Kitchens

Which services to renew when renovating a kitchen: electrics, gas and plumbing

By the Tu Nuevo Piso teamPublished 9 July 20268 min read

Starting a kitchen renovation is exciting. We spend hours looking through magazines, deciding whether we want a porcelain island or designer cupboards. But let's be realistic: if you fit the most expensive worktop on the market over corroded copper pipes, or over an old electrical network without an earth connection that is forty years old, you are building a gloomy house of cards. The insides of your kitchen decide whether the investment lasts for decades or whether, within three months, you have a silent but serious water leak that wrecks your new tiles completely.

Renewing the hidden services, plumbing, electrics and gas, is the real structural backbone of any safe renovation. They are not the most eye-catching part of the budget, but they are the most critical factor in avoiding incidents that would reduce the value of your home. In this article we look in depth at the Spanish regulations in 2026, new fitting materials and the serious mistakes that installers often make, giving you technical guidance so your project is a complete success.

The essence of technical renovation: quick tips

  • Do not keep old metal pipes: Switching to multilayer pipes avoids silent leaks, the build-up of corrosion and recurring blockages.
  • Follow the current electrical rules: The Spanish low-voltage regulations (REBT) require high-power appliances to have their own fully separate circuits, using dedicated cable runs.
  • Maximum safety with gas: Copper soldered joints and approved ventilation grilles protect your home from a build-up of fumes.
  • Plan the process intelligently: It is crucial to understand how to organise a full renovation step by step: work order and phases, so you do not make the mistake of tiling the walls before the pipes are run.
  • Manage the budget for the works properly: A transparent budget prevents unfair surcharges when the wall finishes are opened up in your home.

1. Plumbing: from metal pipes to multilayer piping

If you are renovating the kitchen and your home is more than fifteen years old, keeping the original pipes is a false economy that experts advise against. For decades, lead, galvanised iron and even copper were the norm in Spanish homes. But the reality is stubborn: running tap water carries limescale, sediment and micro-organisms that narrow the inside diameter of metal pipes, causing pinholes and hairline breaks behind wood-clad units.

To eliminate these risks at source, in our 2026 kitchen renovations we use almost exclusively multilayer pipes, made of PEX plastic with an inner aluminium layer. Multilayer piping has clear advantages over the old solutions. It does not corrode galvanically, it resists limescale build-up, and it copes perfectly with the most extreme temperature changes without cracking. It is installed with as few hidden tin solder joints as possible, which are usually the main cause of serious damp behind partitions.

You also need to get the sink's waste drainage right. PVC waste pipes need generous diameters of around 40 mm and a constant fall of no less than 2% towards the building's vertical main drain. Connecting the traps badly, or leaving closed ninety-degree bends, will sooner or later lead to noisy pipes, repeated grease blockages and unpleasant smells.

So when you work through the kitchen renovation budget: line items, materials and how to avoid overspending, make sure the technical demolition line always includes removing corroded pipes. Also, here is a useful site tip: ask your plumber to fit individual isolation valves for the taps and for each built-in appliance. Having these small angle valves behind the kitchen fronts means you will not have to cut the water supply to the whole home if a fault occurs.

2. Electrical installation: the REBT rules on power

Most modern kitchens have self-cleaning pyrolytic ovens, high-suction hoods, full induction hobs and built-in espresso machines, all with very large and simultaneous electricity demands. The Spanish low-voltage regulations (Reglamento Electrotécnico para Baja Tensión, REBT) set out, in complementary technical instruction ITC-BT-25, how to lay out the separate circuits this demanding room needs, in a clean and safe way.

In any serious full renovation of the home's electrical network, your authorised electrician has a duty to design and run separate cable runs from the main distribution board:

  • Circuit C1: General lighting in the kitchen and surface-mounted LED lights, with 1.5 mm² cable and a 10-amp circuit breaker.
  • Circuit C2: Fridge and general auxiliary sockets, run with 2.5 mm² cable and a 16-amp circuit breaker.
  • Circuit C3: Electric oven and power induction or ceramic hob, with 6 mm² cable and a 25-amp circuit breaker.
  • Circuit C4: Supplies the washing machine, dishwasher and water heater together, with 4 mm² cable and a 20-amp breaker. However, specialists strongly recommend splitting this group into separate branches (C4.1, C4.2 and C4.3), each with its own 16-amp breaker and 2.5 mm² cable.
  • Circuit C5: Sockets for small auxiliary appliances on the worktop, using 2.5 mm² cable and a 16-amp protective breaker.

As well as sizing the lines correctly, there are very strict spacing rules that must be followed. The Spanish low-voltage regulations expressly prohibit fitting sockets less than 50 centimetres from the metal taps of the sink or from high-temperature cooking zones, to prevent accidental connections or short circuits from water contact. If you want to know how the regulations govern cables and safety distances near drains, in a similar way to bathroom drainage, take a look at our study on the electrical protection zone in bathrooms: ITC-BT-27 explained, where we clarify these basic safety boundaries.

3. Gas installation: regulatory precision above all

Despite the dominance of full induction hobs, some people in Spain remain loyal to classic gas flame cooking. Similarly, many homes still have a sealed wall boiler inside the kitchen, heating water with piped gas.

In this area, there is no room for error or improvisation in the masonry work. Gas connections are governed by the technical requirements of the Thermal Installations in Buildings Regulation (RITE) and the UNE 60670 standards. Any change to pipe diameters, joints or the relocation of a forced-draught boiler must be carried out by a certified gas engineer, who checks the pressures and issues an authorised gas certificate (boletín) once the work is finished.

Technically, metal gas pipes (usually rigid copper joined with silver brazing alloy) must always run across the visible surface of the wall or in ventilated false ceilings. It is forbidden to bury these pipes in mortar or plaster without fitting ventilated protective ducts that vent outside, so that explosive mixtures cannot build up.

On another note, active gas burners mean you must not block the metal ventilation grilles that connect the wet rooms with light wells. If you want an easy way to find accredited, affordable technicians who know these complex regional safety rules, to help you plan safe installation work at home, visit the homepage of Tu Nuevo Piso, a useful technical resource to help you search with confidence.

4. The order of work really does change the result

A serious mistake made by first-time self-builders is getting the sequence of the trades wrong. They think the renovation starts with choosing elegant worktops, when the basics are the initial technical setting-out of the hidden service routes.

Planning the refit demands strict discipline: fully clear out the old partitions and wall finishes, cut the wall chases needed to run electrical and plumbing pipes, install the multilayer water pipes and the electrical conduit, carry out preventive watertightness tests to avoid unwanted drips before anything is covered, render the walls with plaster or cement and, finally, tile the kitchen walls for good.

That is why agreeing a clear contract from the start is a top priority. Understanding the commercial consequences of choosing a fixed vs open quote in renovations: what it is and why it matters is essential to lock down the technical costs of the services and avoid unexpected charges when the walls are opened up. Once that is settled, you can choose the kitchen renovation materials: worktops, tiling and floors, comparison and prices that best suit your final aesthetic preferences.

Summary table of installation requirements

To simplify technical decisions with your installers, here is a complete summary table for 2026, setting out the key reference points for the main networks:

NetworkRecommended lifespanModern materialsSpanish standardCommon fault
Plumbing (mains water)25 to 30 yearsPressed multilayer pipesSpanish CTE DB-HS4Forgetting to fit individual local isolation valves for each appliance
Drainage (waste)Indefinite (if maintained)Rigid PVC pipesSpanish CTE DB-HS5Gradients below two per cent
Electricity (power)20 to 25 yearsHalogen-free copper cableREBT ITC-BT-25 industrialMixing live and neutral conductors in the same corrugated conduit
Gas distributionSubject to certificateBrazed copperRITE and UNE standardsHiding runs in blind boxes

Common questions about plumbing and electrical installations

Do I have to renew the plumbing if the pipes are not causing problems?

There is no retrospective law that obliges you to replace dry internal pipes if you are not doing building work. However, when you undertake a full renovation of your partitions, renewing them becomes a logical, practical necessity. Fitting smart units over old pipes clogged with rust will void warranties and expose your savings to costly breakages that force you to chisel out your new tiles.

Where should the sockets for built-in appliances such as dishwashers go?

Putting them directly behind the appliance is a common mistake, because these machines fit with millimetre-level clearance at the back. If you place protruding sockets on the rear wall, the unit will catch on them. Qualified fitters always position them in the adjacent cabinets, usually under the sink unit, guiding the cables safely out of the way.

What happens to the power contracted for my home when I install electric induction?

These hobs draw peak demands of up to 7 kW. If you run them at the same time as the washing machine, the power limiter will cut the supply in standard low-voltage homes. You must ask your electrician to arrange an electrical certificate (boletín) to increase the contracted power, so you avoid annoying power cuts in winter.

How does the gas regulation affect me if I move my boiler?

Moving a gas appliance means meeting the basic flue requirements of the RITE on horizontal distances from neighbours' windows. Rigid copper for these installations must never run hidden unless you use continuous ventilated sleeves. You must pass an official leak test to get your new authorising certificate (boletín), issued by the regional industry department.

Upgrading the hidden systems in your home is certainly not the most glamorous part of a full renovation, but it contributes the most to your daily stability over the long term. Investing in multilayer pipework with a warranty, consumer units that meet the REBT and gas runs signed off by official technicians is the only safe way to get value from your money and protect your home from annoying maintenance surprises. The next time you see a magazine kitchen, remember that its appeal lies not in the lacquered units on the outside, but in the solid, high-quality installations working hidden behind the plaster walls of your renewed family home.

Keep reading

✆ Call✦ WhatsAppGet a quote →