Energy efficiency
7 guides on energy efficiency.
Underfloor heating in a renovation: water vs electric
Thinking of underfloor heating for your renovation? We compare water and electric systems, real running costs, minimum build-up and floor compatibility.
Energy efficiencySolar panels and self-consumption at home: savings and feasibility
A 2026 guide to home solar self-consumption: technical feasibility, installation costs, payback time and income tax deductions of up to 40%.
Energy efficiencyWhat is a thermal break (RPT)?
What a thermal break (RPT) is, how the polyamide strip in aluminium window frames works and why it matters for your renovation in 2026.
Energy efficiencyWhat is the ICAEN?
What the ICAEN (Catalan Energy Institute) is, what it does in the energy certificate register and how it affects your renovation.
Energy efficiencyWhat is aerothermal heating?
What aerothermal heating is, how a heat pump works, how much it can save, what it costs to install and the grants available in 2026.
Energy efficiencyWhat is SATE (external thermal insulation system)?
What SATE external thermal insulation is, how its layers work, which panels to choose and what it means for your building under the 2026 Building Code.
Energy efficiencyEnergy certificate in a renovation: what it is for and how to improve it
What the energy certificate is for in a 2026 renovation, how it can unlock income tax deductions and practical ways to raise your energy rating.

