Regulations and licences

What is ten-year building insurance (seguro decenal)?

By the Tu Nuevo Piso teamPublished 17 July 20268 min read

What is ten-year building insurance and who has to take it out?

Ten-year building insurance (seguro decenal) is the damage insurance that covers, for ten years, defects in the foundations and structure that compromise the stability of the building. The LOE requires it for residential buildings, and the developer takes it out. An individual self-builder of a single family home for their own use is exempt, but if they transfer the home within those ten years they must take it out, unless the buyer expressly releases them from it.

What is ten-year building insurance?

Buying a new home, or deciding to build your own house from the foundations up, is one of the most significant financial and personal decisions you will ever make. It is a process full of hopes, but also of uncertainty and notary paperwork that often seems like an administrative maze. One of the legal and technical concepts that comes up in this area is ten-year building insurance (seguro decenal). For many people it sounds like bureaucratic paperwork, but it is the main financial safety net protecting owners against serious construction defects once the keys have been handed over. In this complete technical guide we explain what it is, who must take it out and why it is essential.

Key points about ten-year insurance:
  • The LOE requires it for buildings whose main use is housing, with exceptions such as an individual self-builder of a single family home for their own use.
  • The developer takes it out, and the premium must be paid by the time the works are handed over.
  • It covers faults in the structure or foundations that threaten stability for ten years.
  • Individual self-builders of single-family homes are exempt, unless they decide to sell before the ten-year period ends.
  • For new-build projects or complex renovations, it is key to understand the role of the technical architect (arquitecto técnico) in site supervision.

What exactly is ten-year insurance?

Ten-year building insurance is a guarantee contract that covers the most serious defects in a building's construction process. It is regulated by the Building Act 38/1999 (LOE), a national law that sets the liability periods for everyone involved in a construction project. This policy guarantees, for an uninterrupted period of ten years, compensation for material damage caused directly by defects or faults in the foundations, pillars, beams, floor slabs or load-bearing walls that put the building's structural solidity directly at risk. Instead of starting a slow legal claim to get repairs, owners go to the insurer to receive compensation quickly.

Who has a legal obligation to take it out?

The LOE states that the policyholder of the ten-year insurance, the person who takes it out, is the property developer of the building, who may also agree with the builder that the builder acts as policyholder on the developer's behalf. If the building is for residential flats, taking out the policy is mandatory, and without it the work cannot be deeded or registered. This creates a complete administrative block on applying for mortgages or marketing the development.

But there is an exception to ease the burden on small owners. If you are an individual self-builder of a single family home for your own use, the LOE exempts you from taking it out. However, if you transfer that house inter vivos within the ten years, unless otherwise agreed you must take out the guarantee for the time remaining to complete the ten years, unless the buyer expressly releases you from it; in that case you must show that you used the home.

The critical role of the Technical Control Body (OCT)

Ten-year insurance cannot be arranged in the last month before the keys are handed over. Financial institutions and insurers always require the involvement of a Technical Control Body (OCT) from the early design and planning stage of the structural drawings. An OCT is an independent external body that audits the initial design and carries out on-site inspections to check that the concrete, the steel and the foundations strictly meet the sector's technical standards.

The insurer will not cover a structure hidden under tonnes of earth or concrete without favourable reports from this independent body. These periodic reports analyse the foundations and the main structure. If the work is finished without an OCT having been appointed at the same time, almost all insurers will refuse to issue cover, forcing costly non-destructive strength tests that will weigh heavily on the profitability of the whole project.

Standard cover versus common exclusions

Ten-year insurance is not a multi-risk policy that covers a broken window or damaged paint on the communal staircase. Its purpose is to respond to serious structural failures. It is worth briefly reviewing which building elements fall under the umbrella of this compulsory policy, which factors can be added through optional extras, and which are completely excluded:

Building elementType of coverDetail and legal period
Foundations and main pillarsCompulsory basic coverDamage that compromises the building's structural stability for 10 years.
Roof and façade waterproofingOptional extra guaranteeCovers leaks and damp (usually taken out with a three-year term).
Interior finishes and surfacesFully excluded from the policyMinor paint or plaster defects that the builder has to fix in the first year.
General installations and pipeworkNot covered by ten-year insuranceNon-structural plumbing or electrics, which have a 3-year habitability guarantee under the LOE.
Earthquakes or external firesFully excluded from the policyEvents unrelated to construction errors, normally covered by other home insurance policies.

How does ten-year insurance affect renovations and building rehabilitation?

A common question in the sector is whether renovations or rehabilitations of homes need ten-year insurance. If you are doing a cosmetic makeover, reorganising internal partitions or updating a bathroom, the answer is no. It is unnecessary for work that does not alter the foundations or the main load-bearing pillars of the building. However, it is essential to find out which warranty for a renovation under the LOE applies, so that you are protected against possible disagreements with the contractors.

The situation changes completely if the renovation is classed as a deep structural rehabilitation, including adding storeys, extending the building's volume, or changing a former industrial building into homes. In complex projects like these, classed as major structural works, the technical plans require full load studies. If the building is residential, the LOE requires the guarantee, except for the rehabilitation of buildings whose original new-build projects applied for a licence before the law came into force; and without proof of it, deeds declaring a new building are neither authorised nor entered in the Land Registry.

The preventive role of maintenance and technical inspections

Once the ten mandatory years covered by the policy have passed, the liability of the construction agents ends. From that point on, proper maintenance falls to the owners' community. For this reason, the regulations impose periodic inspection checks. A good example is subjecting the block to the building inspection (ITE), which is compulsory in Catalonia for residential buildings more than forty-five years old, to catch serious structural problems in time.

The registry route: the notary and the building logbook

This insurance requires the paperwork to be closed off when the building work finishes. The developer must gather the technical specification report for the materials, the final drawings of the service networks and the signed handover certificate with no outstanding reservations. All of this is compiled in the building logbook (libro del edificio), which acts as the true history of the installations for future maintenance. Without proof of the ten-year guarantee, the LOE does not allow the deed declaring the new building to be authorised or entered in the Land Registry.

Practical advice before you start your project

If you are starting a development or a construction project, these sector tips will be very useful:

  • Coordinated appointments: Arrange your Technical Control Body (OCT) at the same time as the sign-off of the project with the architects, to avoid delays when the concrete for the structure is poured.
  • Rigorous technical compliance: The builder and the technicians must apply the rules set by the Technical Building Code (CTE) strictly, which makes it easier for the insurer to validate the policy.
  • Specialist technicians: Before starting your projects in Barcelona or Catalonia, research carefully when it is compulsory to hire a qualified technician, with a proven track record.
  • Prior administrative control: Arrange the required works licence in Barcelona, or in your municipality, in advance, because town hall delays can increase insurance premiums.
  • Realistic budget: Expect the ten-year insurance and the OCT to cost between 1% and 1.5% of the material execution budget (PEM). If you need help calculating these costs, we suggest you request a personalised quote tailored to your project.
Recommended articles to continue learning:

Frequently asked questions about ten-year insurance (FAQs)

What does the policy cover, and what are its technical limits?

The main cover is strictly limited to direct material damage caused to the building by defects affecting the foundations and the structure (beams, floor slabs, pillars) that put the building's stability at risk. Aesthetic problems or finishing faults are excluded, as they fall under other policies.

Is a self-builder of a single family home required to take it out?

The law explicitly exempts this profile from taking out ten-year insurance at the start, if the home is for their own use. However, if they want to transfer or sell the property before ten years have passed since the handover certificate was signed, the self-builder is required, unless otherwise agreed, to take out the guarantee for the time remaining to complete the ten years, unless the buyer expressly releases them from it.

Is it possible to take out ten-year insurance once the structure is finished?

It is a very costly procedure and not feasible with most commercial insurers. The company requires a Technical Control Body (OCT) to supervise the concrete pouring and the placing of the structural steel from the initial setting-out stages. Trying to take out ten-year insurance afterwards will mean costly load tests and destructive studies of the structure's strength, which will delay the sale.

What is the difference between ten-year insurance and the guarantees on ordinary renovations?

Ten-year insurance responds to serious structural defects for ten years under the LOE. By contrast, an ordinary renovation of your flat normally falls outside the LOE and is governed by the contract and the Civil Code; the LOE periods of one year (finishes) and three years (habitability) only apply if the renovation falls within its scope (art. 2.2).

Sources

Keep reading

✆ Call✦ WhatsAppGet a quote →