Kitchens

Open vs closed kitchen: pros, rules and when each one makes sense

By the Tu Nuevo Piso teamPublished 20 July 20268 min read
Should you knock the wall down or leave it as it is? This is the question that comes up as soon as someone decides to rethink their home. Choosing between an open-plan kitchen, the classic integrated living-dining room, and a separate closed kitchen is about more than a magazine-style look. In 2026, the way we live in our homes has changed a great deal. People want more space, more light and more time together. The kitchen is no longer a cut-off room where meals are cooked out of sight. It is the centre of the home: a place to work, to talk, to help the children with their homework and to spend free time. But there is no perfect answer. Open-plan kitchens have strong critics and strong fans, and the traditional closed kitchen still has good arguments in its favour. To avoid regrets once the work is finished, look closely at the pros, the cons and the technical points that will decide whether the layout suits your home.
Key points of this quick guide:
  • Light and space versus privacy and quiet: An open layout lets in much more natural light. A closed kitchen gives you full control over noise and cooking smells.
  • Mandatory habitability requirements: Any opening that changes the layout must meet the ventilation rules of the Technical Building Code (CTE).
  • Habitability certificate: Any change to the partition walls means checking the minimum room sizes, so the home can still get the official habitability certificate (cédula de habitabilidad) from your autonomous community.
  • Hybrid glass partitions: A third option that connects the two spaces visually and still keeps grease under control.

Open-plan kitchen: visual space, light and social life

The number of kitchens built into the living-dining room keeps growing, and this is not just a passing aesthetic trend. It is an architectural answer to the way people live today. In big European cities, homes are often quite small, so taking down old solid partitions lets you make the most of every useful square metre. Without the barriers, daylight from the big windows of the living room flows freely to the cooking area, and the dark, cramped kitchens of the past disappear. This matters a lot if you plan to renovate a flat with a small floor area, because joining the spaces creates a sense of openness and room that no other change gives you as easily. Then there is the human side. Cooking is no longer a lonely job with your back to everyone. The person cooking can join the conversation with guests, keep an eye on the children's homework or watch their favourite series at the same time. This changes the feel of the home. It encourages family life together and makes the home feel much more generous than it really is. But be realistic: an open-plan kitchen means putting up with some downsides before the first hammer blow. The most obvious one is smell and grease. However powerful the extractor is, frying and long-cooked stews will leave some trace on the sofas. The noise of appliances (the dishwasher in full cycle, the blender, the extractor on full power) can also compete with the TV or with a quiet read in your favourite armchair.

Closed kitchen: keeping smells in and the room tidy

Closed kitchens are still very much alive. For lovers of traditional cooking, or for anyone who hates seeing a dirty pan on the worktop while they eat in the living room, a separate kitchen is the only real option. A closed door is a very good barrier against noise and smells. It does not matter if you were in a hurry and left the pans unwashed: you close the door, and the living-dining room still looks spotless, calm and tidy. A separate room also lets you use the wall space for storage from floor to ceiling, without worrying about exposed units spoiling the look of the flat. You can choose tougher, bolder floors without having to match them to the living room. If you love cooking slowly, experimenting with strong spices or simply want a break from family noise while you prepare food, a traditional, enclosed kitchen is your best bet.

Rules and legal points: what Spanish law requires

Before you call a demolition team and start knocking through walls, stop and check the habitability rules. You cannot take down walls lightly just because the plan looks good on paper. In Spain, each autonomous community sets its own minimum habitability conditions for homes, on top of the rules of the Technical Building Code that apply across the whole country. One of the first technical hurdles when you change any wet room is making sure the falls are right, so that the wet area connects properly to the drainage and waste pipe system of the home, without smells or blockages. Using Catalonia as the example, and Decree 141/2012 on habitability conditions, the technical inspectors check shared spaces created by joining rooms very closely. If your project joins the kitchen and the living room into one open space (living-dining-kitchen), that combined room must have a useful floor area of at least 20 square metres, with some exceptions depending on the year the original building was built. If your flat does not have that useful area, the change will be an infringement, and it will stop the home's paperwork being renewed or validated. You also need to pay close attention to the energy performance and safety of your heating and hot water systems. When you remove a dividing wall, the living area shares the same space as the cooker. If you have an old open-flue gas boiler or non-sealed gas appliances, Spanish law does not allow them to share this new room. Solving this legal and safety problem often means a full renovation of the plumbing, gas and electrical systems for the whole space. The old gas boiler is often replaced with aerothermal heat pumps or modern electric water heaters that meet the strict current rules.

The middle option: glass partitions and semi-open kitchens

Why choose just black or white when there are so many shades of grey? In modern homes, the semi-closed or mixed kitchen is becoming popular. The idea is simple and clever in practice: the heavy solid walls are removed and replaced with a light partition made of slim metal frames and large glass panels, which connect the neighbouring areas visually. This hybrid system gives the space all the natural light, the views and the look of an open kitchen. Its real advantage shows up during the noisier or smokier jobs. Slide the heavy glass doors shut, or close the hinged fronts, and both rooms get their own quiet back straight away, and grease does not spread through the living room. It is, in short, the favourite choice of people who want a loft look without putting up with its usual practical drawbacks.

Comparison table: how each kitchen type performs

Below we assess the daily performance of each option, so you can see which one fits your household's priorities best:
Key factorOpen-plan kitchenClosed kitchenSemi-closed kitchen (glass)
Smell and fume controlLow. Relies entirely on the power of the extractor.Excellent. A sealed, airtight wall stops smells from leaking out.High. Closing the glass panels contains strong fumes.
Natural lightMaximum. Uses the daylight from the windows and reaches the corners that have no windows.Very limited. Limited to its own windows, so it often needs artificial light.Excellent. Lets sunlight through the glass easily.
Overall sound insulationMinimal. You hear the dishwasher and waste disposer from the living area.Excellent. Insulates the home well from appliance noise.Good. The glass softens much of the everyday mechanical noise.
Ease of cleaningDemanding. Worktops have to be kept clear, because everything shows.Easy. Tidying can wait without spoiling the look of the living room.Medium to demanding. Quick to clean, but marks show more on the glass.
Flexibility and social lifeUnbeatable. Encourages everyone to share the cooking.Low. The person cooking is partly cut off from the others.Balanced. Lets you keep visual contact and open up for social events.

Which one suits you? Key points for the decision

To narrow down your choice, be honest about your household's habits and the physical limits of your flat. Before you hire anyone, work out the breakdown of the kitchen renovation budget. Answer these everyday questions honestly. Go for an open kitchen if: * Your home is small and you need to gain usable width by removing unneeded walls, so the shared space feels warmer. * You prefer to have breakfast or snacks at a comfortable island, and you want to be close to the people you live with at all times. Choose a closed kitchen if: * You want to sit down to dinner with the living room looking perfect, without the stress of seeing dirty dishes after cooking complicated recipes. * You cook fish on the griddle and fry food every day, and you hate the smoke sticking to your designer upholstery. One solution used in a real open-plan kitchen project in Gracia was slim steel-frame sliding partitions. Residents could move between the two areas as they needed, combining the social side of the dining room with a proper workspace for cooking.

Frequently asked questions about kitchen layouts

What are the minimum ventilation requirements when you open up a kitchen?
The Technical Building Code, in its health and hygiene section (salubridad), says kitchens must be ventilated mechanically and separately from the general ventilation of the home. In practice, fumes must be taken out through a dedicated duct to the roof. In modern shared living rooms, extractor hoods with a higher airflow are needed to clear the grease from the air.
When do you need an architect or technical architect (arquitecto técnico) for a kitchen renovation?
Whenever your renovation involves knocking down walls that could change the layout or affect the building's load-bearing structure. Only a qualified architect or technical architect can make sure the wall is removed safely, by drawing up the technical project you need to apply for the municipal licence.
How does opening up the kitchen affect the finishes I choose?
When you join the spaces, the worktop and floor materials have to look right together. Large-format porcelain tiles or highly water-resistant laminate floors are essential to make the kitchen and living room look like one clean space, with fewer visible joints and better durability overall.
What steps should I follow if I decide to change the layout?
To keep the whole job in order, follow a complete guide to home renovation that sets out the sequence of works. The process usually starts with technical drawings, then applying for the minor works licences, removing the rubble from the partition walls and fully updating the installations.
Recommended extra reading:

Keep reading

✆ Call✦ WhatsAppGet a quote →