not change the layout, structure or façade (the simple "for your information" notice) are filed without documents; if you change the layout or affect the structure, the notification or licence requires a project signed by a competent technician, and college endorsement (visado) is only mandatory in the cases of Royal Decree 1000/2010.

How does the professional endorsement affect the final price of technical services?

The endorsement from the official college of architects or technical architects usually costs between 200 and 800 €, depending on the size of the property and the scale of the work. This cost is usually included in the professional's quote or charged as a separate item, but it is mandatory only for the execution project and the final works certificate of works that require a project (Royal Decree 1000/2010).