COAC visado: what it is and when it is required
Key points to know right away:
- The COAC regulates the practice of architecture across Catalonia to protect the public interest and habitability.
- The college visado (the college's formal stamp of approval) is an administrative check that confirms the professional's licensing, the completeness of their documents and their insurance.
- It is compulsory for execution projects, demolitions and legalisations, but voluntary for minor cosmetic renovations.
- If you are going to start works, it is essential to establish when you need an architect or a technical architect.
Imagine you decide to take the plunge and transform your home in Catalonia. Perhaps you want to knock down walls to join rooms together, or maybe you plan to renovate a flat in a lovely old building in Barcelona. The process starts with enthusiasm, but suddenly you run into a constant administrative term: the 'COAC visado'. You can hear bells somewhere, but you can't tell where they are ringing. What is this document? Is it just a bureaucratic cost, or does it really give legal and structural security to your property in 2026? And what role does the Col·legi d'Arquitectes de Catalunya play in your project?
The maze of permits and layouts can be bewildering. Many people think it is enough to hire a builder, knock down partitions and hope nobody calls the authorities. However, in 2026 checks protect the soundness of the property. To coordinate this work safely, there is the visado system.
But don't be overwhelmed by endless technical jargon. We will look at the COAC visado in a practical, plain and direct way. The aim is for you to understand how this step works, when you definitely have to go through it, and how it affects your physical safety, the price of your project and the timescales of your future renovation.
What is the COAC and why does it watch over what happens in Catalonia?
If you have ever walked through Plaça Nova, opposite Barcelona Cathedral, you will have noticed a distinctive building decorated with sgraffito designed by Pablo Picasso. This is the headquarters of the Col·legi d'Arquitectes de Catalunya (COAC). But this body is much more than a historic façade or a simple cultural association of professionals.
From a legal standpoint, it is a public-law corporation with public functions delegated by the administration itself. Its main purpose is to regulate the practice of architecture, oversee the ethics and quality of its members, and safeguard the safety of the people who will live in or pass by the buildings. In short, it acts as a firewall, stopping people without the proper qualifications or official authorisation from taking on construction responsibilities.
The COAC is also organised by territory, through delegations (Barcelona, Girona, Tarragona, Lleida, Ebre or Central Catalonia). In other words, the same requirements do not apply on the Costa Brava as when renovating a flat in the Eixample. Because it is decentralised, it backs the professional by making their dealings with town halls easier.
The college visado: what does it really involve?
Let's be completely clear: there is a common belief that the college visado is just a bureaucratic hurdle created to raise extra fees. However, the visado is a formal and essential check. Through this step, the COAC verifies that a technical project strictly meets the minimum requirements set by sector regulations and building law.
One critical detail needs clarifying: the visado does not check that the specific structural calculations in your project are free of mathematical errors. The college's verifying technicians will not manually recalculate the concrete or the thickness of the beams that have been designed. That is the responsibility of the author of the design. So what is the real use of the visado?
It turns out it performs an essential protective role in three complementary areas:
- Licensing of the professional: It checks that the professional is an active college member, is not disqualified and has the specific authority for the project.
- Completeness of the documents: It confirms that the file contains all the mandatory documents, such as reports, detailed drawings, budgets and safety plans.
- Valid civil liability insurance: It ensures the architect's work is covered by current civil liability insurance of sufficient amount.
This check means that if a serious incident or material damage caused by the design occurs, there will be financial backing from a major insurer. If you want to know how the rules protect the owner in terms of deadlines and responsibilities, see our article on what guarantee a renovation has under the LOE, the legal deadlines and how to make a claim.
When is COAC visado compulsory? The current legal framework
Years ago the law required almost any drawing produced by a designer to be stamped. But to shorten administrative timescales and reduce overall costs, the central government passed Royal Decree 1000/2010 on compulsory visado. This regulation sets out the cases where a technical requirement still applies, to protect the wider public.
The project must go through college validation for these works:
- Building execution projects: This covers new constructions, extensions of floor area or volume, and alterations that change the shape of the property.
- Technical demolition projects: The demolition of any type of structure, given the serious physical danger it poses to workers and neighbours.
- Legalisation files: When you have built without prior permission and need to regularise your property with the planning enforcement department of the relevant town hall.
- The Final Works Certificate (certificado final de obra, CFO): The technical document in which the architect confirms that the works were completed strictly in line with the approved plans.
This feeds directly into how your renovation is classified. If the town hall classes the works as major works, it will unconditionally require the stamped execution project. By contrast, if they are minor works that are merely cosmetic and do not touch load-bearing walls or shared ventilation ducts, you are not obliged to have the technical documentation stamped for the direct municipal procedure.
How this regulation affects home renovation and interior design
Many owners believe that because they are working inside their home they are exempt from checks. And it is true that replacing a kitchen or painting does not require complex projects. For these basic jobs, a prior works notification or a municipal 'noted' notice (enterado) is enough.
But the picture changes overnight when you modify essential structural elements of the home. Do you want to open an arch in a brick load-bearing wall or move a main downpipe? At that point your works become structural in nature:
- The renovation is classed among the works that compromise the soundness of the shared building.
- A formally drafted project must be submitted, and you must justify compliance with the rules in the Technical Building Code (CTE).
- The town hall will refuse the licence if you do not provide that file, properly stamped by the COAC technical department.
To handle these situations with real guarantees, it is essential to rely on suitable professionals. It is worth knowing the role of a technical architect and what they do in your day-to-day work, and being clear about the works management role and when it is compulsory in your case. Without these signed authorisations you are exposed to neighbour disputes and substantial fines.
Basic Project vs Execution Project: which ones are stamped by the COAC?
This is one of the questions that comes up most often when you sit down with your architect in front of the first plans for your renovation. Should this initial drawing go to the COAC? It depends on the technical stage of the commission. Architectural projects are traditionally divided into two consecutive stages: the Basic Project and the Execution Project.
The Basic Project defines the look, volume and habitability of the property in order to apply for the initial municipal permits. However, it does not contain the level of construction detail needed to carry out the works. For this reason, its visado at the COAC is purely voluntary, not compulsory.
The Execution Project, by contrast, develops the basic project down to its construction detail. It contains the detailed calculations for the installations, the electrics, plumbing, the specifications for each material and the final structural design. This document is the essential guide the workers will follow on site. The rule is clear: the Execution Project must be stamped by the COAC before work starts. Without it, there is no municipal start of works and no civil liability insurance.
How much does it cost to stamp a project at the COAC?
Getting down to money, one of the common questions is how much this step will cost and how it affects your final budget. Visado fees in Catalonia depend on scales approved every year by the COAC, calculated using formulas based on the type of works and the Material Execution Budget (PEM).
The PEM covers the direct costs of the works (materials and labour) without adding the contractor's profit or VAT. The COAC applies a percentage to this amount to set the fee. For a typical renovation in Barcelona, the visado ranges from 150 to 450 euros, depending on the scale of the job.
As for who pays, these costs usually appear itemised in your architect's overall fee or are invoiced as disbursements. The architect pays the fees to the COAC when submitting the digital documentation, and then passes that exact cost on in their invoice. It is advisable to agree this point at the first meetings to avoid any misunderstanding.
The visado process step by step: from the drawing board to the digital seal
In practice, how does an architect carry out the visado at the COAC? With digitalisation now established in 2026, the traditional rolls of drawings and physical visits to the college office are a thing of the past. Today everything is managed through the COAC's online office, using an advanced electronic signature.
The process follows a very precise sequence that keeps things moving:
- Drafting the technical proposal: The architect draws up the layout plans, installation reports and construction details of the project.
- Document preparation: The files are organised into approved standard digital formats, making sure the safety study is included.
- Upload to the NouVisat platform: The professional enters the file details and estimated budget electronically and attaches the technical files.
- Quality and administrative review: The college's validators check the file to confirm the architect has civil liability insurance.
- Issue of the unique CSV code: If everything is in order, the COAC generates a unique digital seal with a Secure Verification Code.
All this digital flow has shortened the timescales. What used to take weeks of paperwork at counters in person is now usually resolved electronically within a few days, so that companies can start work on the agreed dates.
Comparison table of works, permits and COAC requirements
To simplify these complexities and help you assess your case quickly, we have prepared this explanatory table with the scenarios that come up most often in renovations and refurbishments in Catalonia:
| Type of works | Municipal procedure | Technical project? | COAC visado? | Associated guarantees |
|---|---|---|---|---|
| Kitchen renovation without touching the structure or load-bearing partitions. | Notice of works / Assabentat | Not compulsory (a technical report or sketch is enough). | Not compulsory | Direct commercial guarantee from the renovation installer. |
| Demolition of non-structural partitions (interior redistribution). | Simple prior works notification | Not required by law, but strongly advisable. | Not compulsory | Certificate that the structure has not been altered. |
| Structural reinforcement of the floor or opening gaps in walls. | obtaining the relevant building permit in Barcelona | Yes, compulsory (Execution Project). | Yes, compulsory | Architect's civil liability insurance, active and verified by the COAC. |
| Official change of use from commercial premises to a home. | Traditional major works licence | Yes, compulsory (Change of Use Project). | Yes, compulsory | Formal certificate of compliance with habitability rules. |
| Extension of a detached house or adding a storey to a building. | Urban planning major works licence | Yes, compulsory (Basic and Execution Projects). | Yes, compulsory | General civil liability insurance and taking out ten-year structural insurance (seguro decenal). |
Frequently asked questions about the COAC and visado
Does the COAC visado guarantee that the structures will not collapse?
Not directly. The COAC does not recalculate the beams or the concrete in a project. What the visado does is certify that the architect signing is legally licensed, has valid civil liability insurance, and that the file includes all the drawings, reports and specifications required by law.
How long does it usually take to get a project stamped by the COAC?
Thanks to the full digitalisation of the COAC platform in 2026, most straightforward visados are completed within 48 hours and a week at most, provided the documents contain no formal errors that the technician must correct.
Can I apply for a municipal licence in Barcelona without a stamped project?
For works that require a building project under the LOE, the town hall compulsorily requires the college visado. Submitting the licence application with an unstamped project will hold up the administrative process until the relevant visado code is provided.
What is the approximate cost of getting a renovation file stamped in Catalonia?
The price of the visado depends on the type of works and the Material Execution Budget (PEM). For renovations with medium-sized projects, COAC college fees usually range from 150 to 400 euros, a cost the architect usually itemises or includes in their overall fees.
Related material and practical resources
If you want to keep learning about permit procedures and local rules before you start your renovation, we invite you to explore some of our most complete guides:
- Find out how to handle your building permit in Barcelona step by step, without losing your mind.
- Learn everything you need to know about a prior works notification to the town hall for minor works and cosmetic changes.
- Thinking about the cost of your renovation? You can request a personalised quote from us, with no obligation, tailored to your real technical needs.
Keep reading
Renovation guarantees and insurance: liability and ten-year cover
Planning a renovation? Learn the difference between civil liability insurance, ten-year structural cover and LOE guarantees, and what to ask for in 2026.
Regulations and licencesCost of a renovation project (architect and technical architect)
What an architect's and technical architect's renovation project really costs in 2026: fee breakdown, PEM, endorsement fees and tips to save money.
Regulations and licencesHow much does a building licence cost in Barcelona?
What a building licence costs in Barcelona: the fee breakdown, the 3.35% ICIO works tax, the technical suitability report (IIT) and how to keep costs down.