Blog category

Kitchens

8 guides on kitchens.

Kitchens

L-shaped, U-shaped, single-wall or galley kitchen: which to choose for your space

The width of the room rules out layouts before taste does. Here is which one fits your kitchen and what work moving it to another wall involves.

19 November 2026 · 6 min read
Kitchens

Renovating a kitchen step by step: what happens first and which trade comes in at each stage

Measure, order, demolish, install, tile and fit: the order of a kitchen renovation, which trade enters at each stage and what is checked before moving on.

13 November 2026 · 10 min read
Kitchens

Kitchen worktops: Silestone, Dekton, granite or porcelain

Thinking of changing your worktop? We compare Silestone XM, Dekton, granite and porcelain: pros, cons, prices and what to expect in everyday use.

22 July 2026 · 8 min read
Kitchens

Open vs closed kitchen: pros, rules and when each one makes sense

Open or closed kitchen? We compare the pros and cons, the habitability rules in Catalonia and when each layout makes sense for your home.

20 July 2026 · 8 min read
Kitchens

Which services to renew when renovating a kitchen: electrics, gas and plumbing

A 2026 guide to renewing the electrics, gas and plumbing in a kitchen renovation: regulations, modern materials and practical advice for the site.

9 July 2026 · 8 min read
Kitchens

Kitchen renovation materials: worktops, wall tiles and flooring

A 2026 guide to kitchen renovation materials in Spain: a technical comparison of worktops, wall tiles and flooring, with real installed prices.

9 July 2026 · 9 min read
Kitchens

Kitchen renovation budget: items, materials and how to stay on track

What a kitchen renovation costs in Spain in 2026, the main budget items, worktop and cabinet material choices, and practical ways to keep costs under control.

9 July 2026 · 10 min read
Kitchens

Kitchen renovation in Barcelona: prices and trends for 2026

What a kitchen renovation costs in Barcelona today, how opening the kitchen to the living room changes the price, and which layouts and materials are trending in 2026.

30 June 2026 · 5 min read
✆ Call✦ WhatsAppGet a quote →