Materials and finishes

What is Climalit glass and how to choose the best specification for your new windows?

By the Tu Nuevo Piso teamPublished 12 July 20269 min read

You have probably been there. You are thinking about replacing the windows at home so you stop shivering in winter, or so you stop hearing the city traffic at three in the morning. You ask for quotes, and the salesperson says, "Don't worry, we'll fit Climalit." You nod, but you are not really sure what that means. Is it a material? Is it a type of window? Or is it a brand name that has taken over the whole sector?

The short answer is that Climalit is a registered trademark of Saint-Gobain. The longer answer, the one that really matters if you are going to spend money on a renovation, is more complicated. Not everything with two panes of glass and an air gap in between is genuine Climalit. In fact, there is a huge gap in thermal and acoustic performance between a basic conventional glazing unit and the advanced solutions fitted in 2026.

In this article we explain everything clearly and directly, with the practical facts you need so you are not sold short on your budget.

Key points to know:

  • It is not a generic: Climalit is a premium Saint-Gobain brand. Always look for the official mark laser-engraved on the glass.
  • Thickness is not everything: The real secret today lies in the invisible low-emissivity layers and thermal solar control.
  • Real energy improvement: This installation is the fastest way to improve the home's energy certificate and reduce consumption.
  • Flexible combinations: It lets you combine superior acoustic insulation and intrusion security in one design tailored to your needs.

How does a double-glazed unit work?

To understand how this thermal system works, we need to look at how an insulating glass unit is made. The principle is very simple. Instead of a single pane that transmits cold within seconds, two parallel panes are installed, separated by a perimeter spacer of aluminium or plastic resin. This spacer creates a fully airtight cavity that reduces the annoying loss of heat.

Here is the physical trick behind its performance. The sealed cavity air is dried using high-purity chemical desiccants. During automated manufacturing, this hidden desiccant material is placed inside the spacer profile. It stops the annoying condensation inside the home when outside temperatures fall, preventing the window from fogging up on the inside.

In the advanced options available in 2026, the cavity air is replaced with argon gas. This noble gas has a far lower thermal conductivity than normal atmospheric air. By slowing the transmission of cold and heat through conduction, the window acts as a perfect thermal shield. The warmth stays inside the rooms without constant losses.

Climalit Plus: low-emissivity and intelligent solar control

Many people still believe that widening the air cavity indefinitely improves insulation. Physics tells a different story. If the cavity exceeds twenty millimetres, the air inside starts to move, creating currents that carry the ambient temperature from one pane to the other. That is why the optimal cavity thickness is between sixteen and eighteen millimetres.

To achieve truly impressive efficiency without widening the window frames, the advanced Climalit Plus range was developed. It is the solution we recommend for modern renovations. The inner pane has an invisible industrial coating of precious metal oxides. This thin film acts as an intelligent thermal reflector.

Natural light passes through unhindered to brighten your rooms, but the heat from the heating bounces back into the interior instead of escaping outside. In sunny or Mediterranean climates, choosing technologies with solar control is essential. This specific filter selectively repels infrared solar radiation during summer, preventing uncomfortable overheating and reducing how long you need to run air conditioning.

Acoustic silence and security protection for the home

Insulating against temperature is fundamental to home comfort, but protecting your daily peace and quiet is just as crucial if you live in a noisy urban area. Rest is priceless, and an unsuitable window ruins your sleep. Fortunately, advanced glass specifications can tackle noise pollution at its root.

To cut outside noise, you cannot use ordinary glass of identical thickness. If you fit a typical symmetrical make-up, for example four millimetres of glass, a cavity, and another four millimetres of glass, both panes vibrate in the same rhythm, cancelling out the insulation. The professional trick is to use asymmetric thicknesses, for example a six-millimetre outer pane and a four-millimetre inner pane.

For severe urban noise, the star solution is the Climalit Silence configuration. This high-performance version includes a flexible, transparent acoustic polyvinyl butyral (PVB) interlayer that fuses two panes of glass into one compact unit. This flexible film dampens at source the annoying vibrations caused by sound waves hitting from the street outside. At the same time, this excellent laminated system significantly raises home security against break-in attempts or impacts, because the glass does not shatter into sharp pieces and stays bonded to the plastic film.

Climalit glass typeTypical make-up (mm)Thermal insulation (U-value)Estimated noise reductionMain recommended use
Classic Climalit (air)4 / 16 / 4 (dehydrated air)U = 2.8 W/m²K (not very efficient)30 decibels (basic)Refurbished older homes on tight budgets in areas with mild temperatures all year.
Climalit Plus (low-emissivity + argon)Planitherm 4 / 16 / 4 (90% argon)U = 1.1 W/m²K (very efficient)32 decibels (standard)Very cold mountain climates or interiors that need to cut winter heating use sharply.
Climalit Plus solar controlPlanistar One 4 / 16 / 4 (argon)U = 1.0 W/m²K (high protection)32 decibels (medium)Façades exposed to direct sun for many hours in Mediterranean or hot climates.
Climalit Silence (acoustic insulation)6 / 16 (argon) / 4 Stadip SilenceU = 1.1 W/m²K (balanced)40 decibels (total silence)Urban homes facing heavy traffic, railway stations or schools.
Climalit Protect (security reinforcement)Stadip Protect 3+3 / 16 / 4 (argon)U = 1.1 W/m²K (passive security)35 decibels (superior)Detached houses, street-level offices or flats on ground floors.

How to identify genuine Climalit glass and avoid imitations

In the renovation sector, it is very common to informally call any double-glazed unit on the market "Climalit". However, if you are paying for the superior quality of the Saint-Gobain manufacturer, you have every right to make sure you are getting genuine material in your home. A qualified professional installer will never object to you checking the glass on your own job.

To tell for certain whether glass is genuine or an imitation, the main visual indicator is the indelible Climalit mark, laser-engraved. It sits in one of the corners of the glazing unit, or is printed continuously on the metal spacer inside the cavity. If you shine a torch or your phone camera on the mark, you will clearly see the unique identification code of the factory of origin, its year of manufacture and the official Saint-Gobain seal that certifies the highest quality of its production process.

The second check is the adhesive label that every piece carries from the processing factory. It shows the full specification you budgeted for, the chosen thicknesses, the dimensions of the thermal cavity and the guarantee seal. Always keep this label, because Climalit offers a ten-year official guarantee against unwanted internal condensation.

Smart glass and the current regulations

Today, replacing old windows is much more than a cosmetic change. The requirements set by the Technical Building Code (CTE) have become very strict in Spain, aimed at reducing the carbon footprint of buildings. Meeting these limits is mandatory if you plan major works on the building envelope.

This becomes clear when you plan ambitious façade improvements for blocks, such as external thermal insulation (SATE), a technique that is growing rapidly because of its strong effectiveness. There is no point wrapping the building in a protective coat if the home's energy then escapes in large amounts through poor or unsuitable glass. Controlling passive losses through glazed elements is the essential first step before sizing expensive mechanical equipment. So when you integrate a modern aerothermal heating and climate control system in your renovation, the airtightness of your windows will greatly boost the efficiency of the whole climate-controlled system.

Why is it still the best-value investment in 2026 renovations?

Renewing a home can be a significant financial effort for families. However, when you objectively analyse the energy costs of recent years, you find that smart glazing pays back the investment surprisingly fast. Living comfortably without wasting money on climate control is not an inaccessible luxury. It is a smart decision in the economic landscape around us in 2026.

If you decide to carry out a full home renovation in Catalonia, you should weigh up the different official grants created to encourage green savings. By demonstrating a verified improvement in your home's performance, you can benefit directly from significant financial returns and tax deductions for improving the thermal insulation of the home's envelope. This offsets the extra cost of high-end glass in advance and multiplies the revaluation of your property on today's sales market.

Frequently asked questions (FAQ)

1. What is the difference between Climalit and Climalit Plus?

The difference lies in the technological layers applied to the glass itself. Traditional Climalit is made of standard plain glass units, whereas Climalit Plus has an invisible low-emissivity or solar-radiation control film built in at the factory. This makes it possible to roughly halve the heat lost from the room to the outside.

2. Can Climalit glass be fitted in old aluminium windows?

Usually, this is not technically advisable. Very old aluminium windows lack the rebate width needed to fit modern units of twenty millimetres or more in thickness, and they lack the structural strength to support their considerable weight. They also have no thermal break in their profiles, which undermines the high thermal performance of the glass.

3. How long does the air cavity of a Climalit last before it loses its gas?

A correctly installed original double glazing unit has a service life of more than twenty-five years without losing significant insulating properties. The double outer seal is the key guarantee against argon gas leaks or water vapour entering. The brand also offers a ten-year guarantee that backs its quality and covers any manufacturing defects.

4. Is triple glazing better than a single cavity?

It depends mainly on your specific location and climate. Triple glazing is the clear ally in areas prone to extreme mountain winters, optimising resistance to cold to the current construction limit. However, in milder or Mediterranean climates, a well-designed high-end double unit provides excellent comfort without adding extra weight to the frames.

Recommended reading to plan your renovation

Climalit glass: features, advantages and made to measure

Climalit glass — or, in the plural, Climalit glass panes — is the double glazing unit with a cavity that this whole guide is about. Among the features of Climalit: two or three panes, an air or gas cavity and a perimeter seal. The advantages of Climalit glass and its benefits are those of insulation: less heat loss, less noise and less condensation. Made-to-measure Climalit glass is produced for any window frame, and triple Climalit glazing adds a third pane wherever climate or noise demands it.

Keep reading

✆ Call✦ WhatsAppGet a quote →