Windows for your renovation: PVC vs aluminium and double or triple glazing

By the Tu Nuevo Piso teamPublished 22 July 20269 min read

Indicative prices · VAT not included. Not a binding offer.

Are you thinking about renovating your home and have you run head-first into the big dilemma of windows? Do not worry, it is the most normal thing in the world. After all, changing the windows of a flat is not simply an aesthetic question to make everything look nicer. It is one of the most strategic investments you will make in your life. In 2026, with energy prices changing constantly and a growing climate awareness in Spain, knowing how to choose the right frame and glass will decide whether your home is an oasis of calm and a perfect temperature or whether you are literally throwing money out of the window in heating and air conditioning. But you go online and get flooded with technical terms: PVC, aluminium with thermal break, double glazing with low-emissivity coating, triple glazing, minimalist profiles, argon gas... In the end you come away with more doubts than you started with. In this article we are going to go through everything you need to know in a very clear, direct and honest way. We want you to really understand what you are buying, how much you will save and which option fits your budget and your lifestyle.

Key points to remember

  • PVC or aluminium: PVC still offers the best thermal insulation for every euro invested, but aluminium with a thermal break is unbeatable if you want ultra-slim profiles and large-format windows.
  • Double vs triple glazing: Double glazing with low-emissivity and solar control coating is ideal for most of Spain. Save triple glazing for very cold mountain areas or extremely noisy streets.
  • Efficiency and regulations: Meeting the current requirements is compulsory if you want to avoid problems with your renovation. Do read our complete guide to full home renovation 2026 to plan the process step by step.
  • Avoid surprises: Planning the installation of the enclosures badly is one of the usual mistakes when renovating a flat, and it directly affects the final comfort.

PVC or aluminium: the eternal dilemma of window frames

PVC: the natural insulator par excellence

Let us start with the frame material. PVC (polyvinyl chloride) has established itself over recent decades as the most widely used option in residential renovation in our country, and that is no accident. It is a non-conductive plastic, which means that outside cold or heat simply does not pass through the frame. It needs no added element to be an excellent thermal and acoustic insulator on its own. Today's PVC profiles are nothing like those of twenty years ago. They now have several internal air chambers (generally 5 to 7 chambers) that break the transmission of heat very effectively. In terms of looks, the textures and finishes that imitate wood or satin metals have reached a level of realism that is hard to tell apart by eye. Its durability easily exceeds 40 years with hardly any maintenance, beyond a damp cloth with soap now and then. But its main strength is value for money: for the same thermal performance, a PVC window is usually between 15% and 30% cheaper than an aluminium window of an equivalent range.

Aluminium with thermal break (RPT): structural rigidity and a minimalist look

Aluminium, on the other hand, is a metal and therefore a natural heat conductor. To solve this and stop your window from sweating on the inside or passing the cold from the street through, manufacturers invented the thermal break (RPT). This involves inserting a plastic section (usually polyamide) between the outer and inner faces of the aluminium profile, insulating the two parts. Today's aluminium windows with a good thermal break offer excellent insulation levels, although they require higher manufacturing precision. But why choose aluminium if it costs more and needs this extra component? Mainly for its outstanding mechanical strength and structural rigidity. If your renovation includes large windows, floor-to-ceiling sliding doors to get out onto the terrace, or you want that ultra-slim minimalist look where the frame almost disappears to give all the attention to the glass, aluminium is the king. It carries enormous weights of heavy glass without flinching, and it offers an almost endless range of lacquered and anodised colours. Its resistance to fire and to extreme weather is also outstanding, which makes it the favourite choice for high-end contemporary architecture projects.

The glazing question: double vs triple glass

Double glazing with specific treatments

Do not forget that the frame accounts for roughly 20% or 30% of the total area of the opening. The real protagonist that slows the flow of energy is the glass. Single-glazed windows went out of use decades ago because they insulated so poorly. Today the starting point is always double glazing, made of two sheets of glass separated by an air or gas chamber (usually argon gas, which improves thermal insulation). However, fitting plain double glazing is no longer enough. The ideal is to opt for reputable brands and to specify the window with special treatments such as those offered by a good state-of-the-art Climalit glass unit. Low-emissivity (Low-E) glass has a microscopically thin layer of metal oxides that reflects indoor heat back into the room, stopping it from escaping in winter. If your flat also gets many hours of direct sun, it is vital to add a solar control treatment that filters infrared radiation in summer, avoiding the dreaded greenhouse effect inside the home. With this combination of advanced double glazing, you will get excellent thermal comfort in 90% of inhabited areas of Spain, and your electricity bill will fall dramatically.

Triple glazing: when is it worth making the jump?

Triple glazing adds a third sheet of glass, creating two intermediate air or gas chambers. It is an impressive piece of engineering, but it is not always necessary or advisable for every project. The main benefit of triple glazing is that it reduces the thermal transmittance coefficient (the U-value) to very low levels, almost reaching the requirements of a Passivhaus. When should you consider this option in your renovation? Mainly if you live in areas with a very harsh climate, with long, freezing winters (such as the northern plateau or mountain areas in the Pyrenees), or if you have north-facing façades with no solar gain. Another key scenario is noise: if you live on a large avenue with constant heavy traffic or near very noisy nightlife areas, triple glazing combined with special acoustic laminates will make the difference between sleeping soundly and suffering insomnia. However, there are two major drawbacks: weight and thickness. Triple glazing weighs 50% more than double glazing, which puts more strain on the window's hardware and limits the size of the sashes. It also needs wider, sturdier profiles, which noticeably increases the cost of both the joinery and the overall thermal and acoustic insulation in the renovation of your enclosures.

Technical comparison of materials and glazing

To make things easier for you, we have designed this direct, no-nonsense comparison table. It evaluates the main factors you should have on the table before making any purchase decision or asking builders for quotes.
Criterion assessedPVC window + double glazingAluminium RPT window + double glazingPVC or aluminium window + triple glazing
Thermal insulation (U-value)Excellent (typical thermal U-value between 1.0 and 1.4 W/m²K). Excellent insulation for the price.Very good to outstanding (typical thermal U-value between 1.2 and 1.6 W/m²K, depending on the quality of the polyamide).Extraordinary (thermal U-value can drop below 0.8 W/m²K). Maximum energy saving.
Acoustic insulation (attenuation)Very high (typical attenuation of 32 to 40 dB, depending on the thickness of the glass used).High (typical attenuation of 30 to 38 dB, very dependent on the section and on correct perimeter sealing).Exceptional (typical attenuation above 42 dB with asymmetric glass and acoustic laminates).
Design and joinery profilesThicker, sturdier profiles. A range of very realistic woodgrain foil textures.Ultra-slim minimalist profiles, ideal for maximising natural light in modern flat renovations.Requires thick profiles to support the weight of triple glazing, which reduces visibility somewhat.
Average price and installationVery competitive. One of the best investments if you want to keep the project spending balanced.Medium-high investment. High-end aluminium with RPT tends to push up the budget items.Very high investment because of the cost of the extra laminated glass and the more demanding hardware and hinges.
Impact on the overall budgetModerate. Not considered the most critical item compared with, for example, renovating the kitchen.High. It can account for a significant share of the money allocated to the items in your home renovation.Very high. On large joinery, it can be one of the most expensive parts of a renovation because of the reinforced hardware.

The influence of the Technical Building Code (CTE), certificates and real savings

Regulatory requirements: the Technical Building Code (CTE) comes into play

The regulations in force in Spain directly determine the types of materials we can choose for our home. The Technical Building Code (CTE) in its DB-HE (energy savings) section clearly sets the maximum thermal transmittance values to be respected in each climate zone of Spain. If you live in a cold inland area of the peninsula (Zone D or E), the thermal transmittance of the whole opening (frame, glass and roller shutter box) must never exceed 1.8 W/m²K. In milder, coastal climates such as those of Barcelona or Valencia (Zones B or C), the limit is a little more flexible (2.1 to 2.3 W/m²K), but it still requires advanced glazing with high-quality frames. The CTE also keeps a close watch on the air permeability of windows, classifying them from Class 1 to Class 4. Fitting airtight enclosures of Class 3 or 4 is not only a legal requirement if you carry out a renovation of some size. It is also your best shield against annoying draughts and the invisible heat losses that unnecessarily inflate the heating bill.

Energy certificate and efficiency grants

Improving insulation with efficient joinery has a direct reward in the valuation of your home. When you replace old single-glazed aluminium windows with modern PVC or thermal-break aluminium ones, the letter of the energy certificate in a renovation usually rises one or even two places on the official scale of the Generalitat de Catalunya or of your autonomous community. Best of all, this jump in energy efficiency opens the door wide to the attractive grants that remain active in 2026. For example, through the well-known Programme 4 for single-family homes, you can obtain a direct grant of 40% of the total cost of replacing the enclosures, with a maximum of 3,000 € per flat, provided you can show a reduction of at least 7% in energy consumption or heating demand once the works are finished. These deductions and incentives mean the return on investment from changing old joinery is much faster than you might expect in your full renovation.

Synergy between windows and efficient climate control

What is the point of investing in state-of-the-art aerothermal and home climate control if all the thermal energy escapes through poor enclosures? If your project includes low-temperature systems such as underfloor heating, airtightness and the insulation of your windows will always be the main factors in making sure the real electricity use of the compressor stays at the lowest levels possible.
Recommended reading: If you are scheduling the phases of your works and need to adjust the numbers, we also suggest checking the price of a renovation project in detail with an architect or technical architect.

Frequently asked questions about changing windows

What is the most durable material?
Aluminium with a thermal break offers the greatest structural strength over several decades, although today's high-quality PVC matches its real lifespan well in Mediterranean climates.

When is triple glazing worth it?
In cold mountain areas or on urban streets with too much noise. On the warm coast, double glazing with low-emissivity insulation is always the most recommended and efficient option.

Do these grants require any document?
Not to carry out the works, but it is essential to apply for the Next Generation grants for your community directly.

What is argon gas?
It is a heavy, colourless gas that replaces the air in the glazing cavity to reduce thermal conductivity and improve the home's climate control.