Materials and finishes

What is microcement and where is it used?

By the Tu Nuevo Piso teamPublished 13 July 20268 min read

Tired of the same old tile grout? Does the thought of the noise, dust and mess of breaking up your floor fill you with dread? You are not alone. In 2026, the search for efficient, good-looking and clean building solutions has crowned a clear king of renovation: microcement. The material started out almost as an industrial product, but it has made its way into the most forward-looking homes in Barcelona and around the world. But what exactly is this continuous finish that everyone is talking about, and why does it stir up so much enthusiasm? It is a finish that completely changes the way we redesign our homes today.

In this practical guide we will tell you everything without unnecessary technical language. We will cover its basic composition, its most interesting uses, and a realistic comparison with other materials on the market, so you can decide with confidence and without surprises at the last minute. We want you to know every practical detail, so that your investment turns out to be a complete success.

Key points to know

  • Minimum thickness: At just 2 to 3 millimetres thick, it is applied directly over the existing floor. It is ideal for changing the floor without messy building work.
  • No joints: Being a continuous finish, it creates a striking sense of space and makes everyday cleaning much easier.
  • Extremely versatile: It works very well on floors, walls, ceilings, furniture and even inside showers or swimming pools.
  • Waterproof and hard-wearing: Thanks to the latest polyurethane sealers used today, it resists moisture and everyday wear.

What is microcement, really?

To understand this material, forget the rough concrete of motorways or communal car parks. Microcement is a decorative finish made from a cement base, water-based resins, high-performance additives and mineral colour pigments. Its main advantage is that, unlike traditional cement, it bonds exceptionally well to almost any surface: tiles, terrazzo, plaster, marble or plasterboard.

The best part is that you do not need to trim your doors to install it. The total thickness is between 2 and 3 millimetres, so the structural weight it adds to the floor slab is practically nothing. It comes as a two-part product (powder and liquid that are mixed before use) or as a single-component product that is ready to use. Professional applicators spread it with a trowel entirely by hand. Every microcement application is, by definition, a unique piece of work, with tones and textures that depend entirely on the skill of the tradesperson who applies it.

In today's busy renovation market, having a full home renovation with this material gives a contemporary look that is hard to match. But be careful: its apparent simplicity is a double-edged sword. It is not a product designed for the typical weekend DIY enthusiast. It needs expert hands, very strict drying times and full control of the humidity in the room to avoid cracking. The patience and skill of the applicator directly determine how long the finished floor will last.

Advantages and disadvantages: the honest reality of microcement

As with everything, this material is not perfect. It has undeniable strengths, but also weaknesses you should know about before you commit to covering your home. Overconfidence in a renovation always costs money, so let's be frank about the pros and cons.

Main advantages

  • No rubble and no unbearable noise: Because it goes over the existing surface, you save the skip in the street, the clouds of dust and the complaints from neighbours about the jackhammer.
  • Complete visual continuity: The lack of the expansion joints common in traditional tiles not only makes small rooms look bigger, but also gets rid of the dark corners where dirt always builds up.
  • Made to measure: Do you like a grey industrial look? Perfect. Do you prefer a warm sand tone, a Mediterranean terracotta or even a minimalist white? The range of pigments lets you customise the finish exactly, with matt, satin or glossy textures.
  • Good thermal conductivity: It conducts heat very well, which makes it an excellent partner if you are planning underfloor heating under your new floor.

Disadvantages to consider

  • It needs a perfect base: If the original floor moves, has rising damp or has active structural cracks, the microcement will eventually crack. Preparing the surface is the longest and most critical step in the whole process.
  • Total dependence on the workmanship: A poor applicator can ruin the material completely, leaving uneven trowel marks, damp stains or a weak seal that soaks up grease from the kitchen within two days.
  • Cost of skilled labour: Although you save on removing rubble, it is not a low-cost option because of the number of layers and steps involved. If you want to know more, see our article on microcement in Barcelona and its application cost to understand how the real budget breaks down.

To help you see the key differences with other popular floor finishes used in renovations today, we have prepared this direct comparison table:

MaterialAverage thicknessNeeds building work?JointsWater resistanceVisual style
Continuous microcement2 to 3 millimetresNo, no building workNoneExcellentModern and continuous
Porcelain stoneware8 to 12 millimetresYes, standard building workMinimalExcellentVery varied and imitation finishes
Wood parquet10 to 15 millimetresNo, click systemPresentLowWarm and natural
Trowelled concrete50 to 100 millimetresYes, major building workRequiredMediumIndustrial look
Epoxy resin2 to 4 millimetresNo, no building workNoneHighGlossy and smooth

Where is microcement used? Its best applications

The material is so versatile that we often have clients who want to cover their whole home with it, from top to bottom. Although that is technically possible, it is better to know where it works best. Its aesthetic and practical possibilities multiply in several key areas of the home:

1. The bathroom of the future: maximum hygiene

Designer bathrooms have found their perfect match in microcement. Because the same finish can cover the walls, the floor and even the shower area, the grout lines of traditional tiles that turn black over the months disappear. However, to make it last, you must apply a correct waterproofing system for bathrooms before spreading the microcement. Take a look at our bathroom renovation guide for examples of how to plan it.

2. Built-in kitchens and cutting-edge worktops

Do you like the idea of an open kitchen that flows into the living room? Microcement lets you connect the two spaces visually by running one continuous floor with no transition strips. But it does not stop there. It is increasingly common to see worktops and kitchen fronts covered in this material, creating a striking, seamless block. However, given the heavy use of oil, lemon juice and knives, you must choose the protective varnishes very carefully. If you are looking for ideas on materials for a kitchen renovation, you will see how this option stands out for its clean look.

3. Open-plan living rooms and busy hallways

The living room floor is the showpiece of any modern home. A microcement floor in neutral or earthy tones reflects natural light beautifully and works as a neutral backdrop that makes any furniture you place on it stand out. It also copes very well with the daily traffic of the whole family, including pets, as long as you fit protective pads on the chair legs to avoid deep scratches from constant rubbing.

4. Terraces and integrated outdoor spaces

Do you want to connect the indoor living room with the porch or balcony seamlessly? Outdoor microcement has rougher textures that prevent slipping when it rains. Using the same colour inside and outside creates a striking visual effect that doubles the sense of space in your living room.

The careful step-by-step application

We cannot stress this enough: microcement is not poured like a self-levelling paint. Its application is a careful, hand-finished process with several delicate stages. To explain why it takes several days to apply, here is a summary of the process normally followed on a professional job:

  1. Preparing the base: The original floor is cleaned of dust and grease.
  2. Primer and mesh: A fibreglass mesh and a bonding primer are fitted.
  3. Base (two coats): A thick preparation cement to level the base surface.
  4. Finish (two coats): A fine coloured cement that defines the final decorative texture.
  5. Sealing (three coats): A high-strength, waterproof protective polyurethane varnish.

Daily cleaning and maintenance: keeping it spotless

Looking after a continuous floor like this is very simple, but there are a few common-sense rules you must never break. The worst enemy of microcement is not water, but abrasive products that permanently damage the protective polyurethane layer.

For everyday cleaning, forget pure bleach, ammonia, concentrated vinegar and metal scourers. All you need is lukewarm water and a neutral, pH-balanced soap. To keep the satin shine and the protective properties over the years, we recommend applying diluted waxes made specifically for continuous floors from time to time. If you treat it with the same care as a wooden parquet, your microcement floor will look just as it did on day one for decades. Good maintenance prevents premature wear of the sealing resins that are most exposed to use.

Frequently asked questions about microcement

Can it be applied over old bathroom tiles?

Yes, absolutely. Thanks to its excellent adhesion, it is applied over the ceramic tiles without producing any rubble.

Does it crack easily over time?

No, as long as the substrate is sound and the installer has fitted the fibreglass mesh.

Is microcement cold to the touch at home?

Like any mineral surface, it feels cooler to the touch than wood when the heating is off. On the other hand, it conducts heat well, so it works without any problem with underfloor heating systems.

Do pets’ claws scratch it?

The polyurethane varnish stands up very well, but it is best to avoid dragging heavy objects across it without protection.

Keep reading

✆ Call✦ WhatsAppGet a quote →