Materials and finishes
7 guides on materials and finishes.
Large-format tile or metro tile: joints, rectified edges and which to choose
Rectified large-format tile gives thin joints and needs a flat wall; metro tile forgives uneven walls but has more grout to clean.
Materials and finishesWhich floor to choose: porcelain, parquet, microcement and vinyl compared
A practical comparison of floors for 2026 renovations: porcelain stoneware, parquet, microcement and SPC vinyl, with costs, pros, cons and installation.
Materials and finishesTypes of paint for your home: emulsion, enamel, mineral and stucco
A 2026 guide to paint for the home. We compare emulsion, enamel, mineral paint and stucco: the differences, best uses and coverage per litre.
Materials and finishesWhat is microcement and where is it used?
What microcement is, its pros and cons, where to use it (floors, bathrooms, kitchens) and why it has become a go-to finish for 2026.
Materials and finishesWhat is Climalit glass and how to choose the best specification for your new windows?
What Climalit glass is, how double glazing works and how to choose the right specification for your new windows. Genuine Climalit explained.
Materials and finishesMicrocement in Barcelona: price, application and where to use it
Microcement is a popular choice in Barcelona renovations because of its seamless look. Here is what it costs, how it is applied and which surfaces suit it best.
Materials and finishesFloor renewal without building work in Barcelona: options and prices
Renewing a floor does not always mean breaking up the old one and creating rubble. Here are the options for changing floors without building work in Barcelona, with guide prices and the cases where each one works.

